More RC Intersections over 1% Ni at Mulga Tank
Released
Released
Announcement PDF
ASX RELEASE
11 JANUARY 2024
MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
HIGHLIGHTS
• Geochemical assay results received for 3 RC holes MTRC006 to MTRC008 at Mulga Tank
• All holes show broad zones of nickel sulphide mineralisation - elevated Ni and S coincident with
highly anomalous Cu and PGE:
MTRC006
Cumulative
159m at 0.29% Ni, 125ppm Co, 29ppm Cu, 12ppb Pt+Pd with S:Ni 0.6
MTRC007
Cumulative
168m at 0.29% Ni, 133ppm Co, 50ppm Cu, 16ppb Pt+Pd with S:Ni 1.0
MTRC008
Cumulative
91m at 0.24% Ni, 122ppm Co, 53ppm Cu, 15ppb Pt+Pd with S:Ni 1.1
• Holes MTRC006 and MTRC007 include intersections with results greater than 1% Ni:
MTRC006
1m at 1.19% Ni, 424ppm Co, 234ppm Cu, 21ppb Pt+Pd from 277m
1m at 0.96% Ni, 368ppm Co, 68ppm Cu, 41ppb Pt+Pd from 289m
MTRC007
2m at 1.05% Ni, 394ppm Co, 583ppm Cu, 27ppb Pt+Pd from 196m
inc. 1m at 1.58% Ni, 574ppm Co, 708ppm Cu, 39ppb Pt+Pd from 197m
• 19 of 20 RC holes received to date contain mineralisation - with around 40-70% length down
holes being mineralised - demonstrating continuity of shallow mineralisation across the Complex
• Possible higher grade core emerging in centre of Complex - follow-up RC drilling planned
• Preliminary modelling demonstrates large mineralised volumed de ned by the Company’s initial
drilling programs to date - which is open in nearly all directions
• WMG continues to de-risk a potentially globally signi cant, large-scale, open-pitable nickel
sulphide deposit at Mulga Tank
Western Mines Group Ltd (WMG or Company) (ASX:WMG) is pleased to update shareholders on geochemical
assay results recently received for three reverse circulation (RC) drill holes MTRC006 to MTRC008 at the Mulga
Tank Ni-Cu-Co-PGE Project, on the Minigwal Greenstone Belt, in Western Australia’s Eastern Gold elds.
WMG completed a 22 hole RC drilling program designed to test the extent of shallow disseminated nickel
sulphide mineralisation observed across the centre of the Mulga Tank Ultrama c Complex (ASX, Completion of
7000m RC Drilling Program at Mulga Tank, 7 November 2023).
Assay results have been received for three holes MTRC006 to MTRC008 which all highlight broad intersections
of nickel sulphide mineralisation. MTRC006 and MTRC007 show interesting results with further intersections of
nickel over 1% - MTRC006 1m at 1.19% Ni from 277m and MTRC007 2m at 1.05% Ni from 196m.
fi
fi
Telephone: +61 475 116 798
Email: contact@westernmines.com.au
www.westernmines.com.au
fi
Level 3, 33 Ord Street
West Perth WA 6005
ASX:WMG
Shares on Issue: 67.57m
Share Price: $0.23
Market Cap: $15.54m
Cash: $3.07m (31/10/23)
1
fi
Western Mines Group Ltd
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
With 20 of the 22 RC holes now received, the results con rm the drilling was successful in targeting shallow
mineralisation with cumulatively around ~50% of the samples from 19 of the holes showing mineralisation - with
elevated Ni and S, in combination with highly anomalous Cu and PGE. This uppermost zone appears to be
laterally very extensive as con rmed by the Company’s preliminary modelling.
