Presentation to IMARC Sydney - October 2024
Released
Released
Announcement PDF
WESTERN MINES GROUP
THE MULGA TANK NICKEL SULPHIDE DISCOVERY
INTERNATIONAL MINING AND RESOURCES CONFERENCE
SYDNEY
29 TO 31 OCTOBER 2024
@westernmines
Western Mines Group
ASX: WMG
www.westernmines.com.au
DISCLAIMER
NATURE OF THIS DOCUMENT
This presentation has been prepared by Western Mines Group Ltd ACN 640 738 834 (Company). The information is based on publicly available information, internally developed data and other sources. By receiving this presentation, you acknowledge and represent to the
Company that you have read, understood and accepted the terms of this disclaimer.
It is the responsibility of all recipients of this presentation to obtain all necessary approvals to receive this presentation and receipt of this presentation will be taken by the Company to constitute a representation and warranty that all relevant approvals have been obtained.
This presentation is a visual aid and is not intended to be read as a stand-alone document. The material contains selected and abbreviated summary information about the Company and its activities current as at the date of this presentation. The material is of general background
and does not purport to be complete. The Company is not responsible for providing updated information and assumes no responsibility to do so.
NOT AN OFFER
This presentation is for information purposes only and does not purport to be all inclusive or to contain all information about the Company or any of the assets, current or future, of the Company. This presentation does not comprise a prospectus, product disclosure statement or
other offering document under Australian law (and will not be lodged with ASIC) or any other law.
This presentation also does not constitute or form part of any invitation, offer for sale or subscription or any solicitation for any offer to buy or subscribe for any securities in any jurisdiction nor shall they or any part of them form the basis of or be relied upon in connection therewith
or act as any inducement to enter into any contract or commitment with respect to securities.
This presentation does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States. This presentation and its contents must not be distributed, transmitted or viewed by any person in the United States or any jurisdiction where the
distribution, transmission or viewing of this document would be unlawful under the securities or other laws of that or any other jurisdiction.
NOT INVESTMENT ADVICE
To the maximum extend permitted by law, the information contained in this presentation is given without any liability whatsoever being accepted by the Company or any of its related bodies corporate or their respective directors, officers, partners, employees, advisors and agents.
This presentation is not investment or financial product advice (nor tax, accounting or legal advice) and its contents are not intended to be used for the basis of making an investment decision. No representation or warranty, express or implied, is made as to the accuracy,
completeness or thoroughness of the information, whether as to the past or future.
Recipients of this presentation should carefully consider whether the company is an appropriate investment for them in light of their personal circumstances, including their financial and taxation position. This presentation does not take into account the individual investment
objectives, financial situation and particular needs of each recipient of this presentation. Therefore, recipients of this presentation may wish to seek independent financial and taxation advice before making any decision in respect of this presentation. Neither the Company nor any
of its related bodies corporate is licensed to provide financial product advice in respect of the Company’s securities or any other financial products.
FORWARD LOOKING STATEMENTS
Statements and material contained in this presentation, particularly those regarding possible or assumed future performance, production levels or rates, commodity prices, resources or potential growth of the Company, industry growth or other trend projects are, or may be,
forward looking statements. Such statements relate to future events and expectations and, as such, involve known and unknown risks and uncertainties and are based on the assumptions, estimates, analysis and opinions of management made in light of its experience and its
perception of trends, current conditions and expected developments, as well as other factors that management of the Company believes to be relevant.
Although management believes that the assumptions made by the Company and the expectations represented by such information are reasonable, there can be no assurance that the forward-looking information will prove to be accurate. Forward-looking information involves
known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking
information. Such factors include, among others, the actual market price of commodities, the actual results of current exploration, the actual results of future exploration, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the
Company's publicly filed documents. Readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
DISCLAIMER
No representation or warranty, express or implied, is made by the Company that the material contained in this presentation will be achieved or prove to be correct. Except for statutory liability which cannot be excluded, each of the Company, its directors, officers, employees,
advisers and agents expressly disclaims any responsibility for the accuracy, fairness, sufficiency or completeness of the material contained in this presentation, or any opinions or beliefs contained in this presentation, and excludes all liability whatsoever (including in negligence) for
any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error or omission there from. To the maximum extent permitted by the law, the Company disclaims any obligation to update or keep current the information
contained in this presentation or to correct any inaccuracy or omission which may become apparent, or to furnish any person with any further information. Any opinions expressed in the presentation are subject to change without notice.
