Exploration Drilling to Recommence at Mulga Tank
Released
Released
Announcement PDF
ASX RELEASE
30 JUNE 2025
EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
HIGHLIGHTS
• WMG team mobilising to site this week to commence the next phase of exploration drilling at the
Mulga Tank Ni-Co-Cu-PGE Project
• Phase 4 RC program to both infill and extend the recent Mineral Resource Estimate within the
main body of the Mulga Tank Complex
• High-impact diamond drilling targeting western margin of the Mulga Tank Complex following
prospectivity review of the basal contact
• DHEM survey and follow-up diamond drilling around MTRC046 which previously returned shallow
high-grade intersections of up to 5m at 1.92% Ni
• Two diamond holes targeting komatiite channels within tenement E39/2134 - being drilled with the
aid of an EIS grant
• Further EIS funded deep diamond hole EIS8 testing revised interpretation and basal MobileMT
anomaly in the centre of the Mulga Tank Complex
• Ongoing exploration modelling, targeting work and the results of the DHEM surveys will likely add
further drill holes as these programs progress
Western Mines Group Ltd (WMG or Company) (ASX:WMG) is pleased to update shareholders on the
recommencement of exploration activities at the Mulga Tank Ni-Cu-Co-PGE Project, on the Minigwal
Greenstone Belt, in Western Australia’s Eastern Goldfields. Drilling programs planned for the second half of 2025
will involve a combination of both further reverse circulation (RC) and diamond drilling, funded by our recent
capital raise (ASX, Capital Raise to Recommence Drilling at Mulga Tank, 27 May 2025) and successful
Exploration Incentive Scheme (EIS) grants (ASX, WMG Wins Two EIS Awards Totalling $440,000 for Mulga Tank,
28 April 2025).
Our exploration team will be mobilising to site this week to recommence exploration drilling. The Company has
planned a Phase 4 drilling program with both RC drilling, looking to infill and extend the recent Mineral Resource
Estimate (ASX, Mulga Tank Mineral Resource Over 5Mt Contained Nickel, 10 April 2025), as well as further
diamond drilling testing high-impact targets. The diamond drilling will include three holes to be drilled with the
aid of WMG’s recent EIS grants. Further diamond holes will follow-up the high-grade results within hole
MTRC046 (ASX, MTRC046 Two High-Grade Zones inc. 5m at 1.92% Ni 0.21% Cu, 17 September 2024) and
target the western margin of the Mulga Tank Complex following a prospectivity review of the basal architecture
and mapping of high-grade and high-tenor massive sulphide globules.
Western Mines Group Ltd
Level 3, 33 Ord Street
West Perth WA 6005
ASX:WMG
Telephone: +61 475 116 798
Email: contact@westernmines.com.au
www.westernmines.com.au
Shares on Issue: 96.79m
Share Price: $0.14
Market Cap: $13.55m
Cash: $1.56m (30/06/25)
1
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
A Down Hole ElectroMagnetic (DHEM) survey crew is also scheduled to mobilise to site over the coming weeks
to survey a number of Phase 3 RC holes including MTRC046 5m at 1.92% Ni, 0.21% Cu from 283m and
MTRC055 4m at 1.16% Ni, 0.13% Cu from 182m, including 1m at 2.46% Ni, 0.43% Cu from 183m. Results
from the DHEM survey will be used to aid the placement of the follow-up diamond holes in these areas.
Commenting on the exploration plans, WMG Managing Director Dr Caedmon Marriott said:
“The team are looking forward to getting back on site to commence further drilling at the Mulga
Tank Project. It has been just under nine months since we completed the Phase 3 RC program and
the Company has tried to carefully manage capital through the current trough in nickel prices.
We’ve planned a combination of further RC and diamond drilling for the third quarter of 2025. RC
drilling at the project has been very good at quickly, and relatively cheaply, defining extensive
disseminated nickel sulphide mineralisation as highlighted by our Mineral Resource Estimate in
April. Additional RC holes are planned to both infill and extend the resource, always searching for
higher grade tonnes to optimise an open-pit mine plan.
The previous Phase 3 RC program also encountered further shallow high-grade intervals, returning
the best high-grade intersection ever drilled at the project in hole MTRC046. These Phase 3 holes
have not yet been tested by DHEM and a survey is planned during July that will aid the placement
of follow-up diamond holes targeting shallow massive sulphide in these areas.
