Western Mines Group Ltd (WMG or Company) (ASX:WMG) is pleased to update shareholders on the progress
of the current Phase 5 drilling program at the Mulga Tank Ni-Cu-Co-PGE Project, on the Minigwal Greenstone
Belt, in Western Australia’s Eastern Goldfields.
A key focus of the Phase 5 program is the delineation of higher grade mineralisation within the main body of the
Mulga Tank Ultramafic Complex. The first 10 reverse circulation (RC) holes of the program have been completed
so far, totalling 3,114m, with positive results observed. All holes encountered visible disseminated sulphide
mineralisation, along with a number of intersections approaching semi-massive sulphide in follow-up holes
around MTRC046.
A further 9 holes have been pre-collared and are ready to be drilled over the next ~2 weeks. These
predominantly RC holes will test new areas in the western portion of the Complex as well as follow-up around
previous hole MTRC066. The program will culminate with two shallow diamond holes planned near MTRC046,
these holes have already be been drilled with RC pre-collars to ~100m.
After drilling the current available holes the rig will likely take a break from the end of July to allow the site to be
quiet for a planned EIS co-funded seismic survey (ASX, WMG Wins $250,000 EIS Award for Mulga Tank
Seismic Survey, 27 April 2026). Further holes are planned after the seismic survey, and others are likely to be
added to the program as ongoing exploration results are received.
ASX:WMG www.westernmines.com.au 1
Western Mines Group Ltd
Unit 10, 448 Roberts Road
Subiaco WA 6008
HIGHLIGHTS
• Exploration update on the progress of Phase 5 drilling at the Mulga Tank Ni-Co-Cu-PGE Project
• Drilling progressing well with completion of first 10 RC holes and a further 9 holes pre-collared
ready to be drilled over the next ~2 weeks
• Phase 5 focused on the delineation of shallow higher grade mineralisation within the main body of
the Mulga Tank Complex
• Visible disseminated sulphide mineralisation seen in all holes so far along with a number of
intersections of coarser stringer to semi-massive sulphide in follow-up holes around MTRC046
• Rig will complete current available holes, culminating in two shallow diamond holes to follow-up
near MTRC046
• EIS co-funded seismic survey designed to map the basal contact and 3D architecture of the
Mulga Tank Complex to follow in August
MULGA TANK PHASE 5 EXPLORATION UPDATE
ASX RELEASE
1 JULY 2026
Telephone: +61 475 116 798
Email: contact@westernmines.com.au
Shares on Issue: 113.80m
Share Price: $0.19
Market Cap: $21.62m
Cash: $2.43m (31/03/26)
Commenting on the progress of Phase 5, WMG Managing Director Dr Caedmon Marriott said:
“The Phase 5 program is progressing well. We’ve pre-collared a good batch of holes and are in the
process of drilling these out over the next couple of weeks. Along with the recent MTRC001
diamond tail these will complete the majority of the previously announced Phase 5 plans.
Visual observations so far have been good with more visible disseminated sulphide mineralisation,
and even some intervals approaching semi-massive sulphide in hole MTRC078, one of the
MTRC046 follow-up holes. The rig is currently drilling in a new area in the southwestern portion of
the main body of the Complex and will then finish some further holes around MTRC066. After the
remaining 7 RC holes it will then switch to diamond and drill two shallow diamond holes near
MTRC046 that have currently been RC pre-collared to ~100m depth (MTRC076 and MTRC077).
After this batch of drilling we’re looking to lock in the EIS seismic survey for hopefully sometime in
August. The rig will take a break to allow a ‘quiet site’ for the survey before recommencing later in
the year.”
MULGA TANK EXPLORATION PROGRAMS
Exploration results from the Company’s various drilling programs at the Mulga Tank Project over the last three
years have demonstrated significant nickel sulphide mineralisation and an extensive nickel sulphide mineral
system within the Mulga Tank Ultramafic Complex.
WMG has undertaken a combination of both diamond and reverse circulation (RC) drilling. With this two
pronged approach, RC is used to infill and prove up the extent of shallow disseminated nickel sulphide
mineralisation, defined by the Company’s recent Mineral Resource Estimate (ASX, Mulga Tank Mineral Resource
Over 5Mt Contained Nickel, 10 April 2025), whilst the diamond drilling program continues to test deeper targets
for basal massive sulphide.