Numerous intervals of interpreted nickel sulphide mineralisation based on geochemical signature were identi ed
down the holes including (*denotes ending in mineralisation):
MTRC006
85m at 0.27% Ni, 113ppm Co, 21ppm Cu, 9ppb Pt+Pd from 97m
inc. 2m at 0.49% Ni, 169ppm Co, 276ppm Cu, 0.2g/t Pt+Pd from 120m
74m at 0.31% Ni, 138ppm Co, 38ppm Cu, 15ppb Pt+Pd from 226m*
inc. 1m at 1.19% Ni, 424ppm Co, 234ppm Cu, 21ppb Pt+Pd from 277m
and inc. 1m at 0.96% Ni, 368ppm Co, 68ppm Cu, 41ppb Pt+Pd from 289m
Cumulative
159m at 0.29% Ni, 125ppm Co, 29ppm Cu, 12ppb Pt+Pd with S:Ni 0.6*
MTRC007
19m at 0.28% Ni, 143ppm Co, 137ppm Cu, 34ppb Pt+Pd from 124m
inc. 2m at 0.40% Ni, 153ppm Co, 170ppm Cu, 96ppb Pt+Pd from 128m
149m at 0.29% Ni, 132ppm Co, 39ppm Cu, 13ppb Pt+Pd from 151m*
inc. 2m at 1.05% Ni, 394ppm Co, 583ppm Cu, 27ppb Pt+Pd from 196m
that inc. 1m at 1.58% Ni, 574ppm Co, 708ppm Cu, 39ppb Pt+Pd from 197m
Cumulative
168m at 0.29% Ni, 125ppm Co, 29ppm Cu, 12ppb Pt+Pd with S:Ni 1.0*
MTRC008
39m at 0.24% Ni, 123ppm Co, 66ppm Cu, 16ppb Pt+Pd from 89m
10m at 0.24% Ni, 143ppm Co, 67ppm Cu, 18ppb Pt+Pd from 168m
24m at 0.28% Ni, 117ppm Co, 26ppm Cu, 11ppb Pt+Pd from 195m
18m at 0.20% Ni, 114ppm Co, 53ppm Cu, 15ppb Pt+Pd from 256m
Cumulative
91m at 0.24% Ni, 122ppm Co, 53ppm Cu, 15ppb Pt+Pd with S:Ni 1.1
Commenting on the RC assay results, WMG Managing Director Dr Caedmon Marriott said:
“Some great assay results to start the new year with three more holes taking our RC ‘hit rate’ to 19
out of 20 holes received to date showing broad zones of nickel sulphide mineralisation. This latest
batch returned a couple of intersections over 1% Ni in holes MTRC006 and MTRC007. These
holes were located on the southern boundary of the central-eastern area tested by the drilling demonstrating the mineralisation be open in this direction. In lling and extending this zone will likely
be a focus of our drilling programs planned for this year.
With nearly all the assay results now received the team has begun some preliminary modelling of
the results. A signi cant, large, low-grade, shallow mineralised body can be de ned within the main
part of the Complex by WMG’s drilling to date. This modelled body totals some 647,000,000 cubic
metres above 0.15% Ni and 0.1% S cut-offs, with a higher grade core in the central-eastern area of
420,000,000 cubic metres above 0.20% Ni and 0.5 S:Ni cut-off. Follow-up RC drilling is planned to
extend and better delineate this body, along with further modelling of the results to yield an initial
JORC Exploration Target, as the rst step towards generating an initial resource.”
2
fi
fi
fi
fi
fi
www.westernmines.com.au
fi
fi
ASX:WMG
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
MULGA TANK RC DRILLING PROGRAM
Exploration results from the Company’s various drilling programs at the Mulga Tank Project over the last 12
months have demonstrated signi cant nickel sulphide mineralisation and an extensive nickel sulphide mineral
system within the Mulga Tank Ultrama c Complex (ASX, MTD023 Assays Con rm Discovery of Signi cant Nickel
Sulphide System, 5 April 2023; MTD026 Assays - 840m of Nickel Sulphide Mineralisation, 30 August 2023;
MTD027 Expands Mineralisation 4km Across Mulga Tank, 28 August 2023).
The Company completed a 22 hole RC drilling program designed to systematically test the lateral continuity of
the shallow, uppermost zone of disseminated nickel sulphide mineralisation observed in the Company’s
diamond holes MTD012, MTD022, MTD023, MTD026, MTD027 and MTD028 within the main body of the
Mulga Tank Ultrama c Complex (ASX, Completion of 7000m RC Drilling Program at Mulga Tank, 7 November
2023) (Figure 1).
The holes were spaced at approximately 500m x 300m and cover a 2,500m x 1,000m area across the centre of
the Complex. Each hole was designed to a target depth of ~300m, which was achieved in all but three holes,
for a total of 7,035.5m - of which the top ~60m of each hole, or 1,321m in total, was mud-rotary drilling through
the sand cover.
All holes were sampled at 1m intervals from the start of RC drilling (i.e. base of mud rotary) with a total of 5,721
samples delivered to the ALS laboratory in Perth for geochemical assay.
