December 2024 Quarterly Activities & Cash Flow Reports
Released
Released
Announcement PDF
ASX RELEASE
30 JANUARY 2025
QUARTERLY ACTIVITIES REPORT DECEMBER 2024
HIGHLIGHTS
• Completion of five hole regional RC drilling program at the Mulga Tank Ni-Co-Cu-PGE Project
• First drilling to test interpreted komatiite channel flows - results confirm highly prospective highMgO komatiite lithologies with fertile Ni, S and chalcophile element results
• Petrological investigation of holes MTRC062 (EIS6) and MTRC063 (EIS7) demonstrate the visible
disseminated sulphide mineralisation to be predominantly pentlandite (nickel sulphide)
• Remaining Phase 3 RC assay results received with all holes showing broad zones of nickel
sulphide mineralisation including multiple holes with ~200m intersections:
MTRC055
216m at 0.30% Ni, 144ppm Co, 109ppm Cu, 20ppb Pt+Pd from 84m S:Ni 1.2
MTRC056
201m at 0.31% Ni, 134ppm Co, 176ppm Cu, 15ppb Pt+Pd from 81m S:Ni 0.9
• Multiple zones of higher grade results including:
MTRC051
3m at 0.70% Ni, 400ppm Co, 0.38% Cu, 0.17g/t Pt+Pd from 147m
inc. 1m at 1.18% Ni, 650ppm Co, 0.67% Cu, 0.31g/t Pt+Pd from 148m
MTRC055
11m at 0.63% Ni, 211ppm Co, 535ppm Cu, 4ppb Pt+Pd from 175m
inc. 4m at 1.16% Ni, 345ppm Co, 0.13% Cu, 6ppb Pt+Pd from 182m
that inc. 2m at 1.97% Ni, 542ppm Co, 0.26% Cu, 12ppb Pt+Pd from 183m
which inc. 1m at 2.46% Ni, 641ppm Co, 0.43% Cu, 18ppb Pt+Pd from 183m
7m at 0.48% Ni, 226ppm Co, 248ppm Cu, 42ppb Pt+Pd from 234m
inc. 1m at 1.26% Ni, 489ppm Co, 431ppm Cu, 49ppb Pt+Pd from 239m
MTRC056
27m at 0.45% Ni, 172ppm Co, 263ppm Cu, 51ppb Pt+Pd from 81m
inc. 1m at 1.25% Ni, 398ppm Co, 0.15% Cu, 0.33g/t Pt+Pd from 96m
• Running total of 55 of 58 RC holes mineralised across all three phases of RC drilling with 23
intersections >1% Ni discovered within these holes over ~2.5km2 area
• Ongoing initial metallurgical test work on material from diamond hole MTD029 (EIS3) successfully
producing nickel concentrate by standard flotation methods
• Binding agreement to extinguish the royalty over tenement E39/2132 at the Mulga Tank Project - a
significantly value accretive transaction that opens a range of future royalty funding options
• Capital raise of $1,234,625 during the period to progress exploration at Mulga Tank
• Strategic review of the Company’s project portfolio in order to streamline and focus exploration
efforts during 2025
Western Mines Group Ltd
Level 3, 33 Ord Street
West Perth WA 6005
ASX:WMG
Telephone: +61 475 116 798
Email: contact@westernmines.com.au
www.westernmines.com.au
Shares on Issue: 90.35m
Share Price: $0.14
Market Cap: $12.65m
Cash: $1.08m (31/12/24)
1
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
Western Mines Group Ltd (WMG or Company) (ASX:WMG) is pleased to provide shareholders with the following
Quarterly Activities Report, and accompanying Appendix 5B, for what has been another successful quarter for
the Company. WMG’s focus for the period remained the flagship Mulga Tank Ni-Co-Cu-PGE Project where
results continue to validate the discovery of a major nickel sulphide mineral system.