With a significant initial mineral resource defined, the Company can now ‘swing the bat’ a bit with
further diamond holes testing for basal massive sulphide accumulations in what we believe is a
hybrid Type1-2 system. Three of these deeper diamond holes will be drilled with the aid of recent
EIS grants. The exciting results of a review of the basal architecture, and frequent occurrences of
massive sulphide globules, has led us back to the western margin of Complex. We’ve planned a
series of diamond tails of the western most RC fence in order to systematically (and frugally) test
the basal zone, in particular around MTD028 which returned 140m at 0.49% Ni at depth.”
MULGA TANK EXPLORATION PROGRAMS
Exploration results from the Company’s various drilling programs at the Mulga Tank Project over the last two
years have demonstrated significant nickel sulphide mineralisation and an extensive nickel sulphide mineral
system within the Mulga Tank Ultramafic Complex (ASX, MTD023 Assays Confirm Discovery of Significant Nickel
Sulphide System, 5 April 2023; MTD026 Assays - 840m of Nickel Sulphide Mineralisation, 30 August 2023;
Over 1,200m of Sulphide Mineralisation in MTD029 (EIS3), 19 February 2025).
WMG has undertaken a combination of both diamond and RC drilling. With this two pronged approach, RC is
used to infill and prove up the extent of shallow disseminated nickel sulphide mineralisation, defined by the
Company’s recent Mineral Resource Estimate (ASX, Mulga Tank Mineral Resource Over 5Mt Contained Nickel,
10 April 2025), whilst the diamond drilling program continues to test deeper targets for basal massive sulphide.
The Company has planned a combination of both further RC and diamond drilling, funded by our recent capital
raise (ASX, Capital Raise to Recommence Drilling at Mulga Tank, 27 May 2025) and successful EIS grants (ASX,
WMG Wins Two EIS Awards Totalling $440,000 for Mulga Tank, 28 April 2025). Additional drill holes will continue
to be added to these programs, with ongoing targeting work, as the Company systematically explores the
Mulga Tank Ultramafic Complex.
ASX:WMG
www.westernmines.com.au
2
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
PHASE 4 RC DRILLING
The Company has planned further RC drilling within the main body of the Mulga Tank Ultramafic Complex. The
majority of the holes are designed to test to the south of the previous core area of drilling, along with some infill
holes within the current resource estimate.
The first four planned holes step-out approximately 300m to the south of previous drilling, hoping to extend
current known mineralisation. These holes were collared (but not drilled) during the Phase 3 program allowing
the team to quickly get up and running. Further holes are planned to infill between the two areas of indicated
mineral resource and increase resource confidence. Depending on results, another fence of holes could be
drilled to the south of the current resource shell looking to extend the mineral resource. The step-out drilling will
target new areas, always searching for higher value tonnes. Defining shallow zones of ~0.40% Ni, for potential
“starter pit” areas, is a focus of our exploration strategy.