All results have now been received by the Company with the exception of one batch of 321 samples, covering
parts of holes MTRC021 and MTRC022, due to one sample being identi ed as possibly brous and delaying
processing. Full results for holes MTRC021 and MTRC022 will be reported to shareholders once received.
HIGH MGO ADCUMULATE DUNITE
Assay results for MTRC006 averaged 47.4% MgO and 0.30% Al2O3 (volatile free) over the 237m ultrama c
portion of the hole, whilst MTRC007 averaged 48.4% MgO and 0.24% Al2O3 (volatile free) over 239m of
ultrama c and MTRC008 average 47.5% MgO and 0.19% Al2O3 (volatile free) over 237m of ultrama c. Using
Al2O3 as a proxy for interstitial material and MgO as a proxy for temperature, geochemical characterisation
shows the host rock to be nearly entirely high-temperature, extreme adcumulate dunite with Al2O3 generally less
than 0.5% and MgO greater than 40%.
This observation of extensive intersections of high MgO extreme adcumulate dunite within the Complex, starting
essentially immediately under the sand cover, has positive implications for the targeting of large volume, low
grade Type 2 Mt-Keith style disseminated nickel sulphide deposits within the Mulga Tank Complex.
fi
fi
fi
3
fi
fi
fi
fi
www.westernmines.com.au
fi
fi
fi
ASX:WMG
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
Figure 1: Assay results for shallow nickel sulphide mineralisation in the Mulga Tank Ultrama c Complex
NICKEL SULPHIDE MINERALISATION
Broad intersections of visible disseminated nickel sulphide mineralisation have frequently been observed in the
Company’s diamond core drilling and ~390m of disseminated sulphide was observed down hole MTRC009
ASX, RC Drilling Expansion and Drilling for Equity, 17 October 2023). However, this style of mineralisation is
generally harder to see in RC drill chips.
In the absence of magmatic sulphide processes nickel is incorporated into olivine during crystallisation and
essentially trapped within the dunite host rock. Whereas, in “live” sulphur saturated mineral systems the nickel
will partition into potentially “recoverable” nickel sulphide form. The Company uses a number of elements, such
as Cu and PGE’s (Pt and Pd), that have high af nity for sulphide (chalcophile), in combination with S (and the
S:Ni ratio) as geochemical indicators to con rm the presence of active magmatic sulphide processes and the
geochemical signature of nickel sulphide mineralisation.
4
fi
fi
www.westernmines.com.au
fi
ASX:WMG
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
The geochemical assay results for holes MTRC006 to MTRC008 demonstrate signi cant evidence for “live”
magmatic sulphide chemical processes and show a number of broad zones of highly anomalous Cu and PGE’s
in combination with elevated S, and a S:Ni ratio greater than 0.5 (Figures 2 to 7).
These anomalous zones provide strong evidence for nickel sulphide mineralisation and were generally de ned
by a combination of the various geochemical indicators and cut-off grades (Ni >0.16%, Cu >20ppm, Pt+Pd
>20ppb, S >0.1% and S:Ni >0.5), with only minimal inclusion of unmineralised material below mineable width.