COMPETENT PERSON STATEMENT
The information in this announcement that relates to exploration results and the Exploration Target for the Mulga Tank Project complies with the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves (JORC Code) and has been compiled and assessed under the supervision of Dr Caedmon Marriott, Managing Director of Western Mines Group Ltd. Caedmon is a member of the Australasian Institute of Mining and Metallurgy, the Australian Institute of
Geoscientists and the Society of Economic Geologists. Caedmon has sufficient experience that is relevant to the styles of mineralisation and type of deposits under consideration, and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Caedmon consents to the inclusion in this presentation of the matters based on his information in the form and context in which it appears.
MONETARY VALUES
Unless otherwise stated, all dollar values are in Australian Dollars (A$). The information in this presentation remains subject to change without notice.
ASX:WMG
Western Mines Group Company Presentation, October 2024
2
A NICKEL EXPLORATION COMPANY
WESTERN MINES GROUP COMPANY OVERVIEW
10x
• Exceptional flagship project – discovery of a major komatiite hosted nickel sulphide
mineral system under cover in WA
“An exploration driven company
looking to create value through
discovery”
• “Globally significant” – JORC Exploration Target 350Mt to 2,200Mt at 0.24-0.35% Ni
• Exploration team lead by WA nickel expert Dr Ben Grguric
• Nickel market at cyclical lows – significant discovery for the upswing
• Tight capital structure with ~$20m market cap
• Recent investment from Dundee Corporation – international mining fund
• Highly leveraged to ongoing exploration success
Western Mines Group Ltd
ASX:WMG
Shares Outstanding
Share Price (28/10/24)
Market Capitalisation
Cash (30/06/24)
Unlisted Options ($0.30 strike)
85,151,077
$0.22
$18.73 Million
$2.13 Million
19,596,670
Equentia Natural Resources
Directors and Management
Top 20 Shareholders
7.5%
9.9%
45.5%
SIGNIFICANT NEAR TERM NEWS FLOW | SMALL MARKET CAP | EXCITING RISK-REWARD
Cautionary Statement on JORC Exploration Target: The Exploration Target has been prepared and reported in accordance with the 2012 edition of the JORC Code. The potential quantity and grade of the Exploration Target is
conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
ASX:WMG
Western Mines Group Company Presentation, October 2024
3
MACRO: EXPLORING WITH CONFIDENCE THROUGH THE BOTTOM OF THE CYCLE
KEY TAKEAWAYS FROM THE INDONESIAN NICKEL CONFERENCE 2024
% of nickel production making cash at difference LME prices
100%
• Indonesia growing to ~75% global production but…
90%
80%
Ø A lot of RKEF-NPI is cash cost US$15,000/t
Price floor
• Nickel demand outlook remains strong at +9-10%/year with battery and stainless steel growth
% of industry
Ø Ore grades are falling all the time
70%
60%
50%
40%
30%
• Current Indonesian oversupply will work through then:
20%
10%
Ø Moratorium of further RKEF build?
Risk to upside
0%
-
Ø “ONEC” will manage supply and pricing?
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
20,000
22,000
24,000
26,000
28,000
30,000
LME price: $/tonne
Source: Macquarie Commodities Strategy June 2024
Ø Rising theme of ESG compliance and supply chain transparency will moderate future
growth
• CO2 production intensity, “Green Nickel” and price bifurcation:
Ø EU Battery Passport – nickel is ~36% of the CO2 budget of an EV
Strategic sulphide
Ø Australian sulphide producers are the lowest quartile in CO2 intensity
Ø Scenarios emerging for price bifurcation – at very least western sulphide assets
become strategic
WESTERN SULPHIDE DEPOSITS ABLE TO PRODUCE AT <$15,000/T WILL BECOME INCREASINGLY VALUABLE AND STRATEGIC ASSETS
ASX:WMG
Western Mines Group Company Presentation, October 2024
4
PROJECT: EXPLORING WITH CONFIDENCE THROUGH THE BOTTOM OF THE CYCLE
WORLD CLASS PROJECTS CAN TRASCEND ANY MACRO ENVIRONMENT
is globally significant exploration opportunity
• Large low-grade nickel sulphide will become an essential new supply of
Western sourced nickel – where else?