Figure 1: Phase 4 RC Drilling Planned
DHEM SURVEY AND HIGH-GRADE FOLLOW-UP
Drill holes from the previous Phase 3 RC program have not been tested by DHEM and a multiple hole survey
has been designed in the central core area of the Mulga Tank Complex. The survey will prioritise a number of
holes from the Phase 3 program which returned high-grade results including holes MTRC046, MTRC051,
MTRC055 and MTRC056:
ASX:WMG
www.westernmines.com.au
3
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
MTRC046
193m at 0.33% Ni, 152ppm Co, 310ppm Cu, 25ppb Pt+Pd from 107m S:Ni 1.5*
inc. 1m at 0.80% Ni, 355ppm Co, 0.12% Cu, 78ppb Pt+Pd from 182m
and inc. 10m at 0.81% Ni, 352ppm Co, 0.28% Cu, 77ppb Pt+Pd from 224m
that inc. 4m at 1.14% Ni, 501ppm Co, 803ppm Cu, 0.14g/t Pt+Pd from 224m
and that inc. 5m at 0.61% Ni, 258ppm Co, 0.49% Cu, 32ppb Pt+Pd from 229
and inc. 7m at 1.52% Ni, 578ppm Co, 0.16% Cu, 0.17g/t Pt+Pd from 282m
that inc. 5m at 1.92% Ni, 711ppm Co, 0.21% Cu, 0.18g/t Pt+Pd from 283m
MTRC051
3m at 0.70% Ni, 400ppm Co, 0.38% Cu, 0.17g/t Pt+Pd from 147m
inc. 1m at 1.18% Ni, 650ppm Co, 0.67% Cu, 0.31g/t Pt+Pd from 148m
MTRC055
11m at 0.63% Ni, 211ppm Co, 535ppm Cu, 4ppb Pt+Pd from 175m
inc. 4m at 1.16% Ni, 345ppm Co, 0.13% Cu, 6ppb Pt+Pd from 182m
that inc. 1m at 2.46% Ni, 641ppm Co, 0.43% Cu, 18ppb Pt+Pd from 183m
1m at 1.26% Ni, 489ppm Co, 431ppm Cu, 49ppb Pt+Pd from 239m
MTRC056
27m at 0.45% Ni, 172ppm Co, 263ppm Cu, 51ppb Pt+Pd from 108m
inc. 1m at 1.25% Ni, 398ppm Co, 0.15% Cu, 0.33g/t Pt+Pd from 96m
3m at 0.50% Ni, 237ppm Co, 0.40% Cu, 18ppb Pt+Pd from 273m
Results from the DHEM survey will be used to plan follow-up diamond holes looking to twin the RC holes and/or
target off-hole conductors potentially indicating thicker intersections of shallow massive sulphide material.
Figure 2: DHEM Survey and Follow-Up Planned
ASX:WMG
www.westernmines.com.au
4
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
E39/2134 EIS DIAMOND DRILLING
The Company was successful in its EIS Deep Drilling application in Round 31 of the Co-funded Exploration
Drilling Program for two diamonds holes within tenement E39/2134 (ASX, WMG Wins Two EIS Awards Totalling
$440,000 for Mulga Tank, 28 April 2025).
The two diamond holes will follow-up on the recent first belt-wide drilling program testing the interpreted
komatiite channel system emanating in a northwest direction from the main part of the Complex. Regional RC
holes MTRC062 (EIS6) and MTRC063 (EIS7) contained olivine cumulate/dunite and komatiite lithologies (ASX,
Regional EIS Drilling Confirms Belt-Scale Mineral System, 3 October 2024), whilst geochemical assay results
demonstrated hot, dynamic high MgO komatiite flows with Ni, S and chalcophile element results highlighting a
fertile nickel sulphide environment. These results were further supported by petrographic analysis confirming the
visible sulphide mineralisation to be abundant pentlandite (nickel iron sulphide) with minor pyrrhotite and pyrite
observed (iron sulphides) (ASX, Assays and Petrology Confirm Fertile Komatiite System, 3 December 2024).
The two diamond holes will test the ~1.3km long body, interpreted from aeromagnetic imagery (Figure 3), and
will look to record the stratigraphy of the komatiite system and target the basal contact that wasn’t reached with
the shallower RC holes. Previous RC hole MTRC063 ended in mineralisation and is also planned to be extended
with a diamond tail.
E39/2134
EIS9 E39/2134
Interpreted komatiite
channel wireframe
AMAG 3D Inversion
MVI 0.05 SI
Figure 3: EIS Holes E39/2134
ASX:WMG
www.westernmines.com.au
5
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
MASSIVE SULPHIDE REVIEW AND BASAL PROSPECTIVITY
Diamond drilling at Mulga Tank has demonstrated the extensive presence of intercumulus sulphide blebs
(predominantly pentlandite), localised at the interstices between former olivine crystals. This texture is
considered evidence of cotectic olivine-sulphide precipitation and characteristic of Type 2 disseminated nickel
sulphide systems, exemplified by the Mount Keith deposit. Drilling has also encountered intersections of thin
(<20cm) high-tenor massive sulphide veins and immiscible sulphide globules. The presence of this type of
mineralisation, in addition to intercumulus sulphide, is evidence that Mulga Tank represents a so-called Hybrid
system, in which both cotectic precipitation and gravity settling of sulphides has occurred. This markedly
increases the prospectivity of the system, allowing for possible significant basal accumulations of massive and
matrix sulphide.