At the beginning of the quarter the Company announced the completion of the Phase 3 reverse circulation (RC)
drilling program, which included five additional regional holes, four of which were drilled with the aid of an EIS
grant (ASX, Regional EIS Drilling Confirms Belt-Scale Mineral System, 3 October 2024). The regional holes
(MTRC059 to MTRC063) were successful in validating the geological interpretation of the wider Mulga Tank
Complex. Results confirmed highly prospective high-MgO komatiite lithologies with fertile Ni, S, and chalcophile
elements, predominantly abundant pentlandite (nickel iron sulphide) mineralisation and only minor pyrrhotite and
pyrite (iron sulphides) observed (ASX, Assays and Petrology Confirm Fertile Komatiite System, 3 December
2024).
Final assay results were also received for the remaining Phase 3 RC holes drilled within the main body of the
Mulga Tank Complex, with extensive intervals of nickel sulphide mineralisation observed in all of the holes (ASX,
Further High-Grade Intervals up to 2.46% Ni 0.43% Cu, 9 October 2024; Further Phase 3 Assay Results up to
1.25% Ni 0.60% Cu, 17 October 2024). A number of the holes returned broad intersections of mineralisation
over continuous ~200m lengths including:
MTRC052
192m at 0.28% Ni, 125ppm Co, 63ppm Cu, 11ppb Pt+Pd from 114m S:Ni 0.8*
MTRC053
205m at 0.28% Ni, 129ppm Co, 85ppm Cu, 16ppb Pt+Pd from 87m S:Ni 1.0*
MTRC054
200m at 0.28% Ni, 124ppm Co, 31ppm Cu, 10ppb Pt+Pd from 100m S:Ni 0.6*
MTRC055
216m at 0.30% Ni, 144ppm Co, 109ppm Cu, 20ppb Pt+Pd from 84m S:Ni 1.2*
MTRC056
201m at 0.31% Ni, 134ppm Co, 176ppm Cu, 15ppb Pt+Pd from 81m S:Ni 0.9
MTRC057
216m at 0.27% Ni, 139ppm Co, 159ppm Cu, 13ppb Pt+Pd from 84m S:Ni 1.1*
MTRC058
209m at 0.29% Ni, 132ppm Co, 50ppm Cu, 18ppb Pt+Pd from 91m S:Ni 0.8*
* Ending in mineralisation
Further intersections of shallow higher grade results were encountered in a number of the holes. A total of 23
intersections >1% Ni have now been observed within the 58 RC holes to date. Relatively shallow higher grade
results received in the period within the central core area of the Mulga Tank Complex include:
MTRC051
3m at 0.70% Ni, 400ppm Co, 0.38% Cu, 0.17g/t Pt+Pd from 147m
inc. 1m at 1.18% Ni, 650ppm Co, 0.67% Cu, 0.31g/t Pt+Pd from 148m
MTRC055
11m at 0.63% Ni, 211ppm Co, 535ppm Cu, 4ppb Pt+Pd from 175m
inc. 4m at 1.16% Ni, 345ppm Co, 0.13% Cu, 6ppb Pt+Pd from 182m
that inc. 2m at 1.97% Ni, 542ppm Co, 0.26% Cu, 12ppb Pt+Pd from 183m
which inc. 1m at 2.46% Ni, 641ppm Co, 0.43% Cu, 18ppb Pt+Pd from 183m
7m at 0.48% Ni, 226ppm Co, 248ppm Cu, 42ppb Pt+Pd from 234m
inc. 1m at 1.26% Ni, 489ppm Co, 431ppm Cu, 49ppb Pt+Pd from 239m
MTRC056
MTRC057
ASX:WMG
27m at 0.45% Ni, 172ppm Co, 263ppm Cu, 51ppb Pt+Pd from 81m
inc. 1m at 1.25% Ni, 398ppm Co, 0.15% Cu, 0.33g/t Pt+Pd from 96m
1m at 0.88% Ni, 449ppm Co, 0.60% Cu, 71ppb Pt+Pd from 221m
www.westernmines.com.au
2
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
The Company was corporately active on a number of fronts during the quarter. A binding Royalty
Extinguishment Deed to buyback and extinguish the 1% NSR royalty over tenement E39/2132 held by the
original tenement vendor (an unrelated party to the Company) was completed at the end of the period. This
strategic transaction is significantly value accretive for the project and Company. It also opens a range of future
project funding options through the re-sale of a royalty.