PROGRESS OF PHASE 5 DRILLING
The Company is in the process of completing a Phase 5 drilling campaign within the main body of the Mulga
Tank Ultramafic Complex (ASX, Mulga Tank Phase 5 Drilling Plans, 9 February 2026). This will test new areas of
the Complex, along with some infill holes within the current resource estimate. A focus of the Phase 5 program
is the delineation of higher grade mineralisation, particularly following-up around previous intervals in MTRC046
and MTRC066, as well as testing new areas of the Complex up-dip from richer basal zones for shallow broad
+100m +0.40% Ni zones nearer surface.
The first 10 RC holes of the Phase 5 program have been drilled, totalling 3,114m. A further 9 holes have been
mud-rotary pre-collared to ~60m through the sand cover and are ready to be drilled over the next ~2 weeks.
Drilling is progressing smoothly and the Company is hoping to complete the majority of the Phase 5 program by
mid-late July. The holes will be predominantly drilled as RC but the last two holes of this batch will be drilled as
diamond around MTRC046, in order to get a better look at the visual mineralisation in this area. These two
holes, MTRC076 and MTRC077 have already been RC pre-collared to ~100m depth and will be extended to
~300m with diamond.
ASX:WMG www.westernmines.com.au 2
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
VISUAL RESULTS FROM MTRC078
Positive results have been observed in the holes completed so far with all holes encountering visible
disseminated sulphide mineralisation, along with a number of intersections abundant coarser sulphide chips,
approaching stringer to semi-massive sulphide content, in follow-up holes around MTRC046 (Table 1).
ASX:WMG www.westernmines.com.au 3
Figure 1: Phase 5 RC Drilling Hole Status
Cautionary statement on visible sulphides
Whilst previous mineralogical work on a limited number of samples from diamond core holes has
confirmed disseminated pentlandite mineralisation similar mineralogical investigation has not yet
been performed on these RC holes. Descriptions of visible sulphides should never be considered
a proxy or substitute for laboratory analysis. Only subsequent laboratory geochemical assay can
be used to determine the widths and grade of mineralisation. WMG will update shareholders
when laboratory results become available.
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
HoleID
From
(m)
To
(m)
Interval
(m)
Lithology
Sulphide
Texture
Sulphide
Abundance (%)
Sulphides
Observed
MTRC078
108 109 1 Dunite
Disseminated
Veinlet
tr-2%
3-5%
Pentlandite
Pentlandite-Pyrrhotite
112 132 20 Dunite Disseminated 1-4% Pentlandite
135 140 5 Dunite Disseminated tr-1% Pentlandite
144 145 1 Dunite Disseminated tr-1% Pentlandite
158 162 4 Dunite Disseminated tr-1% Pentlandite
166 167 1 Dunite Disseminated 1-2% Pentlandite
170 175 5 Dunite Disseminated 1-2% Pentlandite
181 187 6 Dunite Disseminated tr-1% Pentlandite
190 191 1 Dunite Disseminated 1-2% Pentlandite
207 208 1 Dunite Disseminated 1-2% Pentlandite
212 220 8 Dunite Disseminated 1-2% Pentlandite
229 230 1 Dunite Disseminated tr-1% Pentlandite
234 235 1 Dunite Disseminated tr-1% Pentlandite
238 240 2 Dunite Disseminated 1-2% Pentlandite
244 245 1 Dunite Disseminated 1-2% Pentlandite
290 294 4 Dunite Disseminated 1-2% Pentlandite
294 297 3 Dunite
Disseminated
Veinlet
1-2%
10-25%
Pentlandite
Pentlandite-Pyrrhotite
297 317 20 Dunite Disseminated 1-8% Pentlandite
ASX:WMG www.westernmines.com.au 4
Table 1: Visual sulphide table for hole MTRC078
Figure 2: Example of coarser sulphide in RC drill chips hole MTRC078 (295-296m)
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
E39/2132 EIS SEISMIC SURVEY
The Company is finalising plans for a seismic survey over the Complex following a recent successful EIS
geophysics grant (ASX, WMG Wins $250,000 EIS Award for Mulga Tank Seismic Survey, 27 April 2026). The
Company has submitted a PoW and recently accepted an acquisition proposal for the project work. It is
currently hoped the survey could be undertaken in August once the current batch of drilling plans have been
completed.