WMG has recently completed a review of all the occurrences of high-grade massive sulphide observed in drilling
to date, classifying them as either structurally remobilised vein-fill type (Figure 4) or as globular “sulphidic melt
pockets” (Figure 5). These occur throughout the Mulga Tank Complex, in nearly every hole, as highlighted in
previously announced spot pXRF results:
HoleID
Depth Point (m)
Ni (%)
Co (ppm)
Cu (ppm)
Type
291
8.86
2599
636
Sulphidic Melt Pocket
386.15
26.1
6460
5818
Structural
153.79
17.9
2432
276
Structural
364.65
1.97
972
4462
Structural
MTD014A
296.25
11.5
1130
-
Structural
MTD016
282.08
44.2
299.3
73715
Structural
217.6
19.3
6793
7478
Structural
262.45
9.37
3505
5100
Structural
370.8
37.5
8909
17198
Structural
402.75
3.59
1784
874
Structural
526.55
57.0
10553
7369
Sulphidic Melt Pocket
559.65
9.81
3212
1777
Sulphidic Melt Pocket
580.15
5.51
2145
479
Sulphidic Melt Pocket
403.25
6.81
2442
1834
Structural
892.4
8.19
2148
1350
Structural
MTD012
MTD013
MTD020
MTD022
MTD022W1
MTD023
MTD025
MTD026
ASX:WMG
931.9
3.06
1204
1275
Structural
1174.5
2.43
690
243
Sulphidic Melt Pocket
1212.6
7.88
2266
3842
Sulphidic Melt Pocket
1241.5
3.62
1018
708
Sulphidic Melt Pocket
1271.5
13.7
3511
8084
Sulphidic Melt Pocket
1288.9
3.28
923
1755
Sulphidic Melt Pocket
253.85
4.22
1239
752
Structural
271.6
15.0
2406
1320
Structural
396.2
18.3
4125
6498
Sulphidic Melt Pocket
528.2
2.17
1595
1771
Structural
543.2
6.06
1875
3767
Structural
683.8
4.17
1984
3829
Structural
1201.8
61.4
11179
21279
Sulphidic Melt Pocket
1205.4
65.6
11198
4798
Sulphidic Melt Pocket
1448.3
5.47
2300
3280
Structural
1452.3
6.34
1852
1526
Sulphidic Melt Pocket
www.westernmines.com.au
6
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
HoleID
MTD027
MTD028
MTD029
ASX:WMG
Depth Point (m)
Ni (%)
Co (ppm)
Cu (ppm)
Type
1454.8
16.9
6934
4429
Sulphidic Melt Pocket
86.9
6.25
2382
3727
Structural
189.8
6.79
2088
222
Structural
294.1
8.77
3265
23815
Structural
434.2
10.5
2956
586
Structural
471.1
2.30
728
2819
Structural
504.55
15.5
4315
1295
Structural
522.95
5.97
2570
215
Structural
634.6
2.35
391
782
Structural
652.8
3.03
1011
806
Magmatic
810.9
4.40
2293
747
Sulphidic Melt Pocket
853.25
37.0
21539
8559
Sulphidic Melt Pocket
859.55
6.53
1835
1589
Structural
861.9
3.96
1292
1132
Structural
911.45
5.48
1259
1195
Magmatic
935.15
2.22
1289
2929
Structural
951.45
3.80
1742
1031
Structural
992.3
2.38
896
1083
Structural
1022.2
2.21
1010
526
Magmatic
1046.7
9.58
3134
1042
Structural
1067.7
11.1
886
378
Structural
1138.6
2.96
1092
734
Sulphidic Melt Pocket
1162.1
3.13
1176
2823
Magmatic
1200.9
6.06
3035
24770
Structural
1215.3
7.91
2285
4549
Sulphidic Melt Pocket
1237.3
3.75
1640
253
Structural
1255.65
9.50
4356
6089
Structural
1296.05
12.9
3485
3175
Structural
1367.3
32.3
1859
981
Structural
1465.3
17.0
10491
14576
Sulphidic Melt Pocket
137
2.73
870
104
Magmatic
482
4.34
702
1030
Magmatic
641
2.22
880
677
Magmatic
853.2
24.8
5408
1413
Sulphidic Melt Pocket
875.8
3.43
1295
961
Sulphidic Melt Pocket
880.7
2.91
544
295
Structural
897.6
14.1
1428
2353
Sulphidic Melt Pocket
915.05
6.23
2044
1311
Sulphidic Melt Pocket
924.6
4.08
1183
2173
Sulphidic Melt Pocket
944.05
9.03
1767
1396
Sulphidic Melt Pocket
164.2
2.82
1284
975
Structural
346.7
3.35
941
796
Structural
395.4
42.2
8597
7039
Structural
514.2
2.69
2180
1054
Magmatic
676.6
2.45
1615
1034
Magmatic
688.1
2.16
1291
947
Magmatic
697.6
9.15
3205
4091
Structural
733.15
2.22
1118
229
Structural
886.4
2.93
1519
428
Structural
898.35
3.91
1065
655
Structural
951.6
5.07
2498
481
Structural
www.westernmines.com.au