The Company undertook a strategic review of its project portfolio during the quarter, with a view to streamlining
and better focusing exploration efforts during 2025. This resulted in the surrender and expiry of the Broken Hill
Bore and Rock of Ages projects. A number of other projects have been earmarked for possible sale or joint
venture where it is thought value can be realised.
In November, the Company successfully completed a capital raise of $1,234,625 (before costs) with
commitments received to issue 8,230,833 fully paid ordinary shares at an issue price of $0.15 per share. Funds
will be used to support ongoing exploration at Mulga Tank (ASX, Capital Raise to Continue Progressing Mulga
Tank, 25 November 2024; Capital Raise Update, 28 November 2024).
PROJECT OVERVIEW
Figure 1: Map of WMG project locations
ASX:WMG
www.westernmines.com.au
3
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
MULGA TANK
The Mulga Tank Project comprises exploration licences E39/2132, E39/2134 and E39/2223 and exploration
licence application E39/2299, covering the Minigwal Greenstone Belt, 190km east-northeast of Kalgoorlie. The
Minigwal Greenstone Belt is a NNW trending linear sequence of predominantly mafic and ultramafic lithologies; it
is very under explored due to the presence of shallow sand cover and presents a “frontier” exploration
opportunity for major Ni-Co-Cu-PGE and orogenic gold deposits.
Exploration results from the Company’s various drilling programs at the Mulga Tank Project over the last two
years have demonstrated significant nickel sulphide mineralisation and an extensive nickel sulphide mineral
system within the Mulga Tank Ultramafic Complex.
At the beginning of the quarter, the Company completed an additional five hole, 1,411m regional component of
a larger 24 hole, ~7,400m Phase 3 RC program (ASX, Regional EIS Drilling Confirms Belt-Scale Mineral System,
3 October 2024). Four of the holes were drilled with the aid of one of WMG’s current EIS grants (ASX, WMG
Wins Two More EIS Awards to Drill Mulga Tank, 29 April 2024). The regional holes were designed to test the
interpreted komatiite channel system (based on aeromagnetic interpretation), extending from the main body of
the Mulga Tank Complex, and the interpreted lithologies of the Minigwal Greenstone Belt.
PREVIOUS RC DRILLING PROGRAMS
At the end of 2023 the Company completed a 22 hole reverse circulation (RC) drilling program. This was the first
drilling designed to systematically test the lateral continuity of the shallow, uppermost zone of disseminated
nickel sulphide mineralisation within the main body of the Mulga Tank Ultramafic Complex (ASX, RC Drilling
Program Commences at Mulga Tank, 20 September 2023; RC Drilling Expansion and Drilling for Equity, 17
October 2023; Completion of 7000m RC Drilling Program at Mulga Tank, 7 November 2023).
Modelling of the Phase 1 RC results identified a significant shallow mineralised zone, which has been reported
as an Exploration Target, in according with JORC 2012 (ASX, Mulga Tank JORC Exploration Target, 5 February
2024). The Company’s internal modelling work was reviewed by independent consultants CSA Global. The
Exploration Target with an estimated range of potential mineralisation is:
350 to 2,200 million tonnes grading 0.24% to 0.35% Ni, 120 to 150ppm Co with S:Ni 1.1 to 1.3
In the first half of 2024, the Company completed a further 17 hole, 5,534m Phase 2 RC program predominantly
focused on infilling the higher grade core area identified by the Company’s Exploration Target modelling (ASX,
2024 Exploration Programs Commence at Mulga Tank, 29 January 2024; Completion of Phase 2 RC Drilling
Commencement of EIS3, 8 April 2024). The RC holes were planned around Phase 1 holes MTRC015 to
MTRC018 in the centre of the main body of the Complex, in particular around MTRC016 that returned 200m at
0.31% Ni (including 35m at 0.45% Ni) from 103m. The drill hole spacing in this central area was reduced to
approximately 200m x 200m (from the initial 500m x 300m spacing of the Phase 1 program) covering an area of
around 800m x 900m.