MTRC006
85m at 0.27% Ni, 113ppm Co, 21ppm Cu, 9ppb Pt+Pd from 97m
inc. 2m at 0.49% Ni, 169ppm Co, 276ppm Cu, 0.2g/t Pt+Pd from 120m
74m at 0.31% Ni, 138ppm Co, 38ppm Cu, 15ppb Pt+Pd from 226m*
inc. 1m at 1.19% Ni, 424ppm Co, 234ppm Cu, 21ppb Pt+Pd from 277m
and inc. 1m at 0.96% Ni, 368ppm Co, 68ppm Cu, 41ppb Pt+Pd from 289m
Cumulative
159m at 0.29% Ni, 125ppm Co, 29ppm Cu, 12ppb Pt+Pd with S:Ni 0.6*
* Ending in mineralisation
Figure 2: MTRC006 Cu and Pt+Pd
Figure 3: MTRC006 S:Ni Ratio
5
fi
www.westernmines.com.au
fi
ASX:WMG
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
MTRC007
19m at 0.28% Ni, 143ppm Co, 137ppm Cu, 34ppb Pt+Pd from 124m
inc. 2m at 0.40% Ni, 153ppm Co, 170ppm Cu, 96ppb Pt+Pd from 128m
149m at 0.29% Ni, 132ppm Co, 39ppm Cu, 13ppb Pt+Pd from 151m*
inc. 2m at 1.05% Ni, 394ppm Co, 583ppm Cu, 27ppb Pt+Pd from 196m
that inc. 1m at 1.58% Ni, 574ppm Co, 708ppm Cu, 39ppb Pt+Pd from 197m
Cumulative
168m at 0.29% Ni, 125ppm Co, 29ppm Cu, 12ppb Pt+Pd with S:Ni 1.0*
* Ending in mineralisation
Figure 4: MTRC007 Cu and Pt+Pd
Figure 5: MTRC007 S:Ni Ratio
MTRC008
39m at 0.24% Ni, 123ppm Co, 66ppm Cu, 16ppb Pt+Pd from 89m
10m at 0.24% Ni, 143ppm Co, 67ppm Cu, 18ppb Pt+Pd from 168m
24m at 0.28% Ni, 117ppm Co, 26ppm Cu, 11ppb Pt+Pd from 195m
18m at 0.20% Ni, 114ppm Co, 53ppm Cu, 15ppb Pt+Pd from 256m
Cumulative
91m at 0.24% Ni, 122ppm Co, 53ppm Cu, 15ppb Pt+Pd with S:Ni 1.1
ASX:WMG
www.westernmines.com.au
6
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
Figure 6: MTRC008 Cu and Pt+Pd
Figure 7: MTRC008 S:Ni Ratio
DISCUSSION
WMG’s RC program is the rst systematic drilling of the Mulga Tank Ultrama c Complex and aims to test the
lateral continuity of the shallow, uppermost zone of disseminated nickel sulphide mineralisation observed in the
Company’s diamond holes MTD012, MTD022, MTD023, MTD026, MTD027 and MTD028 (Figure 1). The results
from this RC drilling will offer a step change in the understanding of the geology and geochemistry of the
Complex and its potential to host a signi cant disseminated nickel sulphide deposit.
The results from these three holes (and 17 previously announced holes) are very positive and demonstrate the
continuity of this uppermost zone of shallow mineralisation, with numerous broad intervals of interpreted nickel
sulphide mineralisation identi ed in all the holes. Around 40-70% of the samples from 19 of the 20 holes
received to date show the geochemical signature of nickel sulphide mineralisation with elevated Ni and S, in
combination with highly anomalous chalcophile elements Cu and PGE.
The Company believes the central area of the main body of the Mulga Tank Complex could host globally
signi cant quantities of disseminated Mt Keith-style nickel sulphide mineralisation which could be
amenable to large scale, open-pit mining operation.
fi
fi
fi
www.westernmines.com.au
fi
fi
ASX:WMG
7
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
These latest holes show further intersections of around 1% Ni or better:
MTRC006
1m at 1.19% Ni, 424ppm Co, 234ppm Cu, 21ppb Pt+Pd from 277m
1m at 0.96% Ni, 368ppm Co, 68ppm Cu, 41ppb Pt+Pd from 289m
MTRC007
2m at 1.05% Ni, 394ppm Co, 583ppm Cu, 27ppb Pt+Pd from 196m
1m at 1.58% Ni, 574ppm Co, 708ppm Cu, 39ppb Pt+Pd from 197m
Holes MTRC006 and MTRC007 are located on the southern edge of the central-eastern part of the Complex, in
an area where results from previously announced holes have identi ed richer zones of mineralisation (Figure 8).
These results highlight that mineralisation tested by the RC drilling is certainly open to the south of the initial area
targeted and currently remains unconstrained. The Company intends to follow-up with further drilling around this
area in early 2024, aimed at extending this zone.
Figure 8: Higher-grade assay results within the Mulga Tank Ultrama c Complex
fi
www.westernmines.com.au
fi
ASX:WMG
8
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
PRELIMINARY MODELLING
With all except one batch of assay results now received the Company has begun preliminary modelling of the
results as a rst step to generating a JORC Exploration Target and eventually working towards a Mineral
Resource (subject to further drilling and results, see cautionary note regarding implicit modelling).