7
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
HoleID
Depth Point (m)
Ni (%)
Co (ppm)
Cu (ppm)
Type
971.4
36.5
5805
3831
Structural
986.6
4.28
1793
2429
Structural
988.3
10.1
2685
1791
Structural
1372.1
7.09
2612
3668
Structural
1487.95
11.9
3631
391
Sulphidic Melt Pocket
1599.9
57.3
16828
17478
Sulphidic Melt Pocket
1601.1
7.42
2117
1545
Sulphidic Melt Pocket
1608
2.92
1041
1070
Sulphidic Melt Pocket
1646.1
2.35
1010
358
Structural
Tabel 1: Previously reported sport pXRF for massive sulphide occurrences in WMG diamond drilling
Figure 4: Example of structural vein sulphide hole MTD027
Figure 5: Example of sulphide melt pockets hole MTD029 (EIS3)
ASX:WMG
www.westernmines.com.au
8
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
Whilst structural remobilisation of massive sulphide is well documented (e.g. P. Duuring, 2025), with sulphide
thought to travel up to ~500m along fractures and veins; the genesis of the sulphide melt pockets is less certain.
It is proposed that these could be entrained sulphide globules, remobilised by subsequent surges of magma
after massive sulphide accumulation (e.g. W.D. Maier et al., 2001).
Sulphidic melt pockets?
Figure 6: Entrained sulphide globules from Maier et al., 2001
The sulphidic melt pockets generally occur within the bottom ~200m, just above the basal contact of the
Complex. Given the tiny volume of rock pierced by the diamond drilling within a ~5km2 area of cumulate
ultramafic, it is truely remarkable how frequently these approximately tennis ball size globules have been
intersected. They are present in just about every drill hole which points to a very active and prospective zone.
Evidence for the extent of this mineralised zone, and for different phases or surges of magma emplacement, has
been emerging in the geochemical signatures seen across the Complex, as seen in the recent results for deep
diamond hole MTD029 (EIS3) (ASX, Over 1,200m of Sulphide Mineralisation in MTD029 (EIS3), 19 February
2025). Within the ~800m lower dunite assemblage, below the dolerite marker unit, a broad geochemical
signature seems to correlate across holes MTD027, MTD028 and MTD029 (EIS3) over ~2km, with three
mineralised zones interspersed with two zones of apparently unmineralised dunite, perhaps representing
differing pulses of fresher, un-sulphur saturated parental magma.
ASX:WMG
www.westernmines.com.au
9
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
Figure 7: Geochemical results showing Cu, PGE and S for holes MTD028, MTD029 (EIS3) and MTD027
These observations have galvanised the Company’s belief in finding basal accumulations of massive sulphide,
similar to Perseverance. Systematic drilling and exploration of the basal contact in combination with DHEM is
warranted.
Attention is drawn back to the western margin of the Complex, where the basal contact presents at shallower
depths and results from the bottom of hole MTD028 show multiple sulphide pockets and a possible “cloud
sulphide” intersection returning:
MTD028
140m at 0.49% Ni, 161ppm Co, 92ppm Cu, 61ppb Pt+Pd from 874m
inc. 82m at 0.55% Ni, 173ppm Co, 114ppm Cu, 74ppb Pt+Pd from 886m
ASX:WMG
www.westernmines.com.au
10
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
The Company plans to re-enter and diamond tail the western most fence of RC drilling (holes MTRC001,
MTRC010 and MTRC011). Having spent a bit more effort in how we drilled and set-up all the RC collars at the
project, within the sand cover, we can now re-use all these holes to efficiently test deeper targets saving ~300m
of diamond drilling.
