Western Mines Group Ltd (WMG or Company) (ASX:WMG) is very pleased to inform shareholders of an
updated Mineral Resource Estimate for the shallow disseminated nickel sulphide mineralisation at the Mulga
Tank Ni-Cu-Co-PGE Project, on the Minigwal Greenstone Belt, in Western Australia’s Eastern Goldfields.
The 32 holes from recent Phase 4 and Phase 5 drilling have been incorporated into the Company’s previous
resource modelling (ASX, Mulga Tank Mineral Resource over 5Mt Contained Nickel, 10 April 2025) to produce
an updated Mineral Resource Estimate. The Company’s internal modelling work has been reviewed by
independent consultants ERM. The Mineral Resource Estimate using a 0.20% Ni cut-off grade is:
Total Resource 2,647 Mt grading 0.27% Ni, 131ppm Co, 77ppm Cu, 19ppb Pt+Pd S:Ni 1.0
Of which:
Indicated 1,121 Mt grading 0.28% Ni, 133ppm Co, 90ppm Cu, 19ppb Pt+Pd S:Ni 1.0
Inferred 1,526 Mt grading 0.27% Ni, 130ppm Co, 68ppm Cu, 19ppb Pt+Pd S:Ni 0.9
With contained metal within the Total Resource of:
7.2Mt Ni, 347kt Co, 205kt Cu and 1.6Moz Pt + Pd
ASX:WMG www.westernmines.com.au 1
Western Mines Group Ltd
Unit 10, 448 Roberts Road
Subiaco WA 6008
HIGHLIGHTS
• Completion of an updated Mineral Resource Estimate for the shallow disseminated nickel
sulphide mineralisation at the Mulga Tank Ni-Co-Cu-PGE Project (in accordance with JORC 2012)
• Inclusion of 32 Phase 4 and 5 drill holes resulting in +35% increase in Total Tonnes, +98%
increase in Indicated Tonnes and +18% increase in Total Tonnes above 0.32% Ni cut-off
• Globally significant, large-scale, open-pit able nickel sulphide deposit defined at 0.20% Ni cut-off:
Indicated 1,121Mt at 0.28% Ni, 133ppm Co, 90ppm Cu, 19ppb Pt+Pd with S:Ni 1.0
Inferred 1,526Mt at 0.27% Ni, 130ppm Co, 68ppm Cu, 19ppb Pt+Pd with S:Ni 0.9
Total Resource 2,647Mt at 0.27% Ni, 131ppm Co, 77ppm Cu, 19ppb Pt+Pd with S:Ni 1.0
• Total Resource contained metal of 7.2Mt Ni, 347kt Co, 205kt Cu, 1.6Moz Pt+Pd
• Mineral Resource constrained to depth and area of the Company’s current drilling results - with
mineralisation open in many directions
• Company’s modelling and Mineral Resource Estimate reviewed by independent consultants ERM
Australia Consultants Pty Ltd (ERM)
• Updated resource forms part of first Scoping Study being completed for the project
MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
ASX RELEASE
26 OCTOBER 2026
Telephone: +61 475 116 798
Email: contact@westernmines.com.au
Shares on Issue: 130.37m
Share Price: $0.115
Market Cap: $15.00m
Cash: $1.58m (30/06/26)
The updated Mineral Resource Estimate represents a significant increase from the initial April 2025 estimate and
shows:
• +35% increase in Total Resource Tonnes and Total Contained Nickel Metal
• +98% increase in Indicated Resource Tonnes and Indicated Contained Nickel Metal
• +18% increase in Total Resource Tonnes above 0.32% Ni cut-off
Commenting on the Mulga Tank Mineral Resource, WMG Managing Director Dr Caedmon Marriott said:
“Over the last 18 months we’ve completed further Phase 4 and Phase 5 drilling with an additional
32 RC and shallow diamond holes. Results from these programs have been included into our
resource modelling and today’s updated resource estimate. Last years initial MRE for Mulga Tank
was a significant milestone for both the project and the Company and with today’s announcement
it gets bigger and better - what we believe is firmly the largest nickel sulphide deposit in Australia
and top 10 in the world.