Using the implicit grade modelling function of an industry standard 3D geological modelling software package
the Company has completed a rst-pass review of all drill hole assay results for the Mulga Tank Project mapping out the size and scale of the geochemical anomalies identi ed. This modelling work has de ned a
signi cant mineralised target volume within the main dunite body of the Mulga Tank Ultrama c Complex. Various
parameters, including Ni, S, Cu and PGE’s, were investigated and analysed to determine the extent of
mineralisation and de ne a number of models of the mineralised volume.
Two outcomes from the modelling work are shown in the gures below, with mineralised volumes determined by
coincident zones of higher S and S:Ni above certain Ni cut-off levels:
W
E
Outer shell
of dunite body
Figure 9: Volume of 458Mm3 de ned by implicit modelling of results using >0.15% Ni and >0.1% S cut-offs
Outline of main Mulga Tank dunite body, viewed from south looking north
W
E
Outer shell
of dunite body
fi
fi
fi
fi
fi
fi
fi
fi
fi
fi
Figure 10: Volume of 420Mm3 de ned by implicit modelling of results using >0.20% Ni and >0.5 S:Ni cut-offs
Outline of main Mulga Tank dunite body, viewed from south looking north
ASX:WMG
www.westernmines.com.au
9
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
E
W
Outer shell
of dunite body
Figure 11: Combined results of implicit modelling with higher grade core (pink: >0.20% Ni and >0.5 S:Ni
cut-offs) within overall mineralised volume of 647Mm3 (purple: >0.15% Ni and >0.1% S cut-offs)
Outline of main Mulga Tank dunite body
A shallow mineralised volume of ~458,000,000 cubic metres was modelled based on a nickel cut-off of >0.15%
Ni, coincident with a sulphur cut-off >0.1% S (Figure 9). The modelling was limited to a depth range of 380m RL
to 100m RL (i.e. starting ~100m below surface, eliminating any oxidised material, to approximately the depth of
current RC drilling).
A higher-grade mineralised volume of ~420,000,000 cubic metres was modelled based on a nickel cut-off of
>0.20% Ni, coincident with a S:Ni ratio of >0.5 (Figure 10). This modelling was limited to a depth range of 380m
RL to -100m RL (i.e. starting ~100m below surface, eliminating any oxidised material, to approximately the
depth of the deepest RC hole MTRC009).
When these volumes are combined (Figure 11) they produce a total modelled volume of ~647,000,000 cubic
metres (accounting for overlap).
Cautionary statement on implicit geochemical modelling
Implicit geochemical modelling is used as an exploration tool and a guide only to get a sense of
scale of the results to date and help guide future exploration. Insu cient drilling and exploration
has been conducted to determine a JORC compliant Mineral Resource and implicit modelling
should not be considered as a proxy or substitute for a JORC compliant Resource or Exploration
Target.
The Company notes Canada Nickel Company Inc’s (TSXV:CNC) recent Bankable Feasibility Study for their
Crawford Nickel Project (Crawford Nickel Sulphide Project, NI 43-101 Technical Report and Feasibility Study, 24
November 2023). The Crawford deposit is one of the largest undeveloped nickel sulphide deposits in the world
with a total measured, indicated and inferred resource of 4.25Bnt at 0.23% Ni for 9.76Mt of contained nickel
(quoted at a nickel cut-off of 0.10% Ni), with a S:Ni ratio of 0.24.
www.westernmines.com.au
ffi
ASX:WMG
10
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
The 0.15% Ni and 0.20% Ni cut-offs used in the Company’s preliminary modelling are somewhat higher than
those used for the Crawford resource, with WMG also targeting zones of considerably higher S and S:Ni ratios
>0.5 versus the Crawford overall S:Ni ratio of 0.24. Despite using more modest parameters, along with limiting
the depth range investigated, it is encouraging that the Company’s preliminary modelling of the results to date is
able to yield a mineralised target volume of the same order of magnitude as the Crawford Deposit.
The Company is currently nalising plans for our initial 2024 drilling programs and looks forward to updating
shareholders in the near future.
