COMPLETION OF PHASE 2 RC DRILLING COMMENCEMENT OF EIS3
HIGHLIGHTS
• Completion of 17 hole Phase 2 RC drilling program at the Mulga Tank Ni-Co-Cu-PGE Project
• Total of 5,534m drilled with average hole depth of 326m
• Second phase of RC drilling designed to infill around a higher grade core area identified in the
Company’s JORC Exploration Target modelling
• Systematically testing around Phase 1 holes MTRC015 to MTRC018 in the centre of the Complex
• All samples have been delivered to the lab with reporting of geochemical assay results
anticipated over the next month
• Deep diamond hole MTD029 (EIS3) has commenced, currently around ~300m depth, testing
compelling MobileMT anomaly cofunded by WMG’s EIS grant
Western Mines Group Ltd (WMG or Company) (ASX:WMG) is pleased to update shareholders on the
completion of our Phase 2 reverse circulation (RC) drilling program at the Mulga Tank Ni-Co-Cu-PGE Project, on
the Minigwal Greenstone Belt, in Western Australia’s Eastern Goldfields.
After a 3 week delay due to rain and flooding in the Eastern Goldfields, the 17 hole program is now complete
with a total of 5,534 metres drilled and an average hole depth of 326m. The drilling was designed to follow-up
and infill within the higher grade core area identified by the Company’s JORC Exploration Target modelling (ASX,
Mulga Tank JORC Exploration Target, 5 February 2024).
The RC holes were focused around Phase 1 holes MTRC015 to MTRC018 in the centre of the main body of the
Complex, in particular around MTRC016 that returned 200m at 0.31% Ni (including 35m at 0.45% Ni) from
103m. A total of 4,470 1m samples have been delivered to the ALS laboratory in Perth for geochemical assay.
Assay results received so far have already confirmed further mineralised intersections >200m in holes MTRC024
to MTRC026, stepping out from MTRC016 (ASX, Further RC Results with 200m Zones of Mineralisation, 27
March 2024). The release of the remaining results is expected over the next month.
Following the RC program the rig has been converted to diamond drilling and has moved on to commence
deep diamond hole MTD029 (EIS3) (ASX, 2024 Exploration Programs Commence at Mulga Tank, 29 January
2024); currently around ~300m depth. This hole will look to test for a sulphide enriched keel in the deepest part
of the Complex, with a compelling coincident MobileMT anomaly around -700m RL, near the basal contact. The
hole is co-funded with a grant from the WA State Government’s Exploration Incentive Scheme (EIS) (ASX, WMG
Wins $220,000 EIS Award to Drill Mulga Tank, 19 October 2023).
Western Mines Group Ltd
Level 3, 33 Ord Street
West Perth WA 6005
ASX:WMG
Telephone: +61 475 116 798
Email: contact@westernmines.com.au
www.westernmines.com.au
Shares on Issue: 75.08m
Share Price: $0.155
Market Cap: $11.64m
Cash: $2.10m (31/12/23)
1
ASX RELEASE | COMPLETION OF PHASE 2 RC DRILLING COMMENCEMENT OF EIS3
Commenting on the Mulga Tank Project, WMG Managing Director Caedmon Marriott said:
“The team have done a great job in completing another 5,500m RC program focused on the centre
of the Mulga Tank Complex. This infill program aims to de-risk, improve confidence and aid
resource evaluation of the higher grade core area of the JORC Exploration Target. Samples have all
been delivered to the lab and reporting of remaining assay results is expected over the next month.
The guys were keen to get straight back out to site as soon as they could after the recent flooding
in the region and are excited to get started on the next deep diamond hole. This is another
cofunded EIS hole looking to test a compelling MobileMT anomaly and possible sulphide enriched
keel of this huge nickel sulphide system. The top section of the hole is being drilled as HQ to
provide additional material for initial metallurgical testwork of the shallow disseminated
mineralisation defined by the RC drilling.”
MULGA TANK DRILLING PROGRAMS
Exploration results from the Company’s various drilling programs at the Mulga Tank Project over the last 12
months have demonstrated significant nickel sulphide mineralisation and an extensive nickel sulphide mineral
system within the Mulga Tank Ultramafic Complex (ASX, MTD023 Assays Confirm Discovery of Significant Nickel
Sulphide System, 5 April 2023; MTD026 Assays - 840m of Nickel Sulphide Mineralisation, 30 August 2023;
MTD027 Expands Mineralisation 4km Across Mulga Tank, 28 August 2023).