The Mineral Resource Estimate focuses on just the shallow disseminated mineralisation,
constrained by our current drilling, in what could be a large open pit scenario. One of the aims of
the Phase 4 and 5 programs was to increase drilling density and upgrade the Indicated resource
tonnes, which was successful with a 98% increase. A further aim was to try and target higher
grade tonnes, which again appears successful with an 80% increase in Indicated resource tonnes
and an 18% increase in Total resource tonnes above a 0.32% Ni cut-off. The results from this
upgraded resource will feed into a mine plan and initial Scoping Study the Company is currently
working on for the project”
MULGA TANK MINERAL RESOURCE ESTIMATE
Exploration results from the Company’s various drilling programs at the Mulga Tank Project have demonstrated
significant nickel sulphide mineralisation and an extensive nickel sulphide mineral system within the Mulga Tank
Ultramafic Complex.
WMG has undertaken a combination of both diamond and reverse circulation (RC) drilling. With this two
pronged approach, RC is used to infill and prove up the extent of shallow disseminated nickel sulphide
mineralisation, defined by the Company’s Mineral Resource Estimate (ASX, Mulga Tank Mineral Resource Over
5Mt Contained Nickel, 10 April 2025), whilst the diamond drilling program continues to test deeper targets for
basal massive sulphide.
Since the initial Mineral Resource Estimate, the Company has completed two further phases of predominantly
RC drilling totalling 32 holes for 9,634m. Results from all the drilling to date have recently been incorporated into
a block model that identifies a significant mineralised zone in the main body of the Mulga Tank Complex. This
mineralised zone has been reported as a Mineral Resource Estimate, in accordance with the JORC 2012.
The Mulga Tank October 2026 Mineral Resource (Tables 1 and 2) at a 0.20% Ni cut-off grade is estimated to be:
Indicated 1,121 Mt grading 0.28% Ni, 133ppm Co, 90ppm Cu, 19ppb Pt+Pd S:Ni 1.0
Inferred 1,526 Mt grading 0.27% Ni, 130ppm Co, 68ppm Cu, 19ppb Pt+Pd S:Ni 1.0
Total Resource 2,647 Mt grading 0.27% Ni, 131ppm Co, 77ppm Cu, 19ppb Pt+Pd S:Ni 1.0
ASX:WMG www.westernmines.com.au 2
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
Representing contained metal values of:
Indicated Contained 3.1Mt Ni, 149kt Co, 101kt Cu and 690Koz Pt +Pd
Inferred Contained 4.1Mt Ni, 198kt Co, 104kt Cu and 939Koz Pt +Pd
Total Contained 7.2Mt Ni, 347kt Co, 205kt Cu and 1.6Moz Pt + Pd
ASX:WMG www.westernmines.com.au 3
Ni Cut Off (%) Category Tonnes (Mt) Ni (%) Co (ppm) Cu (ppm) Pt+Pd (ppb) S (%) S:Ni
0.16
Indicated 1,134 0.27 133 91 19 0.29 1.1
Inferred 1,551 0.27 129 68 19 0.26 1.0
Total 2,685 0.27 131 78 19 0.27 1.0
0.20
Indicated 1,121 0.28 133 90 19 0.29 1.0
Inferred 1,526 0.27 130 68 19 0.26 1.0
Total 2,647 0.27 131 77 19 0.27 1.0
0.24
Indicated 989 0.28 134 91 19 0.29 1.0
Inferred 1,300 0.28 130 69 19 0.25 0.9
Total 2,289 0.28 132 78 19 0.27 1.0
0.28
Indicated 481 0.30 139 108 21 0.29 1.0
Inferred 516 0.30 134 76 21 0.26 0.9
Total 997 0.30 136 92 21 0.28 0.9
0.32
Indicated 78 0.34 153 194 28 0.41 1.2
Inferred 43 0.33 146 106 29 0.35 1.1
Total 121 0.34 151 163 28 0.39 1.1
Ni Cut Off (%) Category Contained Ni (Mt) Contained Co (kt) Contained Cu (kt) Contained Pt+Pd (koz)
0.16
Indicated 3.1 151 103 698
Indicated 4.1 201 106 952
Total 7.3 351 208 1,650
0.20
Indicated 3.1 149 101 690
Inferred 4.1 198 104 939
Total 7.2 347 205 1,629
0.24
Indicated 2.8 132 90 607
Inferred 3.6 169 89 804
Total 6.4 302 179 1,412
0.28
Indicated 1.5 67 52 321
Inferred 1.5 69 39 347
Total 3.0 136 91 667
0.32
Indicated 0.3 12 15 70
Inferred 0.1 6 5 40
Total 0.4 18 20 110
Table 1: Mineral Resource Estimate at 0.20% Ni cut-off with Grade-Tonnes details
Numbers may not add up due to rounding
Table 2: Mineral Resource Estimate at 0.20% cut-off with Contained Metal details
Numbers may not add up due to rounding
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
WMG believes the Mulga Tank October 2026 Mineral Resource further extends Mulga Tank as the largest nickel
sulphide deposit in Australia and is very likely in the top 10 nickel sulphide resources in the world. Figure 1 below
shows the largest nickel sulphide deposits in Australia in terms of total resources of contained nickel metal
(Appendix 2 for details):
BLOCK MODELLING DETAILS
The Company focused its modelling work on an approximate 3.7km x 2.0km area in the centre of the main body
of the Mulga Tank Complex. The relevant WMG drill holes from the project database used in the modelling are
shown in Figure 2 below (Appendix 1).