For further information please contact:
Dr Caedmon Marriott
Managing Director
Tel: +61 475 116 798
Email: contact@westernmines.com.au
This announcement has been authorised for release to the ASX by Dr Caedmon Marriott, Managing Director
www.westernmines.com.au
fi
ASX:WMG
11
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
APPENDIX
HoleID
From (m)
To (m)
Interval (m)
Ni (%)
Co (ppm)
Cu (ppm)
Pt + Pd (ppb)
MTRC006
97
inc. 120
182
122
85
2
0.27
0.49
113
169
21
276
9
200
MTRC006
226
inc. 277
and inc. 289
300
278
290
74
1
1
0.31
1.19
0.96
138
424
368
38
234
68
15
21
41
MTRC007
124
inc. 128
143
130
19
2
0.28
0.40
143
153
137
170
34
96
MTRC007
151
inc. 196
that inc. 197
300
198
198
149
2
1
0.29
1.05
1.58
132
394
574
39
583
708
13
27
39
MTRC008
89
128
39
0.24
123
66
16
MTRC008
168
178
10
0.24
143
67
18
MTRC008
195
219
24
0.28
117
26
11
MTRC008
256
274
18
0.20
114
53
15
Table 1: Signi cant intersections holes MTRC006 to MTRC008
HoleID
Easting (MGA51)
Northing (MGA51)
Total Depth (m)
Azimuth
Dip
MTRC006
521418
6688711
300
273
-71
MTRC007
520408
6688705
300
272
-70
MTRC008
519899
6688703
300
271
-69
Table 2: Collar details for holes MTRC006 to MTRC008
fi
ASX:WMG
www.westernmines.com.au
12
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
ABOUT WMG
Western Mines Group Ltd
Western Mines Group Ltd (ASX:WMG) is a mineral exploration company driven by the goal
ACN 640 738 834
Level 3, 33 Ord Street
West Perth
WA 6005
to create signi cant investment returns for our shareholders through exploration and
discovery of high-value gold and nickel sulphide deposits across a portfolio of highlyprospective projects located on major mineral belts of Western Australia.
Our agship project and current primary focus is the Mulga Tank Ni-Cu-PGE Project, a
Board
Rex Turkington
Non-Executive Chairman
major ultrama c complex found on the under-explored Minigwal Greenstone Belt.
Exploration results show signi cant evidence for an extensive working nickel sulphide
mineral system and is considered highly prospective for Ni-Cu-PGE mineralisation.
Dr Caedmon Marriott
Managing Director
The Company’s primary gold project is Jasper Hill, where WMG has strategically
Francesco Cannavo
Non-Executive Director
consolidated a 3km mineralised gold trend with walk-up drill targets. WMG has a diversi ed
Dr Benjamin Grguric
Technical Director
Leonora in the heart of the WA Gold elds; Youanmi (Au), Pavarotti (Ni-Cu-PGE), Rock of
portfolio of other projects including Melita (Au, Cu-Pb-Zn), midway between Kookynie and
Ages (Au), Broken Hill Bore (Au) and Pinyalling (Au, Cu, Li).
Capital Structure
Shares: 67.57m
Options: 20.12m
Share Price: $0.23
Market Cap: $15.54m
Cash (31/10/23): $3.07m
COMPETENT PERSONS STATEMENT
The information in this announcement that relates to Exploration Results and other technical
information complies with the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and has been
compiled and assessed under the supervision of Dr Caedmon Marriott, Managing Director
Follow us
of Western Mines Group Ltd. Caedmon is a Member of the Australian Institute of
@westernmines
Geoscientists, a Member of the Society of Economic Geologists and a Member of the
westernmines
Australasian Institute of Mining and Metallurgy. He has suf cient experience that is relevant
Western Mines Group
to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as de ned in the 2012 Edition of the
JORC Code. Caedmon consents to the inclusion in this announcement of the matters
based on his information in the form and context in which it appears.
DISCLAIMER
Some of the statements appearing in this announcement may be in the nature of forward looking statements. You should be
aware that such statements are only predictions and are subject to inherent risks and uncertainties. Those risks and
uncertainties include factors and risks speci c to the industries in which WMG operates and proposes to operate as well as
general economic conditions, prevailing exchange rates and interest rates and conditions in the nancial markets, among
other things. Actual events or results may differ materially from the events or results expressed or implied in any forward
looking statement. No forward looking statement is a guarantee or representation as to future performance or any other
future matters, which will be in uenced by a number of factors and subject to various uncertainties and contingencies, many
of which will be outside WMG’s control.
WMG does not undertake any obligation to update publicly or release any revisions to these forward looking statements to
re ect events or circumstances after today's date or to re ect the occurrence of unanticipated events. No representation or
warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions
or conclusions contained in this announcement. To the maximum extent permitted by law, none of WMG, its Directors,
employees, advisors or agents, nor any other person, accepts any liability for any loss arising from the use of the information
contained in this announcement. You are cautioned not to place undue reliance on any forward looking statement. The
forward looking statements in this announcement re ect views held only as at the date of this announcement.