• Economies of scale are king – understood in gold or copper porphyries but
seemingly not in nickel
• Canada Nickel (TSX-V:CNC) leading the way – Crawford DFS:
Ø 41Mtpa operation – unit mining cost US$1.96/t – 42% Ni recovery –
AISC US$3,395/t
Deposit
Contained Nickel (M&I)
Ni Grade
Producing
Company
Norilsk-Talnakh (Russia)
11.3Mt
0.75%
Yes
Nornickel
Dumont (Canada)
4.4Mt
0.27%
No
Magneto Investments
Jinchuan (China)
4.4Mt
1.39%
Yes
Jinchuan Group
Sotkamo (Finland)
3.9Mt
0.23%
Yes
Terrafame
Crawford (Canada)
3.5Mt
0.23%
No
Canada Nickel
GigaMetals
Turnagain (Canada)
3.2Mt
0.21%
No
Mt Keith/Yakabindie (Australia)
2.6Mt
0.58%
Yes
BHP
Decar (Canada)
2.4Mt
0.21%
No
FPX Nickel
Source: Canada Nickel Investor Presentation April 2023
Ø US$75m equity investment from Samsung, Anglo American and
Agnico Eagle
Ø ~US$900m indicative Government and debt support
Source: Crawford Nickel Sulphide Project NI 43-101 Technical Report and Feasibility Study 2024
• “…what about Nickel West?” – limited public information:
Ø 2007 Mt Keith (223Mt at 0.53% Ni) was operating at >5:1 strip ratio
Ø Only 11.5Mtpa concentrator processing capacity
Source: BHP, Media Tour to Nickel West, Mount Keith Operations (MKO), 20 September 2007
LARGE LOW-GRADE NICKEL SULPHIDE CAN BE POSSIBLE IN WA
Western Mines Group Company Presentation, October 2024
PROJECT REQUIREMENTS
• Minimum 30Mtpa operation
• >40year minelife
• >0.25% Ni orebody
• >40% Ni recovery
• <2:1 strip ratio
• <A$4.00/t unit mining cost
A SIGNIFICANT 18 MONTHS FOR THE COMPANY
A MAJOR NICKEL DISCOVERY AGAINST TOUGH MARKET HEADWINDS
$1 .0 0
WMG Share Price
$0 .8 0
Nickel Price
$0 .7 0
1/10 /2 4
1/09 /2 4
1/08 /2 4
1/07 /2 4
1/06 /2 4
1/05 /2 4
1/04 /2 4
1/03 /2 4
1/02 /2 4
1/01 /2 4
1/12 /2 3
1/11 /2 3
1/10 /2 3
1/09 /2 3
1/08 /2 3
1/07 /2 3
1/06 /2 3
1/05 /2 3
1/04 /2 3
$15,000
$0 .0 0
1/03 /2 3
$25,000
$0 .6 0
$20,000
$0 .3 0
OCTOBER 2024
Further Phase 3 Assay Results up to 1.25% Ni 0.60% Cu
Further High-Grade Intervals up to 2.46% Ni 0.43% Cu
Regional EIS Drilling Confirms Belt-Scale Mineral System
SEPTEMBER 2024
Phase 3 Assays Extend Known Mineralisation at Mulga
Tank
MTRC046 Two High-Grade Zones inc. 5m at 1.92% Ni
0.21% Cu
Phase 3 RC Results Yield Broad Sulphide Mineralisation
First 19 Phase 3 RC Holes Complete at Mulga Tank
JULY 2024
Continuous Mineralisation in Upper Part of MTD029 (EIS3)
MAY 2024
High-Grade Sulphide Segregations at Depth in MTD029
(EIS3)
All Phase 2 RC Holes Show Broad Sulphide Mineralisation
APRIL 2024
MTD029 (EIS3) Diamond Drilling Update
MTRC038 Assay Results up to 3.16% Ni and 1.20% Cu
MTRC032 Assays Matrix Sulphide 6m at 1.01% Ni 0.32%
Cu
MARCH 2024
Further RC Results with 200m Zones of Mineralisation
MTRC024 Assays – Matrix-Massive Sulphide Over 4.5% Ni
FEBRUARY 2024
Semi-Massive Sulphide in Mulga Tank Phase 2 RC Holes
MULGA TANK JORC EXPLORATION TARGET
JANUARY 2024
2024 Exploration Programs Commence at Mulga Tank
More RC Intersections over 1% Ni at Mulga Tank
MARCH 2023
Completion of EIS Hole MTD023
APRIL 2023
MTD026 Update and Expansion of Mulga Tank Drilling
Aqua Regia Testwork Confirms Nickel Sulphide Association
MTD023 Assays Confirm Discovery of Significant Nickel