The proposed ~100 line kilometre ~35km2 active seismic survey (Figure 3) will be instrumental in visualising the
3D architecture of the Complex and in particular mapping the prospective basal contact and possible feeder
vent. The survey may even be able to directly detect the presence of significant massive sulphide
accumulations, applying a Perseverance target model (>4m thickness). Correlating the survey results with the
geological results from the deep diamond holes and integrating them with existing magnetic and gravity 3D
datasets, will aid targeting the basal contact for Perseverance-style massive nickel sulphide deposits.
ASX:WMG www.westernmines.com.au 5
Figure 3: WMG’s planned active seismic survey over the Mulga Tank Complex
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
The Company looks forward to updating shareholders on these ongoing exploration activities and the continuing
progress at Mulga Tank as further results are received.
For further information please contact: Dr Caedmon Marriott
Managing Director
Tel: +61 475 116 798
Email: contact@westernmines.com.au
Western Mines Group InvestorHub
Investors are encouraged to join the Western Mines Group InvestorHub to receive news and updates, engage
directly with the WMG team, and post questions and feedback through the Q&A function accompanying each
piece of content.
How to join:
1. Head to our InvestorHub
2. Follow the prompts to sign up for an InvestorHub account
3. Complete your account profile
ASX:WMG www.westernmines.com.au 6
This announcement has been authorised for release to the ASX by Dr Caedmon Marriott, Managing Director
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
APPENDIX
ASX:WMG www.westernmines.com.au 7
HoleID Easting (MGA51) Northing (MGA51) Total Depth (m) Azimuth Dip
MTRC046 520896 6688502 300 270 -70
MTRC066 520488 6688039 330 270 -70
MTRC076 520796 6688566 108 RC 270 -70
MTRC077 520913 6688557 114 RC 270 -70
MTRC078 521016 6688558 318 270 -70
MTRC079 520819 6688429 324 270 -70
MTRC080 520896 6688432 318 270 -70
MTRC081 520999 6688433 318 270 -70
MTRC082 520570 6688120 300 270 -70
MTRC083 518900 6689000 318 270 -70
MTRC084 518900 6688500 318 270 -70
MTRC085 519200 6688500 300 270 -70
MTRC086 518900 6688200 300 270 -70
MTRC087 519200 6688200 300 270 -70
Table 2: Collar details for holes mentioned in announcement
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
ASX:WMG www.westernmines.com.au 8
ABOUT WMG
Western Mines Group Ltd (ASX:WMG) is a mineral exploration company driven by the goal
to create significant investment returns for our shareholders through exploration and
discovery of high-value gold and nickel sulphide deposits across a portfolio of highly-
prospective projects located on major mineral belts of Western Australia.
Our flagship project is the Mulga Tank Ni-Co-Cu-PGE Project, a major ultramafic complex
found on the under-explored Minigwal Greenstone Belt (100% WMG). WMG’s exploration
work has discovered a significant nickel sulphide mineral system and is considered highly
prospective for globally significant Ni-Co-Cu-PGE deposits. An Mineral Resource Estimate
of 1,968Mt at 0.27% Ni, over 5.3Mt of contained nickel, was announced in April 2025,
making Mulga Tank the largest nickel sulphide deposit in Australia.
The Company’s primary gold project is Jasper Hill, where WMG has strategically
consolidated a 3km mineralised gold trend with walk-up drill targets. WMG has a diversified
portfolio of other projects including Fraser Range (Ni-Cu-Co), Mt Narryer (Ni-Co-Cu-PGE,
Au) and Youanmi (Au).
COMPETENT PERSONS STATEMENT
The information in this announcement that relates to Exploration Results and other technical
information complies with the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and has been
compiled and assessed under the supervision of Dr Caedmon Marriott, Managing Director
of Western Mines Group Ltd. Caedmon is a Member of the Australian Institute of
Geoscientists and a Member of the Society of Economic Geologists. He has sufficient
experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the JORC Code. Caedmon consents to the inclusion in this
announcement of the matters based on his information in the form and context in which it
appears.
