QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
HIGHLIGHTS
• Completion of 24 hole Phase 3 RC (7,413m) program at the Mulga Tank Ni-Co-Cu-PGE Project
• Phase 3 RC assay results received with all 19 holes showing broad zones of nickel sulphide
mineralisation including multiple holes with ~200m intersections within the top ~300m including:
MTRC046
193m at 0.33% Ni, 152ppm Co, 310ppm Cu, 25ppb Pt+Pd from 107m S:Ni 1.5*
MTRC055
216m at 0.30% Ni, 144ppm Co, 109ppm Cu, 20ppb Pt+Pd from 84m S:Ni 1.2*
MTRC056
201m at 0.31% Ni, 134ppm Co, 176ppm Cu, 15ppb Pt+Pd from 81m S:Ni 0.9
• Multiple zones of higher grade results including best intersection to date in MTRC046:
MTRC046
10m at 0.81% Ni, 352ppm Co, 0.28% Cu, 77ppb Pt+Pd from 224m
inc. 4m at 1.14% Ni, 501ppm Co, 803ppm Cu, 0.14g/t Pt+Pd from 224m
and inc. 5m at 0.61% Ni, 258ppm Co, 0.49% Cu, 32ppb Pt+Pd from 229m
7m at 1.52% Ni, 578ppm Co, 0.16% Cu, 0.17g/t Pt+Pd from 282m
inc. 5m at 1.92% Ni, 711ppm Co, 0.21% Cu, 0.18g/t Pt+Pd from 283m
MTRC048
5m at 0.40% Ni, 115ppm Co, 33ppm Cu, 1ppb Pt+Pd from 266m
7m at 0.40% Ni, 141ppm Co, 33ppm Cu, 0ppb Pt+Pd from 279m
6m at 0.57% Ni, 195ppm Co, 92ppm Cu, 2ppb Pt+Pd from 289m
inc. 1m at 1.20% Ni, 356ppm Co, 174ppm Cu, 0ppb Pt+Pd from 290m
MTRC051
3m at 0.70% Ni, 400ppm Co, 0.38% Cu, 0.17g/t Pt+Pd from 147m
inc. 1m at 1.18% Ni, 650ppm Co, 0.67% Cu, 0.31g/t Pt+Pd from 148m
MTRC055
11m at 0.63% Ni, 211ppm Co, 535ppm Cu, 4ppb Pt+Pd from 175m
inc. 4m at 1.16% Ni, 345ppm Co, 0.13% Cu, 6ppb Pt+Pd from 182m
that inc. 2m at 1.97% Ni, 542ppm Co, 0.26% Cu, 12ppb Pt+Pd from 183m
which inc. 1m at 2.46% Ni, 641ppm Co, 0.43% Cu, 18ppb Pt+Pd from 183m
7m at 0.48% Ni, 226ppm Co, 248ppm Cu, 42ppb Pt+Pd from 234m
inc. 1m at 1.26% Ni, 489ppm Co, 431ppm Cu, 49ppb Pt+Pd from 239m
MTRC056
27m at 0.45% Ni, 172ppm Co, 263ppm Cu, 51ppb Pt+Pd from 81m
inc. 1m at 1.25% Ni, 398ppm Co, 0.15% Cu, 0.33g/t Pt+Pd from 96m
MTRC057
1m at 0.88% Ni, 449ppm Co, 0.60% Cu, 71ppb Pt+Pd from 221m
• Running total of 55 of 58 RC holes mineralised across all three phases of RC drilling with 23
intersections >1% Ni discovered in top 300m within these holes over ~2.5km2 area
• WMG continues to expand and de-risk a potentially globally significant, large-scale, open-pitable
nickel sulphide deposit at Mulga Tank
Western Mines Group Ltd
Level 3, 33 Ord Street
West Perth WA 6005
ASX:WMG
Telephone: +61 475 116 798
Email: contact@westernmines.com.au
www.westernmines.com.au
Shares on Issue: 85.15m
Share Price: $0.22
Market Cap: $18.73m
Cash: $1.06m (30/09/24)
1
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
Western Mines Group Ltd (WMG or Company) (ASX:WMG) is pleased to provide shareholders with the following
Quarterly Activities Report, and accompanying Appendix 5B, for what has been another very successful quarter
for the Company. WMG’s focus for the period remained the flagship Mulga Tank Ni-Cu-PGE Project where
results continue to validate the discovery of a major nickel sulphide mineral system.