System
JUNE 2023
Completion of Hole MTD026 and Upcoming MobileMT
Survey
MTD026 Mulga Tank Drilling Update
AUGUST 2023
Aqua Regia Testwork Confirms Nickel Sulphide
MTD026 Assays 840m of Nickel Sulphide Mineralisation
MTD027 Expands Mineralisation 4km Across Mulga
Tank
SEPTEMBER 2023
RC Drilling Program Commences at Mulga Tank
Mulga Tank Mineralogy Highlights Carbon Capture
PotentialMTD026
OCTOBER 2023
MTD028 Disseminated Nickel Sulphide 140m at 0.49%
Ni
MTD027 Best Assays Yet at Mulga Tank
MTD028 Further Nickel Sulphides at Mulga Tank
NOVEMBER 2023
MTRC009 Assays Confirm 367m of Nickel Mineralisation
First RC Assays Show Broad Zones of Mineralisation
Completion of 7,000m RC Drilling Program at Mulga Tank
DECEMBER 2023
MTRC018 Assays Confirm Massive Sulphide 1.8% Ni,
4.9% Cu
MTRC015 Assays Reveal Multiple Intersections Over 1% Ni
6
Western Mines Group Company Presentation, October 2024
ASX:WMG
$30,000
$0 .9 0
$0 .5 0
$0 .4 0
$0 .2 0
$0 .1 0
FRONTIER EXPLORATION IN A WORLD CLASS NICKEL PROVINCE
YILGARN CRATON WESTERN AUSTRALIA
• One of the world’s major nickel provinces
• World-class examples of komatiite-hosted nickel deposits – Perseverance (50Mt @ 2.3% Ni), Mt
Keith (643.7Mt @ 0.58% Ni) and Kambalda (35Mt @ 3.1% Ni)
MULGA TANK Ni-Co-Cu-PGE PROJECT
• New search space – frontier exploration for major komatiite-hosted Ni-Co-Cu-PGE deposits
under cover
• Strategically assembled 425km2 position on the under-explored Minigwal Greenstone Belt
• Mulga Tank Ultramafic Complex (WMG 100%) is a "camp scale" project
EXPLORATION MODELS ARE PERSEVERANCE AND MT KEITH
Model
PERSEVERANCE
MT KEITH
Type
Type 1 Stratiform Basal Massive Sulphide
Type 2 Interstitial Disseminated Sulphide
Size
650m x 160m
1,900m x 400m
ASX:WMG
Western Mines Group Company Presentation, October 2024
7
BELT SCALE OPPORTUNITY WMG OWN 100%
MAJOR KOMATIITE NICKEL SYSTEM UNDER COVER
• Discovered by BHP in 1985, hole MD1A = dunite with visible nickel sulphides – not IOCG target
• Large adcumulate dunite body (~15km2) with interpreted komatiite channel flows extending NW
over >12km
• Drilling beneath sand cover – only 12 holes prior to WMG, 10 with nickel sulphide mineralisation
• WMG has drilled 81 holes (18 diamond, 63 RC) totalling 33,417m in 2.5 years – 71 holes
intersected nickel sulphide mineralisation
• All three mineralisation styles present – Mt Keith, Perseverance and Kambalda
CLEAR EVIDENCE OF AN EXTREMELY LARGE-SCALE SULPHIDE MINERAL SYSTEM
ASX:WMG
Western Mines Group Company Presentation, October 2024
8
DISCOVERY OF EXTENSIVE MT KEITH-STYLE MAGMATIC SULPHIDE
DISSEMINATED SULPHIDES OVER >500M INTERVALS
• Deep diamond EIS holes MTD023 and MTD026 intersected extensive disseminated
magmatic sulphides
• MTD023: Cumulative 693.5m at 0.28% Ni, 128ppm Co, 61ppm Cu, 27ppb Pt+Pd with S:Ni 1.1
• MTD026: Cumulative 840m at 0.28% Ni, 140ppm Co, 103ppm Cu, 24ppb Pt+Pd with S:Ni 1.6
• MTD027: Cumulative 694m at 0.31% Ni, 141ppm Co, 68ppm Cu, 30ppb Pt+Pd with S:Ni 1.0
• MTD028: Cumulative 466m at 0.35% Ni, 139ppm Co, 62ppm Cu, 43ppb Pt+Pd with S:Ni 1.0
WITH EXAMPLES OF SHALLOW MINERALISED INTERVALS:
• MTD022: 114m at 0.31% Ni, 121ppm Co, 33ppm Cu from 124m