ASX:WMG www.westernmines.com.au 4
Figure 2: Plan view of area of investigation and drill holes used in block modelling
Contained
Nickel
(Kt)
0
2,000
4,000
6,000
8,000
1: Largest nickel sulphide resources in Australia by total contained nickel metal (min. 100Kt Ni)
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
The block model was divided into three geological domains, the sand cover (average 65m), a narrow oxidised
domain (sub-divided into an upper completely oxidised and lower partially oxidised zones) and the main host
dunite unit containing disseminated sulphide mineralisation (Figure 7). The Mineral Resource Estimate is reported
for the dunite domain only and nickel within the oxidised/transitional domain is specifically excluded from the
reported results.
The block model (Figure 3) used a parent block size of 50m x 50m x 10m (being approximately half the
minimum drill spacing). Drill hole assay compositing was done at 2m with a top-cut of approximately the 99th
percentile nickel assay value of 9,000ppm Ni applied to the raw sample data. Ordinary Kriging (OK) estimation
was performed using multiple passes at 250m, 400m and 800m search radius incorporating a minimum three
drill holes. The first pass distance was determined from variography results for nickel (250m) and sulphur
(300m).
Two zones with closer drill hole spacing within the parent block model were identified and wireframed to define
the resource classification boundaries. The first zone, with drill holes nominally spaced at 200m x 200m (and
approximately corresponding to a first pass of 280m with minimum three drill holes), was defined as the extents
of the total resource and classified as Inferred (Figure 4). Within this total resource, a second zone with drill holes
nominally spaced at 100m x 100m (approximately corresponding to a first pass of 140m with minimum three
drill holes) was classified as Indicated. Blocks within the mineralisation domain, but outside of the Indicated and
Inferred classification boundaries, were categorised as Unclassified (Figure 5).
ASX:WMG www.westernmines.com.au 5
Figure 3: Mulga Tank Parent Block Model for the dunite domain
Outline of main Mulga Tank dunite body, viewed from south looking north, coloured by Ni%
>0.43% Ni
<0.12% Ni
0.27% Ni
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
ASX:WMG www.westernmines.com.au 6
Figure 4: Mulga Tank Total Mineral Resource Block Model for the dunite domain
Outline of main Mulga Tank dunite body, viewed from south looking north, coloured by Ni%
Figure 5: Mulga Tank Mineral Resource categories for the dunite domain
Outline of main Mulga Tank dunite body, viewed from south looking north
>0.43% Ni
<0.12% Ni
0.27% Ni
Indicated
Inferred
Unclassified
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
SUMMARY OF RELEVANT EXPLORATION DATA
Since listing in July 2021 WMG has undertaken a series of exploration programs at the Mulga Tank Project
which have included:
30 diamond and diamond tail drill holes totalling 17,879.7m
94 reverse circulation (RC) drill holes totalling 28,939.5m
29,898 drill hole assay samples
35,549 diamond core pXRF measurements
Mineralisation and host rock characterisation including optical petrography, SEM-EDS microanalysis and whole
rock quantitative XRD analysis
Various geophysical surveys including: DownHole ElectroMagnetics (DHEM), Moving Loop ElectroMagnetics
(MLEM), ground gravity and airborne MobileMT (MagnetoTellurics)
In addition, historical exploration at the Mulga Tank project has included 12 diamond drill holes totalling
4,399.4m. These drill holes have been included in the project database when considering the geological
interpretation of the Complex and dimensions of the dunite intrusion. However, they have been generally
excluded from the geochemical modelling of mineralisation as the various historical assay suites often lacked
elements WMG considers critical to the interpretation, such as sulphur (S), and/or the historical drill holes which
fell outside the area investigated by the modelling.