During the previous quarter the Company completed a further 19 holes of a Phase 3 RC drilling program within
the main body of the Complex (ASX, First 19 Phase 3 RC Holes Complete at Mulga Tank, 2 September 2024).
The program was focused on both further infill around previous drilling in the core of the Complex and also
extending mineralisation outside of previous tested zones and the JORC Exploration Target model shell.
ASX:WMG
www.westernmines.com.au
4
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
Final assay results were received at the beginning of the period for the remainder of these 19 Phase 3 RC holes,
with extensive intervals of nickel sulphide mineralisation observed in all of the holes (ASX, Further High-Grade
Intervals up to 2.46% Ni 0.43% Cu, 9 October 2024; Further Phase 3 Assay Results up to 1.25% Ni 0.60% Cu,
17 October 2024).
Zones of mineralisation were generally defined by a combination of the various geochemical indicators and cutoff grades (Ni >0.15% and S >0.1%; Cu >20ppm, Pt+Pd >20ppb and S:Ni >0.5), with only minimal inclusion of
unmineralised material below mineable width.
A summary of the Phase 3 RC assay results received during October are listed below (Figure 2):
MTRC051
Cumulative 156m at 0.27% Ni, 133ppm Co, 212ppm Cu, 17ppb Pt+Pd with S:Ni 1.4*
MTRC052
192m at 0.28% Ni, 125ppm Co, 63ppm Cu, 11ppb Pt+Pd from 114m S:Ni 0.8*
MTRC053
205m at 0.28% Ni, 129ppm Co, 85ppm Cu, 16ppb Pt+Pd from 87m S:Ni 1.0*
MTRC054
200m at 0.28% Ni, 124ppm Co, 31ppm Cu, 10ppb Pt+Pd from 100m S:Ni 0.6*
MTRC055
216m at 0.30% Ni, 144ppm Co, 109ppm Cu, 20ppb Pt+Pd from 84m S:Ni 1.2*
MTRC056
201m at 0.31% Ni, 134ppm Co, 176ppm Cu, 15ppb Pt+Pd from 81m S:Ni 0.9
MTRC057
216m at 0.27% Ni, 139ppm Co, 159ppm Cu, 13ppb Pt+Pd from 84m S:Ni 1.1*
MTRC058
209m at 0.29% Ni, 132ppm Co, 50ppm Cu, 18ppb Pt+Pd from 91m S:Ni 0.8*
* Ending in mineralisation
Further intersections of shallow higher grade results were encountered in a number of the Phase 3 holes.
Relatively shallow high-grade results from the program within the central core area of the Mulga Tank Complex
include:
MTRC051
3m at 0.70% Ni, 400ppm Co, 0.38% Cu, 0.17g/t Pt+Pd from 147m
inc. 1m at 1.18% Ni, 650ppm Co, 0.67% Cu, 0.31g/t Pt+Pd from 148m
MTRC055
11m at 0.63% Ni, 211ppm Co, 535ppm Cu, 4ppb Pt+Pd from 175m
inc. 4m at 1.16% Ni, 345ppm Co, 0.13% Cu, 6ppb Pt+Pd from 182m
that inc. 2m at 1.97% Ni, 542ppm Co, 0.26% Cu, 12ppb Pt+Pd from 183m
which inc. 1m at 2.46% Ni, 641ppm Co, 0.43% Cu, 18ppb Pt+Pd from 183m
7m at 0.48% Ni, 226ppm Co, 248ppm Cu, 42ppb Pt+Pd from 234m
inc. 1m at 1.26% Ni, 489ppm Co, 431ppm Cu, 49ppb Pt+Pd from 239m
MTRC056
27m at 0.45% Ni, 172ppm Co, 263ppm Cu, 51ppb Pt+Pd from 81m
inc. 1m at 1.25% Ni, 398ppm Co, 0.15% Cu, 0.33g/t Pt+Pd from 96m
3m at 0.50% Ni, 237ppm Co, 0.40% Cu, 18ppb Pt+Pd from 273m
MTRC057
1m at 0.88% Ni, 449ppm Co, 0.60% Cu, 71ppb Pt+Pd from 221m
A total of 23 intersections >1% Ni have now been observed within the 58 RC holes to date. These intervals have
generally only been logged as matrix to semi-massive sulphide in RC chips, highlighting the high tenor of the
sulphide system.