At the beginning of the quarter the Company announced the commencement of the Phase 3 reverse circulation
(RC) drilling program. This program was completed during the quarter (ASX, First 19 Phase 3 RC Holes
Complete at Mulga Tank, 2 September 2024) along with five additional regional holes (ASX, Regional EIS Drilling
Confirms Belt-Scale Mineral System, 3 October 2024). The program was successful in its goals of infilling
around previous drilling in the core of the Complex (holes MTRC040 to MTRC043) and extending mineralisation
outside of previous tested zones (holes MTRC044 to MTRC058); whilst the regional holes (MTRC059 to
MTRC063) validated the geological interpretation of the wider Mulga Tank Complex.
Final assay results have now been received for all 19 Phase 3 RC holes drilled within the main body of the Mulga
Tank Complex, with extensive intervals of nickel sulphide mineralisation observed in all of the holes (ASX, Phase
3 RC Results Yield Broad Sulphide Mineralisation Zones, 13 September 2024; MTRC046: Two High-Grade
Zones inc. 5m at 1.92% Ni 0.21% Cu, 17 September; Phase 3 Assays Extend Known Mineralisation at Mulga
Tank, 26 September 2024; Further High-Grade Intervals up to 2.46% Ni 0.43% Cu, 9 October 2024; Further
Phase 3 Assay Results up to 1.25% Ni 0.60% Cu, 17 October 2024). A number of the holes returned broad
intersections of mineralisation over continuous ~200m lengths including:
MTRC043
249m at 0.28% Ni, 129ppm Co, 62ppm Cu, 14ppb Pt+Pd from 111m S:Ni 0.8*
MTRC046
193m at 0.33% Ni, 152ppm Co, 310ppm Cu, 25ppb Pt+Pd from 107m S:Ni 1.5*
MTRC047
188m at 0.28% Ni, 129ppm Co, 57ppm Cu, 23ppb Pt+Pd from 112m S:Ni 1.1*
MTRC052
192m at 0.28% Ni, 125ppm Co, 63ppm Cu, 11ppb Pt+Pd from 114m S:Ni 0.8*
MTRC053
205m at 0.28% Ni, 129ppm Co, 85ppm Cu, 16ppb Pt+Pd from 87m S:Ni 1.0*
MTRC054
200m at 0.28% Ni, 124ppm Co, 31ppm Cu, 10ppb Pt+Pd from 100m S:Ni 0.6*
MTRC055
216m at 0.30% Ni, 144ppm Co, 109ppm Cu, 20ppb Pt+Pd from 84m S:Ni 1.2*
MTRC056
201m at 0.31% Ni, 134ppm Co, 176ppm Cu, 15ppb Pt+Pd from 81m S:Ni 0.9
MTRC057
216m at 0.27% Ni, 139ppm Co, 159ppm Cu, 13ppb Pt+Pd from 84m S:Ni 1.1*
MTRC058
209m at 0.29% Ni, 132ppm Co, 50ppm Cu, 18ppb Pt+Pd from 91m S:Ni 0.8*
* Ending in mineralisation
Further intersections of shallow higher grade results were encountered in a number of the holes, with results
from hole MTRC046 showing the best high-grade intersection ever drilled at the project. A total of 23
intersections >1% Ni have now been observed within the 58 RC holes to date. Relatively shallow higher grade
results from the Phase 3 program within the central core area of the Mulga Tank Complex include:
MTRC046
10m at 0.81% Ni, 352ppm Co, 0.28% Cu, 77ppb Pt+Pd from 224m
inc. 4m at 1.14% Ni, 501ppm Co, 803ppm Cu, 0.14g/t Pt+Pd from 224m
and inc. 5m at 0.61% Ni, 258ppm Co, 0.49% Cu, 32ppb Pt+Pd from 229m
7m at 1.52% Ni, 578ppm Co, 0.16% Cu, 0.17g/t Pt+Pd from 282m
inc. 5m at 1.92% Ni, 711ppm Co, 0.21% Cu, 0.18g/t Pt+Pd from 283m
ASX:WMG
www.westernmines.com.au
2
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
MTRC048
5m at 0.40% Ni, 115ppm Co, 33ppm Cu, 1ppb Pt+Pd from 266m
7m at 0.40% Ni, 141ppm Co, 33ppm Cu, 0ppb Pt+Pd from 279m
6m at 0.57% Ni, 195ppm Co, 92ppm Cu, 2ppb Pt+Pd from 289m
inc. 1m at 1.20% Ni, 356ppm Co, 174ppm Cu, 0ppb Pt+Pd from 290m
MTRC051
3m at 0.70% Ni, 400ppm Co, 0.38% Cu, 0.17g/t Pt+Pd from 147m
inc. 1m at 1.18% Ni, 650ppm Co, 0.67% Cu, 0.31g/t Pt+Pd from 148m
MTRC055