Results from an initial 22 hole RC program confirmed extensive shallow disseminated nickel sulphide
mineralisation within the main body of the Complex, culminating in the estimation of a JORC Exploration Target
for this mineralised zone (ASX, First RC Assays Show Broad Zones of Mineralisation, 14 November 2023;
MTRC009 Assays Confirm 367m of Nickel Mineralisation, 30 November 2023; MTRC015 Assays Reveal
Multiple Intersections Over 1% Ni, 4 December 2023; MTRC018 Assays Confirm Massive Sulphide 1.8% Ni,
4.9% Cu, 6 December 2023; First RC Without Mineralisation Found at Mulga Tank, 21 December 2023; More
Intersections over 1% Ni at Mulga Tank, 11 January 2024; Mulga Tank JORC Exploration Target, 5 February
2024).
The Company has commenced a series of drilling programs for the first half of 2024 involving both further RC
and diamond drilling. The Phase 2 RC drilling is focused on infilling the higher grade core of the Exploration
Target and extending the shallow mineralisation to the south of the Phase 1 area (ASX, 2024 Exploration
Programs Commence at Mulga Tank, 29 January 2024).
RC DRILLING PROGRAM
The initial 17 holes of the Phase 2 RC program predominantly focus on infilling the higher grade core area
identified by the Company’s JORC Exploration Target modelling (ASX, 2024 Exploration Programs Commence
at Mulga Tank, 29 January 2024) (Figure 1).
The drill hole spacing in this central area has been reduced to approximately 200m x 200m, from the initial
500m x 300m spacing of the Phase 1 program, covering an area of around 800m x 900m. Each hole was
designed to a target depth of 300-350m, which was achieved in all holes, for a total of 5,534m - of which the
top ~60m of each hole, or 1,064m in total, was mud-rotary drilling through the sand cover.
ASX:WMG
www.westernmines.com.au
2
ASX RELEASE | COMPLETION OF PHASE 2 RC DRILLING COMMENCEMENT OF EIS3
Visible sulphide mineralisation was observed in the Phase 2 RC holes (ASX, Semi-Massive Sulphide in Mulga
Tank Phase 2 RC Holes, 29 February 2024). All holes were sampled at 1m intervals from the start of RC drilling
(i.e. base of mud rotary) with a total of 4,470 samples delivered to the ALS laboratory in Perth for geochemical
assay. Results from the first seven holes MTRC023 to MTRC029 have already been reported (ASX, MTRC024
Assays - Matrix-Massive Sulphide over 4.5% Ni; Further RC Results with 200m Zones of Mineralisation, 27
March 2024) whilst results from the remaining 10 holes are anticipated over the next month.
Figure 1: Mulga Tank Phase 2 RC drilling program (MTRC023 to MTRC039)
ASX:WMG
www.westernmines.com.au
3
ASX RELEASE | COMPLETION OF PHASE 2 RC DRILLING COMMENCEMENT OF EIS3
HoleID
Easting (MGA51)
Northing (MGA51)
Total Depth (m)
Azimuth
Dip
MTRC023
520698
6688802
314
270
-70
MTRC024
520696
6689005
360
270
-70
MTRC025
520700
6689192
348
270
-70
MTRC026
521095
6689205
336
270
-70
MTRC027
521095
6688998
348
270
-70
MTRC028
521097
6688801
348
270
-70
MTRC029
520694
6689400
300
270
-70
MTRC030
520901
6689404
312
270
-70
MTRC031
521097
6689403
300
270
-70
MTRC032
520894
6688598
306
270
-70
MTRC033
521299
6689399
312
270
-70
MTRC034
521500
6688993
330
270
-70
MTRC035
521505
6689096
348
270
-70
MTRC036
521297
6689101
318
270
-70
MTRC037
521300
6688805
324
270
-70
MTRC038
520703
6688605
318
270
-70
MTRC039
521100
6688605
312
270
-70
Table 1: Collar details and hole depths for RC drilling program at Mulga Tank
DIAMOND HOLE EIS3
Following the RC program the rig has been converted to diamond drilling and has moved on to commence
deep diamond hole MTD029 (EIS3) (ASX, 2024 Exploration Programs Commence at Mulga Tank, 29 January
2024). The hole is currently already around ~300m depth.
MTD029 (EIS3) will look to test for a sulphide enriched keel in the deepest part of the Complex (based on
modelling of the Company’s previous deep diamond drilling) and also tests a compelling coincident MobileMT
anomaly around -700m RL, near the basal contact. The upper portion of the hole is being drilled with wider
diameter HQ diamond core to provide additional sample material for initial metallurgical testwork of the shallow
disseminated mineralisation defined by the RC drilling.