ASX:WMG
www.westernmines.com.au
5
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
Figure 2: Phase 3 assay results for disseminated nickel sulphide mineralisation
Figure 3: Higher grade assay results within the core of the Mulga Tank Ultramafic Complex
ASX:WMG
www.westernmines.com.au
6
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
REGIONAL RC DRILLING
An additional five hole, 1,411m regional component of the Phase 3 RC program was designed to test the
interpreted komatiite channel system (based on aeromagnetic interpretation), extending from the main body of
the Mulga Tank Complex. These five RC holes were drilled to gain greater understanding of the geology of the
wider Minigwal Greenstone Belt that has seen limited effective drill testing beneath ~60m of sand cover.
Generally they targeted linear magnetic high features emanating from the main body of the Complex which were
interpreted to be part of an ultramafic komatiite channel system. The Panhandle feature and a chain of these
magnetic features extend approximately 15km in a north-northwest direction up the Minigwal Belt. Four of the
holes in tenement E39/2134 were drilled with the aid of one of WMG’s current EIS grants (ASX, WMG Wins Two
More EIS Awards to Drill Mulga Tank, 29 April 2024).
Geochemical assay results for holes MTRC062 (EIS6) and MTRC063 (EIS7) demonstrate hot, dynamic, high
MgO komatiite flows with Ni, S and chalcophile element results highlighting a fertile nickel sulphide environment
(ASX, Assays and Petrology Confirm Fertile Komatiite System, 3 December 2024).
These results are further supported by petrographic analysis. The Company’s Technical Director Dr Ben Grguric
completed mineralogical thin section work on samples from holes MTRC062 (EIS6) and MTRC063 (EIS7) to help
characterise the rock types and the sulphide species observed in the holes. Pentlandite (nickel iron sulphide)
was confirmed as the main sulphide species present with only minor pyrrhotite and pyrite (iron sulphides)
observed.
HoleID
Hole Depth
Ore Mineralogy
Max bleb size
Comments
MTRC062
183-185m
Pentlandite, minor violarite
1mm
Gangue mainly fresh olivine and serpentinite
MTRC062
195-197m
Pentlandite, minor violarite, secondary pyrite
0.5mm
Relatively abundant intercumulus blebs
MTRC062
287-289m
Pentlandite, some chips violarite altered
0.5mm
Relatively abundant intercumulus blebs
MTRC062
321-323m
Pentlandite, minor violarite
2mm
Some coarse blebs, incipient secondary violarite, talc gangue
MTRC063
203-205m
Pentlandite, minor violarite
0.6mm
MTRC063
329-331m
Pentlandite
0.5mm
Fresh pentlandite
Table 1: Polished section descriptions for holes MTR062 (EIS6) and MTRC063 (EIS7)
Hole MTRC062 (EIS6) Mineralogical Investigation
MTRC062 183m to 185m
MTRC062 195m to 197m
MTRC062 287m to 289m
Table 2: Polished section images for hole MTRC62 (EIS6)
(pn=pentlandite, ol = olivine, mt=magnetite)
ASX:WMG
www.westernmines.com.au
7
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
Hole MTRC063 (EIS7) Mineralogical Investigation
MTRC063 203m to 205m
MTRC063 329m to 331m
Table 3: Polished section images for hole MTRC63 (EIS7)
(pn=pentlandite, ol = olivine, mt=magnetite)
Interpreted komatiite
channel wireframe
3D Inversion
MVI 0.05 SI
Figure 4: 3D image of olivine cumulate package targeted by holes MTRC062 (EIS6) and MTRC63 (EIS7)
ASX:WMG
www.westernmines.com.au
8
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
Results from MTRC062 (EIS6) and MTRC063 (EIS7) are the standout of the program, returning 200-300m
intersections of very prospective high MgO olivine cumulate in a fence across a large magnetic feature at the
end of the Panhandle. Geochemical assay results and mineralogical work have confirmed nickel sulphide
mineralisation in a hot, dynamic komatiite flow environment. The results from these initial holes successfully
highlight the prospectivity of the komatiite channels to host high-grade Kambalda-style nickel sulphide
mineralisation and demonstrate the belt-scale potential of the Mulga Tank nickel sulphide mineral system.