DISCLAIMER
Some of the statements appearing in this announcement may be in the nature of forward looking statements. You should be
aware that such statements are only predictions and are subject to inherent risks and uncertainties. Those risks and
uncertainties include factors and risks specific to the industries in which WMG operates and proposes to operate as well as
general economic conditions, prevailing exchange rates and interest rates and conditions in the financial markets, among
other things. Actual events or results may differ materially from the events or results expressed or implied in any forward
looking statement. No forward looking statement is a guarantee or representation as to future performance or any other
future matters, which will be influenced by a number of factors and subject to various uncertainties and contingencies, many
of which will be outside WMG’s control.
WMG does not undertake any obligation to update publicly or release any revisions to these forward looking statements to
reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events. No representation or
warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions
or conclusions contained in this announcement. To the maximum extent permitted by law, none of WMG, its Directors,
employees, advisors or agents, nor any other person, accepts any liability for any loss arising from the use of the information
contained in this announcement. You are cautioned not to place undue reliance on any forward looking statement. The
forward looking statements in this announcement reflect views held only as at the date of this announcement.
Western Mines Group Ltd
ACN 640 738 834
Unit 10, 448 Roberts Road
Subiaco
WA 6008
Board
Rex Turkington
Non-Executive Chairman
Dr Caedmon Marriott
Managing Director
Francesco Cannavo
Non-Executive Director
Dr Benjamin Grguric
Technical Director
Capital Structure
Shares: 113.80m
Options: 25.70m
Share Price: $0.19
Market Cap: $21.62m
Cash (31/03/26): $2.43m
Follow us
@westernmines
Western Mines Group
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
MULGA TANK PROJECT
JORC CODE, 2012 EDITION - TABLE 1
SECTION 1: SAMPLING TECHNIQUES AND DATA
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
• Reverse circulation (RC) drilling was completed
using standard industry best practice
• Individual 1m samples were collected directly
from the rig sampling system. Samples will be
crushed and pulverised to produce a sub-
sample for analysis by either multi-element
ICP-AES (ME-ICP61 and ME-ICP41), precious
metals fire assay (Au-AA25 or PGM-ICP23)
and loss on ignition at 1,000°C (ME-GRA05)
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what
method, etc).
• Reverse circulation percussion drilling rig with
a 5.25inch face sampling bit
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of fine/
coarse material.
• Standard drilling techniques using “best
practice” to maximise sample recovery
• Information not available to assess relationship
between sample recovery and grade
ASX:WMG www.westernmines.com.au 9
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
Logging
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
• Drill holes geologically logged on a metre basis
• Logging is to a level of detail sufficient to
support a Mineral Resource estimation,
though further information would be required
• Logging is qualitative in nature and recorded
lithology, mineralogy, mineralisation,
weathering, colour, and other features of the
samples. Chip trays were photographed in
both dry and wet form
• Drillhole was logged in full, apart from rock
rolled pre-collar intervals
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half
or all core taken.
• If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field duplicate/
second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
• Individual 1m samples were collected directly
from the rig sampling system. Samples will be
crushed and pulverised to produce a sub-
sample for analysis by either multi-element
ICP-AES (ME-ICP61 and ME-ICP41), precious
metals fire assay (Au-AA25 or PGM-ICP23)
and loss on ignition at 1,000°C (ME-GRA05)
• Majority of samples were dry however some
ground water was encountered and some
samples were taken wet
• Industry standard sample preparation
techniques will be undertaken and considered
appropriate for the sample type and material
sampled
• The sample size is considered appropriate to
the grain size of the material being sampled
Quality of
assay data
and laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been established.