INDEPENDENT REVIEW OF MINERAL RESOURCE ESTIMATE
ERM has reviewed the data inputs and methodology used to generate the Mulga Tank Mineral Resource
Estimate, including validation of the resource figures pertaining to this announcement. ERM is of the opinion that
the input data is sound, and the interpretation and methodology used to generate the Mineral Resource
Estimate is reasonable and acceptable by current industry standards, for the type and style of mineralisation.
ERM are satisfied the data, interpretation and methodology support the reporting of a Mineral Resource
Estimate in accordance with the JORC Code (2012).
ASX:WMG www.westernmines.com.au 7
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
TECHNICAL OVERVIEW
The Company provides the following summary of material information relating to the Mineral Resource Estimate
in accordance with ASX Listing Rule 5.8.1. Further details are provided in the accompanying JORC Tables.
GEOLOGY AND GEOLOGICAL INTERPRETATION
The Mulga Tank Project is located on the Minigwal Greenstone Belt, which lies in the southern Duketon Domain
of the Burtville Terrane of the Yilgarn Craton, Western Australia (Figure 6). The Minigwal Greenstone belt is
interpreted from aeromagnetics and historical drilling to consist of two belts of northwesterly trending
assemblages of ultramafic, mafic volcanic and sedimentary rocks fault bounded by granite to the east and west.
The eastern belt comprises faulted granite and gneiss with thrust-repeated interlayered units of greenstone, BIF
and ultramafic to mafic volcanic rocks. The western belt comprises structurally controlled, steeply dipping
ultramafic and mafic rocks adjacent to granites. Sub-parallel structures and dolerite dykes that trend east-west
cut both belts.
Within the project area the Archaean bedrock is masked by sand cover of up to 70m. The tenements cover the
Mulga Tank Ultramafic Complex, interpreted from a major regional magnetic high and historical drilling. An
approximately oval magnetic high feature within tenement E39/2132 has been shown by drilling to be a lopolith
shaped dunite intrusion. The high MgO dunite consists of coarse-grained olivine, displaying predominantly
adcumulate to extreme adcumulate texture, with varying degrees of serpentinisation, interstitial magnetite, minor
chlorite and sulphides. In places complete serpentinisation of the dunite has taken place with former olivine
cumulate textures pseudomorphically replaced by lizardite. Elsewhere serpentinisation has destroyed primary
textural features. Curvilinear magnetic features emanating from the dunite are interpreted to represent komatiite
channel flows. This interpretation of komatiite channels has been confirmed by the first recent regional RC
drilling. The surrounding footwall of the dunite and komatiite channels consists of basalt and interbedded chert
and sulphidic black shales.
ASX:WMG www.westernmines.com.au 8
Figure 6: Location of Mulga Tank Project
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
Diamond drilling of the dunite intrusion has demonstrated the extensive presence of intercumulus sulphide blebs
(predominantly pentlandite), localised at the interstices between former olivine crystals. This texture is often
considered evidence of cotectic olivine-sulphide precipitation and characteristic of Type 2 nickel sulphide
systems, exemplified by the Mount Keith deposit. Drilling has also encountered intersections of thin (<20cm)
high-tenor massive sulphide veins and immiscible sulphide globules. The presence of this type of mineralisation
in addition to intercumulus sulphide is considered evidence that Mulga Tank represents a so-called Hybrid
system, in which both cotectic precipitation and gravity settling of sulphides has occurred. This markedly
increases the prospectivity of the system, allowing for possible significant basal accumulations of massive and
matrix sulphide.