This 1.3km long magnetic high body (Figure 4) and a number of look-a-like features along the trend (Figure 5)
warrant further follow-up work including ground geophysics such as ground electromagnetics, targeting any
discrete conductive targets within the komatiite channels. The Company will also likely look to extend MTRC063
(EIS7) with a diamond tail to target the basal contact within this area, providing a full section through the
assemblage and also enable a DownHole ElectroMagnetic (DHEM) survey of the target.
Figure 5: Komatiite channel targets along trend from EIS RC holes MTRC062 (EIS6) and MTRC063 (EIS7)
UPDATE ON METALLURGICAL TEST WORK
The upper portion of diamond hole MTD29 (EIS3) was drilled with larger diameter HQ core to provide material
for initial metallurgical test work of the shallow disseminated mineralisation. Six intervals of mineralisation,
totalling 62m downhole length and approximately 113kg weight, were selected from the top 150m to 300m
depth of the hole.
ASX:WMG
www.westernmines.com.au
9
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
Each of the 6 intervals of core were crushed and sampled on a length weighted basis to form a 50kg bulk
sample, representative of the hole. The remaining crushed material was kept as individual intervals and placed in
cold storage. To date a series of 9 different rougher floatation tests have been conducted on the bulk sample
material, each testing different factors including grind size (75um to 150um) and various reagents, with and
without desliming of fines. Nickel sulphides have been successfully recovered in all of the tests, with the test
work suggesting only around ~0.1% Ni is present as non-sulphide silicate nickel.
Having successfully completed this initial sighter test work the Company has now moved on to Phase 2 of the
metallurgical program. Incorporating the sighter results, further tests have been designed and planned to
approximate a processing flowsheet. This enhanced scope of work is one of the Company’s principal focuses
for the first quarter of 2025 and results will be announced to shareholders when available.
EXTINGUISHMENT OF ROYALTY E39/2132
Towards the end of the quarter WMG completed a binding Royalty Extinguishment Deed to buyback and
extinguish the 1% NSR royalty over tenement E39/2132 held by the original tenement vendor (an unrelated
party to the Company). This royalty formed part of the original tenement purchase consideration (ASX,
Prospectus, 16 July 2021).
Tenement E39/2132, covering ~80km2, is the key part of the Mulga Tank Project, containing the main body of
the Mulga Tank Ultramafic Complex. This tenement area has been the primary focus of the Company’s
exploration work, with 18 diamond holes and 59 RC holes drilled since IPO.
The consideration to extinguish the royalty is 800,000 fully paid ordinary shares in the Company (of which 50%
escrowed for 12 months), 800,000 options over ordinary shares (with an exercise price of $0.30 per share,
exercisable 4 years from the date of issue) and 400,000 performance rights (convertible into fully paid ordinary
shares if the Company’s share price 20 day VWAP exceeds $0.60 per share).
The Company believes this strategic transaction is significantly value accretive given the scale and potential of
the Mulga Tank Project. With the key tenement of the project now being royalty free it also opens up future
project funding opportunities through the re-sale of a royalty to specialised royalty investment groups.