• Samples will be analysed by four-acid digest
multi-element ICP-AES (ME-ICP61) or
precious metals fire assay (Au-AA25 or PGM-
ICP23) are considered total or near total
techniques
• Standards, blanks and duplicate samples were
introduced through-out the sample collection
on a 1:20 ratio to ensure quality control
• ALS also undertake duplicate analysis and run
internal standards as part of their assay regime
Verification of
sampling and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Primary logging data was collected using
Ocris logging system on a laptop computer,
• All logging was compiled into a SQL database
server
Criteria JORC Code explanation Commentary
ASX:WMG www.westernmines.com.au 10
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
SECTION 2: REPORTING OF EXPLORATION RESULTS
Location of
data points
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drill holes located using a handheld GPS with
accuracy of +/-3m
• Downhole surveys were performed at collar
and end of hole
• Coordinates are in UTM Zone 51
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Infill drilling will be included in updated Mineral
Resource Estimate
• The drilling completed in western margin was
reconnaissance in nature stepping out from
existing known mineralisation
• Spacing of western drilling from existing
Mineral Resource estimate is likely currently
too great to include within the current resource
estimate without further infill
• No sample compositing
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the deposit
type.
• If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
• The drilling was planned to be approximately
perpendicular to the interpreted stratigraphy
and mineralisation
Sample
security
• The measures taken to ensure sample security. • Samples delivered to the laboratory by
company personnel
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• No audits or reviews of drilling sampling
techniques or data by external parties
• An internal review of sampling techniques and
data will be completed
Criteria JORC Code explanation Commentary
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical
sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
• Tenements E39/2132, E39/2134 and
E39/2223, tenement application E39/2299
• Held 100% by Western Mines Group Ltd
• 1% NSR over tenement E39/2134, tenements
E39/2132 and E39/2223 are royalty free
• Native Title held by Upurli Upurli Nguratja and
Nyalpa Pirniku
• No known registered sites of historical interest
within the tenement area
• Goldfields Priority Ecological Community
PEC54 borders eastern edge of project area
• Tenement is in good standing
ASX:WMG www.westernmines.com.au 11
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
• Previous exploration over the Mulga Tank
project area by various companies dates back
to the 1980s
• Of these, more detailed exploration was
completed by BHP Minerals Pty Ltd (1982–
1984), MPI Gold Pty Ltd (1995–1999), North
Limited (1999–2000), King Eagle Resources
Pty Ltd (2004–2012), and Impact (2013–2018)
Geology
• Deposit type, geological setting and style of
mineralisation.
• The geology of the project area is dominated
by the irregular shaped Mulga Tank
serpentinised metadunite intrusive body
measuring ~5km x 5km, hosted within
metasediments, mafic to felsic schists and
foliated metagranite of the northwest trending
Archean Minigwal Greenstone Belt
• Previous drilling intersected disseminated and
narrow zones of massive nickel-copper
sulphide mineralisation within the dunite
intrusion
• The intrusion is concealed under variable
thicknesses of cover (up to 70 m in places)
with the interpretation of the bedrock geology
based largely on aeromagnetic data and
limited drilling
Drill hole
information
• A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth hole
length.
• If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.
• A listing of the drill hole information material to
the understanding of the exploration results
provided in the body of this announcement
• The use of any data is recommended for
indicative purposes only in terms of potential
Ni-Cu-PGE mineralisation and for developing
exploration targets
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths
of high grade results and longer lengths of low grade
results, the procedure used for such aggregation
should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• No metal equivalent values have been quoted
Criteria JORC Code explanation Commentary
ASX:WMG www.westernmines.com.au 12
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to
the drill hole angle is known, its nature should be
reported.
• If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (eg ‘down hole length, true width not known’).
• The drillhole was oriented to intersect
perpendicular to the mineralisation or
stratigraphy
• The relationship of the downhole length to the
true width is not known
Diagrams
• Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported. These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
• Appropriate maps, photos and tabulations are
presented in the body of the announcement
Balanced
reporting
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
• Appropriate results given in the body of the
announcement
Other
substantive
exploration
data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• Not applicable
Further work
• The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Future exploration planned includes further drill
testing of targets identified
• Future drilling may include infill drilling to extend
Mineral Resource estimate and will depend on
interpretation of results
Criteria JORC Code explanation Commentary
ASX:WMG www.westernmines.com.au 13
ASX RELEASE | MULGA TANK PHASE 5 EXPLORATION UPDATE
Share your feedback