13
fi
fi
fi
fi
fl
fl
fi
fi
fi
www.westernmines.com.au
fl
fi
fi
fl
fl
ASX:WMG
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
MULGA TANK PROJECT
JORC CODE, 2012 EDITION - TABLE 1
SECTION 1: SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
• Nature and quality of sampling (eg cut channels, • Reverse circulation (RC) drilling was completed
random chips, or speci c specialised industry
using standard industry best practice
standard measurement tools appropriate to the • Individual 1m samples were collected directly
minerals under investigation, such as down hole
from the rig sampling system. Samples were
gamma sondes, or handheld XRF instruments, etc).
crushed and pulverised to produce a subThese examples should not be taken as limiting the
sample for analysis by either multi-element
broad meaning of sampling.
ICP-AES (ME-ICP61 and ME-ICP41), precious
metals re assay (Au-AA25 or PGM-ICP23)
• Include reference to measures taken to ensure
sample representivity and the appropriate calibration
and loss on ignition at 1,000°C (ME-GRA05)
of any measurement tools or systems used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for re assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
Sampling
techniques
• Drill type (eg core, reverse circulation, open-hole • Reverse circulation percussion drilling rig with
hammer, rotary air blast, auger, Bangka, sonic, etc)
a 5.25inch face sampling bit
and details (eg core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what
method, etc).
Drilling
techniques
• Method of recording and assessing core and chip • Standard drilling techniques using “best
sample recoveries and results assessed.
practice” to maximise sample recovery
Measures
taken
to
maximise
sample
recovery
and
•
• Information not available to assess relationship
ensure representative nature of the samples.
between sample recovery and grade
Whether
a
relationship
exists
between
sample
•
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of ne/
coarse material.
Drill sample
recovery
fi
www.westernmines.com.au
fi
fi
ASX:WMG
fi
Commentary
14
ASX RELEASE | MORE RC INTERSECTIONS OVER 1% Ni AT MULGA TANK
Criteria
JORC Code explanation
Commentary
• Whether core and chip samples have been • Drill holes geologically logged on a metre basis
geologically and geotechnically logged to a level of • Logging is to a level of detail suf cient to
detail to support appropriate Mineral Resource
support a Mineral Resource estimation,
estimation, mining studies and metallurgical studies.
though further information would be required
Whether
logging
is
qualitative
or
quantitative
in
•
• Logging is qualitative in nature and recorded
nature. Core (or costean, channel, etc) photography.
l i t h o l o g y, m i n e r a l o g y, m i n e r a l i s a t i o n ,
weathering, colour, and other features of the
• The total length and percentage of the relevant
samples. Chip trays were photographed in
intersections logged.
both dry and wet form
• Drillhole was logged in full, apart from rock
rolled pre-collar intervals
Logging
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half • Individual 1m samples were collected directly
or all core taken.
from the rig sampling system. Samples were
crushed and pulverised to produce a sub• If non-core, whether rif ed, tube sampled, rotary split,
sample for analysis by either multi-element
etc and whether sampled wet or dry.
ICP-AES (ME-ICP61 and ME-ICP41), precious
• For all sample types, the nature, quality and
metals re assay (Au-AA25 or PGM-ICP23)
appropriateness of the sample preparation technique.
and loss on ignition at 1,000°C (ME-GRA05)
• Quality control procedures adopted for all subsampling stages to maximise representivity of • Majority of samples were dry however some
ground water was encountered and some
samples.
samples were taken wet
• Measures taken to ensure that the sampling is
Industry
standard sample preparation
representative of the in-situ material collected, •
techniques
were undertaken and considered
including for instance results for eld duplicate/
appropriate
for the sample type and material
second-half sampling.
sampled
• Whether sample sizes are appropriate to the grain
• The sample size is considered appropriate to
size of the material being sampled.
the grain size of the material being sampled
• The nature, quality and appropriateness of the • Samples analysed by four-acid digest multiassaying and laboratory procedures used and
element ICP-AES (ME-ICP61) or precious
whether the technique is considered partial or total.
metals re assay (Au-AA25 or PGM-ICP23) are
considered total or near total techniques
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters
Share your feedback
Discover