The hole is co-funded with a grant from Round 28 of the WA State Government’s Exploration Incentive Scheme
(ASX, WMG Wins $220,000 EIS Award to Drill Mulga Tank, 19 October 2023).
ASX:WMG
www.westernmines.com.au
4
ASX RELEASE | COMPLETION OF PHASE 2 RC DRILLING COMMENCEMENT OF EIS3
E
Dunite shell
400mRL
W
-1000mRL
96m at 0.40% Ni from 1208m
Inc. 38m at 0.56% Ni from 1262m
Inc. 8m at 1.11% Ni from 1270m
Figure 2: Stacked depth slices of MobileMT conductivity showing the planned drill trace of EIS3 and
outline dunite shell of the Mulga Tank Complex
The Company looks forward to regularly updating shareholders on the assay results from the RC drilling
program as they become available along with the progress of diamond hole MTD029 (EIS3).
For further information please contact:
Dr Caedmon Marriott
Managing Director
Tel: +61 475 116 798
Email: contact@westernmines.com.au
This announcement has been authorised for release to the ASX by Dr Caedmon Marriott, Managing Director
ASX:WMG
www.westernmines.com.au
5
ASX RELEASE | COMPLETION OF PHASE 2 RC DRILLING COMMENCEMENT OF EIS3
ABOUT WMG
Western Mines Group Ltd
Western Mines Group Ltd (ASX:WMG) is a mineral exploration company driven by the goal
ACN 640 738 834
Level 3, 33 Ord Street
West Perth
WA 6005
to create significant investment returns for our shareholders through exploration and
discovery of high-value gold and nickel sulphide deposits across a portfolio of highlyprospective projects located on major mineral belts of Western Australia.
Our flagship project and current primary focus is the Mulga Tank Ni-Co-Cu-PGE Project, a
Board
Rex Turkington
Non-Executive Chairman
Dr Caedmon Marriott
Managing Director
major ultramafic complex found on the under-explored Minigwal Greenstone Belt. WMG’s
exploration work has discovered significant nickel sulphide mineral system and is
considered highly prospective for globally significant Ni-Co-Cu-PGE deposits.
The Company’s primary gold project is Jasper Hill, where WMG has strategically
Francesco Cannavo
Non-Executive Director
consolidated a 3km mineralised gold trend with walk-up drill targets. WMG has a diversified
Dr Benjamin Grguric
Technical Director
Leonora in the heart of the WA Goldfields; Youanmi (Au), Pavarotti (Ni-Cu-PGE), Rock of
Capital Structure
Shares: 75.08m
Options: 20.52m
Share Price: $0.155
Market Cap: $11.64m
Cash (31/12/23): $2.10m
Follow us
portfolio of other projects including Melita (Au, Cu-Pb-Zn), midway between Kookynie and
Ages (Au), Broken Hill Bore (Au) and Pinyalling (Au, Cu, Li).
COMPETENT PERSONS STATEMENT
The information in this announcement that relates to Exploration Results and other technical
information complies with the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and has been
compiled and assessed under the supervision of Dr Caedmon Marriott, Managing Director
of Western Mines Group Ltd. Caedmon is a Member of the Australian Institute of
@westernmines
Geoscientists, a Member of the Society of Economic Geologists and a Member of the
westernmines
Australasian Institute of Mining and Metallurgy. He has sufficient experience that is relevant
Western Mines Group
to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
JORC Code. Caedmon consents to the inclusion in this announcement of the matters
based on his information in the form and context in which it appears.
DISCLAIMER
Some of the statements appearing in this announcement may be in the nature of forward looking statements. You should be
aware that such statements are only predictions and are subject to inherent risks and uncertainties. Those risks and
uncertainties include factors and risks specific to the industries in which WMG operates and proposes to operate as well as
general economic conditions, prevailing exchange rates and interest rates and conditions in the financial markets, among
other things. Actual events or results may differ materially from the events or results expressed or implied in any forward
looking statement. No forward looking statement is a guarantee or representation as to future performance or any other
future matters, which will be influenced by a number of factors and subject to various uncertainties and contingencies, many
of which will be outside WMG’s control.
WMG does not undertake any obligation to update publicly or release any revisions to these forward looking statements to
reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events. No representation or
warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions
or conclusions contained in this announcement. To the maximum extent permitted by law, none of WMG, its Directors,
employees, advisors or agents, nor any other person, accepts any liability for any loss arising from the use of the information
contained in this announcement. You are cautioned not to place undue reliance on any forward looking statement. The
forward looking statements in this announcement reflect views held only as at the date of this announcement.
ASX:WMG
www.westernmines.com.au
6
Share your feedback
Discover