Figure 8: Diamond tails on Western Margin
E39/2134 EIS DIAMOND DRILLING
The Company was successful in its EIS Deep Drilling application in Round 31 of the Co-funded Exploration
Drilling Program for a further deep diamond hole within tenement E39/2132 (ASX, WMG Wins Two EIS Awards
Totalling $440,000 for Mulga Tank, 28 April 2025). This application was similar to the Company’s EIS award in
previous Round 29 of the EIS program that went undrilled (ASX, WMG Wins Two More EIS Awards to Drill Mulga
Tank, 29 April 2024).
The application proposed an EIS hole that will look to test the basal contact of the Complex and target the
eastern portion of a conductive MobileMT anomaly that was “grazed” by hole MTD027 (Figure 4). MTD027
returned 96m at 0.40% Ni, 0.016% Co from 1,208m, including 38m at 0.56% Ni, 0.016% Co from 1,262m,
with 8m at 1.11% Ni, 0.018% Co from 1,270m, at the corresponding depth of the anomaly. Similar to hole
MTD028, these results in heavily disseminated sulphide mineralisation may represent Perseverance-style “cloud”
sulphide, close to a basal massive sulphide accumulation.
ASX:WMG
www.westernmines.com.au
11
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
The Company may elect to move the EIS hole and instead diamond tail hole MTRC009 closer to hole MTD029
(EIS3) in the centre of the Complex. MTRC009 was drilled to 522m saving significant diamond drilling. The
design and planning is ongoing and a final decision has not been made.
W
MTD029 (EIS3)
EIS8
E
MTD027
400mRL
MTD027
96m at 0.40% Ni from 1208m
inc. 38m at 0.56% Ni from 1262m
inc. 8m at 1.11% Ni from 1270m
-1000mRL
Figure 9: Stacked depth slices of MobileMT conductivity showing drill traces of MTD029 (EIS3), EIS8
and MTD027 and outline dunite shell of the Mulga Tank Complex
The Company is pleased to present this next phase of exploration drilling. The holes may not be drilled in the
order presented and may change as the program progresses. The Company looks forward to updating
shareholders on these exciting exploration plans and the continuing progress at Mulga Tank as results are
received.
For further information please contact:
Dr Caedmon Marriott
Managing Director
Tel: +61 475 116 798
Email: contact@westernmines.com.au
This announcement has been authorised for release to the ASX by Dr Caedmon Marriott, Managing Director
ASX:WMG
www.westernmines.com.au
12
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
Figure 10: Phase 4 Drilling Plans
APPENDIX
All results mentioned above have been reported in previous announcements:
Two Zones of Visible Nickel Sulphide in Hole MTD012, 4 May 2022
Multiple Zones of Visible Nickel Sulphide in Hole MTD013, 16 May 2022
Completion of Hole MTD014A - Planned Follow-up Hole MTP022, 26 May 2022
Mulga Tank Drilling Update, 23 June 2022
Disseminated Sulphides seen over 300m in Hole MTD020, 26 July 2022
Nickel Sulphide Minéralisation Seen in Hole MTD022, 14 December 2022
MTD023 - Extensive Mineralised System at Mulga Tank, 20 February 2023
Completion of EIS Hole MTD023, 6 March 2023
MTD025 Extends Nickel Mineralisation, 17 April 2023
Completion of Hole MTD026 and Upcoming MobileMT Survey, 27 June 2023
MTD027 Expands Mineralisation 4km Across Mulga Tank, 28 August 2023
MTD028 Further Nickel Sulphides at Mulga Tank, 2 October 2023
MTD028 Disseminated Nickel Sulphide 140m at 0.49% Ni, 31 October 2023
High-Grade Sulphide Segregations at Depth in MTD029 (EIS3), 29 May 2024
MTRC046 Two High-Grade Zones inc. 5m at 1.92% Ni 0.21% Cu, 17 September 2024
Further High-Grade Intervals up to 2.46% Ni 0.43% Cu, 9 October 2024
Further Phase 3 Assay Results up to 1.25% Ni 0.60% Cu, 17 October 2024
Assay and Petrology Confirm Fertile Komatiite System, 3 December 2024
Papers referenced:
Deformed Ni-Cu-(PGE) Deposits: Structures, Remobilization, and Exploration Implications, GSWA Report 253, P. Duuring,
2025
Why are there no Major Ni-Cu Sulfide Deposits in Large Layered Mafic-Ultramafic Intrusions? The Canadian Mineralogist Vol.