inc. 14m at 0.48% Ni, 171ppm Co, 152ppm Cu from 168m
• MTD026: 130m at 0.31% Ni, 136ppm Co, 122ppm Cu from 116m
inc. 13m at 0.35% Ni, 142ppm Co, 301ppm Cu from 157m
• Mineralogical work confirms abundant coarse grained pentlandite
ASX:WMG
Western Mines Group Company Presentation, October 2024
9
GLOBALLY SIGNIFICANT NICKEL SULPHIDE SYSTEM
BRAVE LITTLE COMPANY DRILLING 1,500M DIAMOND HOLES
ASX:WMG
Western Mines Group Company Presentation, October 2024
10
PHASE 1 RC PROGRAM CONFIRMED SHALLOW MINERALISATION
FIRST SYSTEMATIC EXPLORATION OF MULGA TANK
• Initial 22 hole, 7,035m RC program – 19 out of 22 holes mineralised
PHASE 1 RC RESULTS:
• MTRC001: Cumulative 253m at 0.24% Ni, 128ppm Co, 76ppm Cu, 27ppb Pt+Pd with S:Ni 1.4
• MTRC002: Cumulative 111m at 0.31% Ni, 136ppm Co, 69ppm Cu, 37ppb Pt+Pd with S:Ni 0.7
• MTRC003: Cumulative 175m at 0.26% Ni, 114ppm Co, 18ppm Cu, 19ppb Pt+Pd with S:Ni 0.6
• MTRC005: Cumulative 164m at 0.26% Ni, 134ppm Co, 114ppm Cu, 20ppb Pt+Pd with S:Ni 1.3
• MTRC006: Cumulative 159m at 0.29% Ni, 125ppm Co, 29ppm Cu, 12ppb Pt+Pd with S:Ni 0.6
• MTRC007: Cumulative 168m at 0.29% Ni, 133ppm Co, 50ppm Cu, 16ppb Pt+Pd with S:Ni 1.0
• MTRC008: Cumulative 91m at 0.24% Ni, 122ppm Co, 53ppm Cu, 15ppb Pt+Pd with S:Ni 1.1
• MTRC009: Cumulative 367m at 0.26% Ni, 133ppm Co, 74ppm Cu, 25ppb Pt+Pd with S:Ni 1.3
• MTRC010: Cumulative 106m at 0.25% Ni, 119ppm Co, 25ppm Cu, 15ppb Pt+Pd with S:Ni 1.0
• MTRC011: Cumulative 110m at 0.24% Ni, 128ppm Co, 75ppm Cu, 26ppb Pt+Pd with S:Ni 1.9
• MTRC012: Cumulative 190m at 0.22% Ni, 124ppm Co, 68ppm Cu, 21ppb Pt+Pd with S:Ni 1.8
• MTRC013: Cumulative 149m at 0.29% Ni, 131ppm Co, 42ppm Cu, 30ppb Pt+Pd with S:Ni 1.0
• MTRC014: Cumulative 158m at 0.26% Ni, 121ppm Co, 37ppm Cu, 20ppb Pt+Pd with S:Ni 0.5
• MTRC015: Cumulative 129m at 0.34% Ni, 156ppm Co, 164ppm Cu, 25ppb Pt+Pd with S:Ni 1.3
• MTRC016: 200m at 0.30% Ni, 139ppm Co, 92ppm Cu, 25ppb Pt+Pd from 103m with S:Ni 1.2
• MTRC017: Cumulative 183m at 0.26% Ni, 132ppm Co, 165ppm Cu, 16ppb Pt+Pd with S:Ni 1.6
• MTRC018: Cumulative 209m at 0.28% Ni, 129ppm Co, 381ppm Cu, 18ppb Pt+Pd with S:Ni 1.3
• MTRC019: 186m at 0.28% Ni, 135ppm Co, 78ppm Cu, 22ppb Pt+Pd from 90m with S:Ni 0.9
• MTRC020: Cumulative 220m at 0.28% Ni, 132ppm Co, 112ppm Cu, 18ppb Pt+Pd with S:Ni 1.1
ASX:WMG
Western Mines Group Company Presentation, October 2024
11
IMPLICIT MODELLING OF Ni, S AND CHALCOPHILE ELEMENTS
JORC EXPLORATION TARGET 350Mt to 2,200Mt at 0.24% to 0.35% Ni, 120ppm to 150ppm Co, S:Ni 1.1 to 1.3
Higher-grade core
W
(2,800ppm Ni, 1,000ppm S cut-off)
E
Large lower-grade
(1,500ppm Ni, 1,000ppm S cut-off)
Dunite shell
Cautionary Statement on JORC Exploration Target: The Exploration Target has been prepared and reported in accordance with the 2012 edition of the JORC Code. The potential quantity and grade of the Exploration Target is
conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
ASX:WMG
Western Mines Group Company Presentation, October 2024
12
PHASE 2 RC FOCUSED ON THE HIGHER-GRADE CORE
MULTIPLE +200M INTERVALS AND HIGHER GRADES EMERGING
• 17 hole 5,534m RC completed February-March 2024 – all 17 holes mineralised
• Drill hole spacing reduced to ~200m x 200m over 1km2 area