DISCUSSION AND FUTURE PLANS
Another very productive quarter for the Company and the Mulga Tank Project, with the Phase 3 RC being our
most successful campaign to date. Drilling at the project highlights an extensive magmatic nickel sulphide
mineral system within the Mulga Tank Ultramafic Complex, with visible nickel sulphide encountered nearly
everywhere we drill. Significant Type 2 Mt Keith-style disseminated nickel sulphide mineralisation has been
demonstrated across the majority of the main body of the Complex, some ~4km.
The five regional holes (MTRC059 to MTRC063) were successful in validating the geological interpretation of the
wider Mulga Tank Complex. Results confirmed highly prospective high-MgO komatiite lithologies with fertile Ni,
S, and chalcophile elements, predominantly abundant pentlandite (nickel iron sulphide) mineralisation and only
minor pyrrhotite and pyrite (iron sulphides) observed. These results highlight the prospectivity of the komatiite
channels to host high-grade Kambalda-style nickel sulphide mineralisation and demonstrate the belt-scale
potential of the Mulga Tank nickel sulphide mineral system with a number of look-a-like targets along a ~15km
trend.
ASX:WMG
www.westernmines.com.au
10
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
The 19 Phase 3 RC holes within the main body of the Complex looked to both infill within the higher grade core
area of the Exploration Target modelling and also step outside the modelled mineralisation towards the south
and southeast; with the 19 holes split 7 for infill and 12 extending mineralisation. Remarkably all 19 holes
showed nickel sulphide mineralisation; a similar feat was achieved in the Phase 2 RC program with all 17 of
17 holes showing mineralisation (ASX, All Phase 2 RC Holes Show Broad Sulphide Mineralisation, 14 May 2024)
and in the Phase 1 RC program 19 of 22 holes intersected mineralisation - a running total of 55 out of 58 RC
holes being mineralised.
A number of the 12 holes drilled outside the Exploration Target shell returned some very robust assay results of
mineralisation, with the results received during the period showing broad intersections over ~200m intervals:
MTRC052
192m at 0.28% Ni, 125ppm Co, 63ppm Cu, 11ppb Pt+Pd from 114m S:Ni 0.8*
MTRC053
205m at 0.28% Ni, 129ppm Co, 85ppm Cu, 16ppb Pt+Pd from 87m S:Ni 1.0*
MTRC054
200m at 0.28% Ni, 124ppm Co, 31ppm Cu, 10ppb Pt+Pd from 100m S:Ni 0.6*
MTRC055
216m at 0.30% Ni, 144ppm Co, 109ppm Cu, 20ppb Pt+Pd from 84m S:Ni 1.2*
MTRC056
201m at 0.31% Ni, 134ppm Co, 176ppm Cu, 15ppb Pt+Pd from 81m S:Ni 0.9
MTRC057
216m at 0.27% Ni, 139ppm Co, 159ppm Cu, 13ppb Pt+Pd from 84m S:Ni 1.1*
MTRC058
209m at 0.29% Ni, 132ppm Co, 50ppm Cu, 18ppb Pt+Pd from 91m S:Ni 0.8*
* Ending in mineralisation
All RC drilling results are generally within the top 300 vertical metres from surface. This zone of shallow Mt Keithstyle mineralisation could be amenable to large scale open pit mining, which the Company reported as an
Exploration Target in early February 2024. A central core area of this mineralisation has been drilled to
approximately 200m x 200m spacing across the various phases of drilling.
The Company has commenced geological domaining and block modelling of this central zone and is focused
on working towards and initial inferred resource for this area. Accompanying this resource modelling work, the
Company has commenced a second phase of metallurgical test work, these activities form a primary focus of
the current quarter.
A total of 23 higher grade intersections greater than 1% Ni have now been encountered in the RC drilling
over an approximately 2.5km2 area in the core of the main body of the Complex. Given the still relatively wide
drill spacing (generally 200m x 200m at best), these results highlight the prospectivity and potential to find pods
or zones of higher grade material within the extensive lower grade disseminated system.