DRILLING TECHNIQUES
A combination of both diamond core and reverse circulation (RC) drilling has been undertaken by WMG at the
Mulga Tank Project. Diamond core drilling was predominantly NQ2 diameter, with a minor amount of larger HQ
core. Due to the sometimes free flowing sand cover mud rotary drilling was used to drill through the sand until
competent rock, with the diamond or RC then commencing below the sand.
A total of 30 diamond and diamond tail drill holes totalling 17,879.7m and 94 RC drill holes totalling 28,939.5m
have been drilled across the project area since April 2022, of which, 21 diamond and diamond tail drill holes
totalling 14,039.7.3m and 89 RC drill holes totalling 27,528.5m were drilled within the main body of the Mulga
Tank Complex and used in the Mineral Resource Estimate.
SAMPLING AND SUB-SAMPLING TECHNIQUES
Diamond core was cut in half and quarters and sampled on either geological intervals or 1m or 2m lengths for
geochemical analysis - the majority of sampling being 2m quarter core samples. Individual 1m RC samples were
collected directly from the rig sampling system.
SAMPLING ANALYSIS AND METHODS
Samples were crushed and pulverised to >85% passing 75um to produce a sub-sample for analysis by four
acid digest and multi-element ICP-AES (ME-ICP61), precious metals fire assay (Au, Pd, Pt) (PGM-ICP23) and
loss on ignition at 1,000°C (ME-GRA05). Bulk density measurements on diamond drill core samples were
performed by the water displacement method by the laboratory (OA-GRA09) and the Company.
RESOURCE ESTIMATION METHODOLOGY
The Mulga Tank October 2026 Mineral Resource Estimate is based on the WMG Mulga Tank drilling database
which includes all drilling results up until mid-October 2026. Standard database validation checks and analysis,
including analysis of QAQC data, was completed prior to the resource estimation work. The area of interest was
wireframed and divided into four geological domains (Figure 7):
SAN - the sand cover above the Mulga Tank Complex (density 1.5) - all drill hole collars located by DGPS and
used to create Sand Cover Surface DTM
COX - completely oxidised zone beneath the sand cover (density 2.3) - a target for magnesite mineralisation
POX - partially oxidised zone (density 2.5) - thin transition zone to fresh dunite
UD - dunite containing disseminated sulphide mineralisation (density 2.7) - which was limited to a floor depth of
0RL, approximately 450m below surface.
ASX:WMG www.westernmines.com.au 9
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
Drill hole sample assay data was composited to 2m downhole lengths based on statistical analysis of sample
data (2m, 3m and 5m comparison) and sample length distributions (84% 1m, 15% 2m, 1% <1m). Given the
focus of the resource on predominantly Type 2 disseminated nickel sulphide mineralisation a top-cut of the 99th
percentile nickel assay value of 9,000ppm Ni was applied to the raw sample data. Hard domain boundaries
were used between the geological domains, meaning only composites within the domain were used to estimate
inside that domain.
Variography was undertaken on the composited sample data, with particular focus on nickel and sulphur, and
used to determine search space parameters and grade continuity. The variogram models for Ni indicate a
search of 300m in both the X and Y directions and about 20-30m in the Z direction and for S indicate a search
of 250m in the X and Y directions and about 30m in the Z direction (Figure 8). A first pass search radius of 250m
in the X and Y direction and 30m in the Z direction were chosen for Ordinary Kriging (OK) estimation.
ASX:WMG www.westernmines.com.au 10
Figure 7: Mulga Tank wireframe geological domains
Outline of main Mulga Tank dunite body, viewed from south looking north
Figure 8: Variogram models for Ni
SAN
COX
POX
UD
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
Each of the geological domains were block modelled using a parent block size of 50m x 50m x 10m, being
approximately half the minimum drill spacing, creating a block model with dimensions 3,700m x 2,100m x
460m. The Ordinary Kriging (OK) estimation method was used to estimate Ni, S, Co, Cu, Pd, Pt and Cr into the
3D block model with estimation performed in three passes:
First Pass - 250m search radius incorporating a minimum three drill holes
Second Pass - 400m search radius incorporating a minimum three drill holes
Third Pass - 800m search radius incorporating a minimum three drill holes
Whilst all four domains (SAN, COX, POX and UD) were block modelled the Mineral Resource Estimate is only
reported for the dunite domain (UD), and nickel within the oxidised domains (COX and POX) is specifically
excluded from the reported results.