PHASE 2 RC RESULTS:
• MTRC023: Cumulative 115m at 0.28% Ni, 133ppm Co, 51ppm Cu, 27ppb Pt+Pd with S:Ni 0.9
• MTRC024: 199m at 0.31% Ni, 148ppm Co, 76ppm Cu, 23ppb Pt+Pd from 161m with S:Ni 1.1
• MTRC025: Cumulative 239m at 0.28% Ni, 139ppm Co, 72ppm Cu, 19ppb Pt+Pd with S:Ni 1.2
• MTRC026: 226m at 0.28% Ni, 125ppm Co, 62ppm Cu, 15ppb Pt+Pd from 86m with S:Ni 0.7
• MTRC027: Cumulative 193m at 0.26% Ni, 124ppm Co, 78ppm Cu, 22ppb Pt+Pd with S:Ni 1.0
• MTRC028: Cumulative 152m at 0.30% Ni, 134ppm Co, 109ppm Cu, 20ppb Pt+Pd with S:Ni 0.9
• MTRC029: Cumulative 138m at 0.25% Ni, 113ppm Co, 32ppm Cu, 6ppb Pt+Pd with S:Ni 0.6
• MTRC030: Cumulative 179m at 0.28% Ni, 126ppm Co, 41ppm Cu, 10ppb Pt+Pd with S:Ni 0.7
• MTRC031: 210m at 0.28% Ni, 137ppm Co, 104ppm Cu, 24ppb Pt+Pd from 87m with S:Ni 1.2
• MTRC032: 198m at 0.28% Ni, 145ppm Co, 249ppm Cu, 28ppb Pt+Pd from 108m with S:Ni 1.6
• MTRC033: Cumulative 184m at 0.27% Ni, 126ppm Co, 82ppm Cu, 18ppb Pt+Pd with S:Ni 0.9
• MTRC034: 240m at 0.30% Ni, 133ppm Co, 133ppm Cu, 36ppb Pt+Pd from 90m with S:Ni 1.0
• MTRC035: 220m at 0.28% Ni, 124ppm Co, 63ppm Cu, 25ppb Pt+Pd from 82m with S:Ni 0.7
• MTRC036: 182m at 0.27% Ni, 134ppm Co, 66ppm Cu, 27ppb Pt+Pd from 102m with S:Ni 1.0
• MTRC037: 224m at 0.29% Ni, 139ppm Co, 208ppm Cu, 25ppb Pt+Pd from 91m with S:Ni 1.0
• MTRC038: 199m at 0.31% Ni, 139ppm Co, 260ppm Cu, 27ppb Pt+Pd from 119m with S:Ni 1.3
• MTRC039: Cumulative 165m at 0.28% Ni, 125ppm Co, 73ppm Cu, 15ppb Pt+Pd with S:Ni 0.7
ASX:WMG
Western Mines Group Company Presentation, October 2024
13
WITH PHASE 3 RC THE SYSTEM IS GETTING BIGGER AND BETTER
EXTENDING MINERALISATION TO SOUTH AND EAST
• 19 hole 6,002m RC completed July-September 2024 – all 19 holes mineralised
• Infill around MTRC016, MTRC034 and follow-up on shallow high-grade results in
MTRC032 and MTRC038
PHASE 3 RC RESULTS:
• MTRC040: Cumulative 298m at 0.29% Ni, 131ppm Co, 65ppm Cu, 16ppb Pt+Pd with S:Ni 1.1
• MTRC041: Cumulative 254m at 0.27% Ni, 133ppm Co, 82ppm Cu, 20ppb Pt+Pd with S:Ni 1.3
• MTRC042: Cumulative 238m at 0.29% Ni, 133ppm Co, 96ppm Cu, 24ppb Pt+Pd with S:Ni 1.1
• MTRC043: 249m at 0.28% Ni, 129ppm Co, 62ppm Cu, 14ppb Pt+Pd from 111m with S:Ni 0.8
• MTRC044: Cumulative 187m at 0.28% Ni, 121ppm Co, 34ppm Cu, 10ppb Pt+Pd with S:Ni 0.8
• MTRC045: Cumulative 174m at 0.28% Ni, 125ppm Co, 49ppm Cu, 14ppb Pt+Pd with S:Ni 0.7
• MTRC046: 193m at 0.33% Ni, 152ppm Co, 310ppm Cu, 25ppb Pt+Pd from 107 with S:Ni 1.5
• MTRC047: 188m at 0.28% Ni, 129ppm Co, 57ppm Cu, 23ppb Pt+Pd from 112m with S:Ni 1.1
• MTRC048: Cumulative 173m at 0.29% Ni, 131ppm Co, 36ppm Cu, 19ppb Pt+Pd with S:Ni 0.7
• MTRC049: Cumulative 170m at 0.26% Ni, 125ppm Co, 50ppm Cu, 11ppb Pt+Pd with S:Ni 1.0
• MTRC050: Cumulative 164m at 0.28% Ni, 127ppm Co, 58ppm Cu, 13ppb Pt+Pd with S:Ni 1.0
• MTRC051: Cumulative 156m at 0.27% Ni, 133ppm Co, 212ppm Cu, 17ppb Pt+Pd with S:Ni 1.4
• MTRC052: 192m at 0.28% Ni, 125ppm Co, 63ppm Cu, 11ppb Pt+Pd from 114m with S:Ni 0.8
• MTRC053: 205m at 0.28% Ni, 129ppm Co, 85ppm Cu, 16ppb Pt+Pd from 87m with S:Ni 1.0
• MTRC054: 200m at 0.28% Ni, 124ppm Co, 31ppm Cu, 10ppb Pt+Pd from 100m with S:Ni 0.6