These higher grade results are distributed across the central area of the Complex, some of which can start to be
correlated between drill holes over several hundreds of metres and possibly cluster in nine areas. The Company
will look to target these areas with follow-up work and is in the process of planning future drilling campaigns in
order to expand and better understand these high-grade zones. A modest improvement in the width of these
high grade intersections could really change the value proposition of the project and highlight zones that could
be amenable to starter pit operations in a future mine plan or model.
Further high-grade areas are also likely to be found as additional parts of the Complex are tested. The
Company’s ongoing exploration targeting work is in the process of prioritising drilling plans and targets for a
fourth phase of RC drilling.
ASX:WMG
www.westernmines.com.au
11
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
JASPER HILL
The Jasper Hill Project comprises exploration licences E39/2073, E39/2079 and prospecting licence P39/6267.
The project is located approximately 80km southeast of Laverton and covers part of the poorly exposed Merolia
Greenstone Belt, a NNW trending belt, up to 20km wide, that can be traced over 110km in a SSE direction from
the Burtville Mining Centre. The project area is lightly explored, but is contiguous to the historical producing
mines of Lord Byron (160,000oz at 1.0g/t Au) and Fish (87,000oz at 4.1g/t Au) owned by Brightstar Resources
(ASX:BTR).
Jasper Hill is the Company’s primary gold project containing a mineralised gold trend over 3km strike. The
Company has previously completed field reconnaissance work involving geological mapping, high-resolution
ground magnetic survey and locating historical drill collars and registered aboriginal heritage sites.
Following the grant of P39/6267, the Company recently completed various fieldwork campaigns involving
ground magnetics (extending current coverage), ground gravity and soil and rock chip sampling. Results from
the reconnaissance soil sampling were received during the period. A gold-in-soil anomaly on the western edge
of tenement E39/2073 appears coincident with historical WMC results from 1984.
Further soil sampling, geological mapping and ground geophysics is planned at the project during the current
quarter.
Figure 6: WMG ground magnetic survey and significant historical drill intersections (E39/2073 and P39/6267)
ASX:WMG
www.westernmines.com.au
12
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
Figure 7: WMG ground gravity survey points
Figure 8: WMG soil sampling
ASX:WMG
www.westernmines.com.au
13
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
YOUANMI
The Youanmi Project comprises exploration licence E57/1119. The project is located 70km southwest of
Sandstone and lies on the eastern side of the Youanmi Greenstone Belt, along the major Youanmi Shear.
The tenement is located 7km from the historic Youanmi Gold Mining Centre, which has produced over
600,000oz of gold since its discovery in the late 1800’s, currently owned by Rox Resources (ASX:RXL) and
Venus Metals (ASX:VMC). The area has seen a resurgence in exploration activity with the recent discovery of the
high-grade Penny North (ASX:RMS) and Grace (ASX:RXL) deposits along the Youanmi Shear.
The Company has undertaken completed various fieldwork campaigns involving field reconnaissance, ground
magnetics and ground gravity targeting the historical Deep Well, and interesting structural displacement along
the major Youanmi Shear. Further fieldwork is planned at the project for the first half of 2025.
Figure 9: Historical Deep Well RAB drilling and WMG ground gravity survey points
ASX:WMG
www.westernmines.com.au
14
ASX RELEASE | QUARTERLY ACTIVITIES REPORT DECEMBER 2024
MELITA
The Melita Project comprises exploration licence E40/379, covering an area of approximately 105km2. The
project is located 20km south-southeast of Leonora and to the north of the Kookynie, Niagara and Orient WellButterfly gold mining centres, in the heart of the WA Goldfields. The Kookynie area has seen recent upswing in
exploration, with WMG’s Melita Project surrounded by the likes of Genesis Minerals (ASX:GMD), Saturn Metals
(ASX:STN), Azure Minerals and KIN Mining (ASX:KIN).
The Company notes the increase in M&A activity around the Leonora-Kookynie area and undertook a review of
the project, including soil geochemical and ground magnetic data collected during a series of WMG field
campaigns (ASX, Major Field Program Commences at Melita, 11 August 2021; Completion of Initial Field
Program at Melita,