Validation of the block model was completed by:
• Visual inspection of the block model estimation in comparison to raw and composited drill data on a
section-by-section basis (Figure 9)
• Volumetric comparison of the wireframe/solid volume to that of the block model volume for each domain
• Global statistical comparison of input and block grades, and local composite grade relationship plots
(swath plots, to the block model estimated grade for each domain
CLASSIFICATION CRITERIA
Two zones with closer drill hole spacing within the parent block model were identified and wireframed to define
the resource classification boundaries. The first zone, with drill holes nominally spaced at 200m x 200m (and
approximately corresponding to a first pass radius of 280m with minimum three drill holes), was defined as the
total resource and classified as Inferred. Within this total resource, a second zone with drill holes nominally
spaced at 100m x 100m (approximately corresponding to a first pass radius of 140m with minimum three drill
holes) was classified as Indicated. Blocks within the mineralisation domain, but outside of the Indicated and
Inferred classification boundaries, were categorised as Unclassified (Figure 5).
ASX:WMG www.westernmines.com.au 11
Figure 9: Visual inspection of block model and drill hole composites (section NS along E520650)
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
CUT-OFF GRADES
The Mulga Tank October 2026 Mineral Resource Estimated is reported at cut-off grade of 0.20% Ni similar to
the previous April 2025 estimate. This cut-off grade was chosen for a number of reasons:
• Many Canadian large, low-grade nickel sulphide deposits such as Canada Nickel Company’s Crawford
Project use a cut-off grade of 0.10% Ni (Crawford Nickel Sulphide Project NI 43-101 Technical Report and
Feasibility Study, 1 October 2023) so a cut-off of twice this value, and close to the Crawford Project overall
average grade of 0.23% Ni, was deemed appropriate to demonstrate the potential superiority of the Mulga
Tank deposit
• A cut-off of 0.20% Ni was calculated using the cut-off grade calculation formula:
Economic Cut-Off = (M + P + O) / r x (p-v)
Where M = mining cost, P = processing cost, O = overhead/G&A cost, r = metallurgical recovery, p = nickel
price and v = selling cost
MINING AND METALLURGICAL TEST WORK AND PARAMETERS
Given the shallow nature of the mineralisation it is anticipated that material would be extracted by open pit
mining and then processed on-site by conventional flotation mineral beneficiation methods to produce a
saleable nickel sulphide concentrate.
The large low-grade resource would be best exploited by a large scale operation, benefiting from the economies
of scale. Peer comparison against similar large low-grade gold and base metal projects suggest a modern large
open pit operation with a mining and processing rate of 20Mt to 40Mt per year of ore could be envisaged.
The Company has completed engineering capital cost estimates and operating cost estimates for a 20Mt per
year operation, scalable to 40Mt per year. These will form the basis of an initial Scoping Study currently being
completed for the project. The Company has also conducted preliminary benchmarking studies on a number of
global large low-grade nickel sulphide deposits, as well as, benchmarking against large-scale gold and base
metal project in Western Australia, in order to gauge potential unit operating costs and project parameters (Table
3).
WMG has completed preliminary sighter metallurgical test work on a bulk sample of material taken from the
upper portion (150m to 300m) of diamond hole MTD029 (EIS3). A series of different rougher flotation tests have
been conducted on the bulk sample material, each testing a range of different factors including grind size (38um
to 150um) and various reagents. Nickel sulphides have been successfully recovered in all of the tests.
The Company notes the recoveries used in feasibilities studies for Canadian large low-grade nickel sulphide
projects such as Crawford and Dumont of 41% LoM and 43% LoM respectively. These fall within the range of
results achieved by WMG to date and the Company will use the assumption of 40-45% recovery for Mulga Tank
for the time being until more extensive test work has been completed.
ASX:WMG www.westernmines.com.au 12
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
REASONABLE PROSPECTS FOR EVENTUAL ECONOMIC EXTRACTION
This Mineral Resource Estimate is presented on an unconstrained basis (i.e. not constrain within an open-pit
shell) in a like-for-like comparison to the previous April 2025 resource estimate (ASX, Mulga Tank Mineral
Resource over 5Mt Contained Nickel, 10 April 2025), that was also unconstrained. A pit shell constrained
resource may produce materially different numbers to those presented above.