• MTRC055: 216m at 0.30% Ni, 144ppm Co, 109ppm Cu, 20ppb Pt+Pd from 84m with S:Ni 1.2
• MTRC056: 201m at 0.31% Ni, 134ppm Co, 176ppm Cu, 15ppb Pt+Pd from 81m with S:Ni 0.9
• MTRC057 216m at 0.27% Ni, 139ppm Co, 159ppm Cu, 13ppb Pt+Pd from 84m with S:Ni 1.1
• MTRC058 209m at 0.29% Ni, 132ppm Co, 50ppm Cu, 18ppb Pt+Pd from 91m with S:Ni 0.8
ASX:WMG
Western Mines Group Company Presentation, October 2024
14
ITS NOT MT KEITH – ITS A PERSEVERANCE-STYLE HYBRID SYSTEM
HIGH-GRADE COMPONENT TO MINERALISATION
• Processes working to coalesce sulphides and form massive sulphide deposits
• Multiple zones of remobilised massive nickel sulphide veinlets, in-situ immiscible
globules and sulphide segregations seen in diamond core across the Complex
• MTD012:
0.5m at 1.49% Ni, 0.04% Cu and 0.04% Co from 385.8m
• MTD013:
1.6m at 0.83% Ni and 0.30g/t Pt+Pd from 304m
inc. 0.4m at 1.34% Ni, 0.04% Co and 0.55g/t Pt+Pd from 304.4m
and 0.4m at 1.29% Ni and 0.43g/t Pt+Pd from 153.6m
• MTD022:
0.15m at 2.73% Ni, 0.08% Cu, 0.06% Co and 0.10g/t Pt+Pd from 525.15m
and 0.5m at 1.42% Ni, 0.05% Cu, 0.04% Co and 0.41g/t Pt+Pd from 553m
• MTD023:
1.5m at 1.88% Ni, 0.04% Cu, 0.07% Co from 402m
• MTD026:
0.5m at 1.21% Ni, 0.05% Co, 0.15% Cu, 0.1g/t Pt+Pd from 116.5m
and 0.3m at 1.88% Ni, 0.08% Co, 0.08% Cu, 0.2g/t Pt+Pd from 224.3m
• MTD027:
1.0m at 1.05% Ni, 0.03% Co, 0.01% Cu, 0.1g/t Pt+Pd from 504m
• Sulphide material migrates along faults and fractures – from where?
ASX:WMG
Western Mines Group Company Presentation, October 2024
15
SHALLOW HIGH-GRADE RESULTS IN RC DRILLING
SEMI-MASSIVE NICKEL-COPPER SULPHIDE IN RC
• Higher grade results in the central-eastern area of the Complex
• MTRC015: 1m at 1.11% Ni, 516ppm Co, 0.45% Cu, 62ppb Pt+Pd from 172m
3m at 1.32% Ni, 56ppm Co, 0.10% Cu, 34ppb Pt+Pd from 184m
2m at 1.71% Ni, 836ppm Co, 0.10% Cu, 0.4g/t Pt+Pd from 229m
• MTRC018: 1m at 1.84% Ni, 0.10% Co, 4.88% Cu, 26ppb Pt+Pd from 293m
• MTRC024: 3m at 2.19% Ni, 777ppm Co, 597ppm Cu, 9ppb Pt+Pd from 253m
inc. 1m at 4.51% Ni, 0.16% Co, 0.14% Cu, 16ppb Pt+Pd from 253m
• MTRC032: 1m at 1.08% Ni, 602pm Co, 379ppm Cu, 83ppb Pt+Pd from 131m
6m at 1.01% Ni, 443ppm Co, 0.32% Cu, 0.12g/t Pt+Pd from 254m
• MTRC038: 2m at 1.51% Ni, 539ppm Co, 0.72% Cu, 94ppb Pt+Pd from 135m
1m at 3.16% Ni, 662ppm Co, 385ppm Cu, 0.18g/t Pt+Pd from 192m
• MTRC046: 4m at 1.14% Ni, 501ppm Co, 803ppm Cu, 0.14g/t Pt+Pd from 224m
5m at 1.92% Ni, 711ppm Co, 0.21% Cu, 0.18g/t Pt+Pd from 283m
• MTRC055: 4m at 1.16% Ni, 345ppm Co, 0.13% Cu, 6ppb Pt+Pd from 182m
inc. 1m @ 2.46% Ni, 641ppm Co, 0.43% Cu, 18ppb Pt+Pd from 183m
ASX:WMG
Western Mines Group Company Presentation, October 2024
16
TRACKING DOWN ZONES OF HIGH-GRADE MINERALISATION
PODS OF HIGH-GRADE MATERIAL WITHIN A LARGE OPEN PIT
• Targeting areas of higher grade “starter pit” material >0.40% Ni to improve
economics of a large-scale project
• 23 intersections of high-grade intervals >1% Ni within shallow RC holes
• 9 high-grade clusters warrant follow-up infill drilling
• May not have even yet drilled the best areas of the Complex – further RC drilling in
south and southwestern quadrants required
WHAT LIES AT DEPTH WITHIN THIS EXTENSIVE SULPHIDE SYSTEM?