39 pp 547-556, W.D Maier et al., 2001
ASX:WMG
www.westernmines.com.au
13
ASX RELEASE | EXPLORATION DRILLING TO RECOMMENCE AT MULGA TANK
ABOUT WMG
Western Mines Group Ltd
Western Mines Group Ltd (ASX:WMG) is a mineral exploration company driven by the goal
ACN 640 738 834
Level 3, 33 Ord Street
West Perth
WA 6005
to create significant investment returns for our shareholders through exploration and
Board
Rex Turkington
Non-Executive Chairman
major ultramafic complex found on the under-explored Minigwal Greenstone Belt (100%
Dr Caedmon Marriott
Managing Director
Francesco Cannavo
Non-Executive Director
Dr Benjamin Grguric
Technical Director
Capital Structure
Shares: 96.79m
Options: 26.47m
Share Price: $0.14
Market Cap: $13.55m
Cash (30/06/25): $1.56m
Follow us
@westernmines
Western Mines Group
discovery of high-value gold and nickel sulphide deposits across a portfolio of highlyprospective projects located on major mineral belts of Western Australia.
Our flagship project and current primary focus is the Mulga Tank Ni-Co-Cu-PGE Project, a
WMG). WMG’s exploration work has discovered a significant nickel sulphide mineral system
and is considered highly prospective for globally significant Ni-Co-Cu-PGE deposits. An
Mineral Resource Estimate of over 5.3Mt of contained nickel was announced in April 2025,
making Mulga Tank the largest nickel sulphide deposit in Australia.
The Company’s primary gold project is Jasper Hill, where WMG has strategically
consolidated a 3km mineralised gold trend with walk-up drill targets. WMG has a diversified
portfolio of other projects including Melita (Au, Cu-Pb-Zn), midway between Kookynie and
Leonora in the heart of the WA Goldfields; Youanmi (Au) and Pinyalling (Au, Cu, Li).
COMPETENT PERSONS STATEMENT
The information in this announcement that relates to Exploration Results and other technical
information complies with the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and has been
compiled and assessed under the supervision of Dr Caedmon Marriott, Managing Director
of Western Mines Group Ltd. Caedmon is a Member of the Australian Institute of
Geoscientists and a Member of the Society of Economic Geologists. He has sufficient
experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the JORC Code. Caedmon consents to the inclusion in this
announcement of the matters based on his information in the form and context in which it
appears.
DISCLAIMER
Some of the statements appearing in this announcement may be in the nature of forward looking statements. You should be
aware that such statements are only predictions and are subject to inherent risks and uncertainties. Those risks and
uncertainties include factors and risks specific to the industries in which WMG operates and proposes to operate as well as
general economic conditions, prevailing exchange rates and interest rates and conditions in the financial markets, among
other things. Actual events or results may differ materially from the events or results expressed or implied in any forward
looking statement. No forward looking statement is a guarantee or representation as to future performance or any other
future matters, which will be influenced by a number of factors and subject to various uncertainties and contingencies, many
of which will be outside WMG’s control.
WMG does not undertake any obligation to update publicly or release any revisions to these forward looking statements to
reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events. No representation or
warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions
or conclusions contained in this announcement. To the maximum extent permitted by law, none of WMG, its Directors,
employees, advisors or agents, nor any other person, accepts any liability for any loss arising from the use of the information
contained in this announcement. You are cautioned not to place undue reliance on any forward looking statement. The
forward looking statements in this announcement reflect views held only as at the date of this announcement.
ASX:WMG
www.westernmines.com.au
14
Share your feedback
Discover