WMG believes the Mulga Tank deposit has reasonable prospects for eventual economic extraction (RPEEE),
which is why the Company has continued to explore and advance the project even during the downturn in the
nickel price cycle over the last few years.
The Company is in the process of completing a first Scoping Study for the project over the next few weeks,
based on this upgraded Mineral Resource Estimate. This Scoping Study will better demonstrate in detail the
RPEEE of the resource in comparison to any statements made here. Early indications suggest the results for
capital cost and operating cost estimates should be in line with assumptions made in the section above along
with previous assumptions made in the April 2025 resource estimate.
The Company is pleased to present this updated Mineral Resource Estimate for the Mulga Tank Project. It
represents another significant milestone for the project. The team is excited to continue to advance the project
and is in the process of planning and developing further exploration programs for 2027. We look forward to
updating shareholders as they progress.
For further information please contact: Dr Caedmon Marriott
Managing Director
Tel: +61 475 116 798
Email: contact@westernmines.com.au
ASX:WMG www.westernmines.com.au 13
Project/Source Operation Size Unit Mining Cost Unit Processing Cost
Costmine Intelligence
(Global mining cost database)
29.2Mtpa US$ 2.20 per tonne US$ 6.80 per tonne
Canada Nickel - Crawford Nickel Project
(Crawford Nickel Sulphide Project NI 43-101 Technical
Report and Feasibility Study, 1 October 2023)
43.8Mtpa
US$ 4.78 per tonne ore
(Strip ratio 2.3:1)
US$ 5.19 per tonne ore
Dumont Nickel - Dumont Nickel Project
(Technical Report on the Dumont Ni Project, Launay and
Trécesson Townships, Quebec, Canada, 11 July 2019)
38.3Mtpa
C$ 3.82 per tonne ore
(Strip ratio 1:1)
C$ 5.20 per tonne ore
Chalice Mining - Gonneville Project
(Gonneville Nickel-Copper-PGE Project Scoping Study,
29 August 2023)
30Mtpa
A$ 3.80 per tonne mined
(Strip ratio 1.8:1)
A$ 27.50 per tonne processed
(Hydrometallurgical processing)
Newmont - Boddington Gold Mine
(Boddington Operations Western Australia, Australia, NI
43-101 Technical Report, 31 December 2018)
40.2Mtpa
A$ 4.22 per tonne ore
(Strip ratio 1:1)
A$ 9.71 per tonne ore
Newmont - Boddington Gold Mine
(Newmont Annual Report 2024)
34.9Mtpa
US$ 17.58 per tonne direct mining and production cost
with ~1:1 strip ratio for 2024
Caravel Minerals - Caravel Copper Project
(Caravel Copper Project Pre-Feasibility Study, July 2022,
and Caravel Copper Project Pre-Feasibility Study
Update, 20 September 2022)
27Mtpa
A$ 3.06 all-in per tonne mined
(Strip ratio 1.3:1)
A$ 9.26 all-in per tonne ore
Table 3: Benchmarking unit operating costs of various large low-grade nickel, gold and base metal projects
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
COMPETENT PERSON STATEMENT
The information in this announcement that relates to the Mineral Resource Estimate for the Mulga Tank Project
complies with the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and has been compiled and assessed
under the supervision of Dr Caedmon Marriott, Managing Director of Western Mines Group Ltd. Caedmon is a
Member of the Australian Institute of Geoscientists and a Member of the Society of Economic Geologists. He
has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
JORC Code. Caedmon consents to the inclusion in this announcement of the matters based on his information
in the form and context in which it appears.
ASX:WMG www.westernmines.com.au 14
This announcement has been authorised for release to the ASX by Dr Caedmon Marriott, Managing Director
ASX RELEASE | MULGA TANK MINERAL RESOURCE OVER 7MT CONTAINED NICKEL
APPENDIX 1 - DRILL HOLE COLLARS
HoleID Easting (MGA51) Northing (MGA51) Elevation (m) Total Depth (m) Azimuth Dip
MTD012 518664 6