• Intersections of “cloud” sulphide potentially vectoring towards sulphide enriched keel
and/or feeder vent:
• MTD023:
88m at 0.44% Ni, 151ppm Co from 1,212m
• MTD027:
96m at 0.40% Ni, 161ppm Co from 1,208m
inc. 38m at 0.56% Ni, 159ppm Co from 1,262m
inc. 8m at 1.11% Ni, 181ppm Co from 1,270m
• MTD028:
140m at 0.49% Ni, 161ppm Co from 874m
inc. 82m at 0.55% Ni, 173ppm Co from 886m
• MobileMT survey – deep resistivity mapping highlights conductive target within
overall resistive dunite body
• Further $220,000 EIS grant to co-fund deep diamond hole targeting sulphide
enriched keel of the Complex
ASX:WMG
Western Mines Group Company Presentation, October 2024
17
AND COULD BE KAMBALDA – PROSPECTIVE UNEXPLORED KOMATIITE CHANNELS
FERTILE KOMATIITE CHANNELS EXTEND 15KM
• Komatiite sequence with A-B zones logged in the Panhandle
• Evidence of prospective high-grade mineralisation:
• MTD006:
0.25m at 3.8% Ni, 0.7% Cu and 0.7g/t PGE from 221.6m
• MTD016:
0.3m at 1.57% Ni, 0.13% Cu and 0.12g/t Pt+Pd from 281.9m
• 15km strike of interpreted channels completely unexplored – waiting grant E39/2299
• Completed belt-wide MobileMT survey – further geophysics planned
• Recently drilled first regional RC holes with aid of EIS grant – sulphides in komatiite observed
~5km from main body of Complex
CONFIRMED GEOLOGICAL INTERPRETATION AND BELT-SCALE MINERAL SYSTEM
ASX:WMG
Western Mines Group Company Presentation, October 2024
18
EXPLORATION STRATEGY BASED ON MINERALISATION STYLE
PATHWAYS TO SHAREHOLDER VALUE
1
MT KEITH-STYLE
EXTENDING DISSEMINATED
SULPHIDE MINERALISATION
Systematic RC - confirm lateral extent
of disseminated mineralisation
RESOURCE DRILL OUT
Initial Exploration Target estimate
Criteria: >2,000,000t [Ni], >0.25% Ni, top 200-300m
Sighter metallurgical test work
2
PERSEVERANCE-STYLE
TARGETING MASSIVE
SULPHIDE MINERALISATION
9 clusters of shallow high-grade
intersections >1% Ni
Targeted diamond drilling
TARGET PODS OF SHALLOW HIGH-GRADE MATERIAL AND AIM TO
DISCOVER SOURCE/S OF REMOBILISED MASSIVE SULPHIDE
DHEM surveys
3
KAMBALDA-STYLE
HIGH-GRADE CHANNEL
MINERALISATION
Grant of tenement E39/2299
Belt wide geophysics and targeting
FIRST BELT WIDE DRILLING OF KAMBALDA-STYLE
KOMATIITE CHANNELS >15KM
First exploration drilling
Company’s exploration plans subject to change without notice
ASX:WMG
Western Mines Group Company Presentation, October 2024
19
EXCITING DISCOVERY OPPORTUNITY
EXPLORATION PHILOSOPHY
• We believe multiple significant nickel deposits will be found at Mulga Tank
• We strive
Share your feedback
Discover