11m at 0.63% Ni, 211ppm Co, 535ppm Cu, 4ppb Pt+Pd from 175m
inc. 4m at 1.16% Ni, 345ppm Co, 0.13% Cu, 6ppb Pt+Pd from 182m
that inc. 2m at 1.97% Ni, 542ppm Co, 0.26% Cu, 12ppb Pt+Pd from 183m
which inc. 1m at 2.46% Ni, 641ppm Co, 0.43% Cu, 18ppb Pt+Pd from 183m
7m at 0.48% Ni, 226ppm Co, 248ppm Cu, 42ppb Pt+Pd from 234m
inc. 1m at 1.26% Ni, 489ppm Co, 431ppm Cu, 49ppb Pt+Pd from 239m
MTRC056
MTRC057
27m at 0.45% Ni, 172ppm Co, 263ppm Cu, 51ppb Pt+Pd from 81m
inc. 1m at 1.25% Ni, 398ppm Co, 0.15% Cu, 0.33g/t Pt+Pd from 96m
1m at 0.88% Ni, 449ppm Co, 0.60% Cu, 71ppb Pt+Pd from 221m
PROJECT OVERVIEW
Figure 1: Map of WMG project locations
ASX:WMG
www.westernmines.com.au
3
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
MULGA TANK
The Mulga Tank Project comprises exploration licences E39/2132, E39/2134 and E39/2223 and exploration
licence application E39/2299, covering the Minigwal Greenstone Belt, 190km east-northeast of Kalgoorlie. The
Minigwal Greenstone Belt is a NNW trending linear sequence of predominantly mafic and ultramafic lithologies; it
is very under explored due to the presence of shallow sand cover and presents a “frontier” exploration
opportunity for major Ni-Co-Cu-PGE and orogenic gold deposits.
Exploration results from the Company’s various drilling programs at the Mulga Tank Project over the last 18
months have demonstrated significant nickel sulphide mineralisation and an extensive nickel sulphide mineral
system within the Mulga Tank Ultramafic Complex.
The Company completed a 24 hole, ~7,400m Phase 3 RC program during the quarter in follow-up to previous
exploration. Of which, 19 holes, totalling 6,002m, were drilled within the main body of the Mulga Tank Ultramafic
Complex looking to infill around previous holes and extend mineralisation to the south and east of previous
drilling (ASX, First 19 Phase 3 RC Holes Complete at Mulga Tank, 2 September 2024). An additional five hole,
1,411m regional component of the Phase 3 RC program was designed to test the interpreted komatiite channel
system (based on aeromagnetic interpretation), extending from the main body of the Mulga Tank Complex, and
the interpreted lithologies of the Minigwal Greenstone Belt (ASX, Regional EIS Drilling Confirms Belt-Scale
Mineral System, 3 October 2024). Four of the holes were drilled with the aid of one of WMG’s current EIS grants
(ASX, WMG Wins Two More EIS Awards to Drill Mulga Tank, 29 April 2024).
RC DRILLING PROGRAMS
At the end of 2023 the Company completed a 22 hole reverse circulation (RC) drilling program. This was the first
drilling designed to systematically test the lateral continuity of the shallow, uppermost zone of disseminated
nickel sulphide mineralisation within the main body of the Mulga Tank Ultramafic Complex (ASX, RC Drilling
Program Commences at Mulga Tank, 20 September 2023; RC Drilling Expansion and Drilling for Equity, 17
October 2023; Completion of 7000m RC Drilling Program at Mulga Tank, 7 November 2023).
Modelling of the Phase 1 RC results identified a significant shallow mineralised zone, which has been reported
as an Exploration Target, in according with JORC 2012 (ASX, Mulga Tank JORC Exploration Target, 5 February
2024). The Company’s internal modelling work was reviewed by independent consultants CSA Global. The
Exploration Target with an estimated range of potential mineralisation is:
350 to 2,200 million tonnes grading 0.24% to 0.35% Ni, 120 to 150ppm Co with S:Ni 1.1 to 1.3
During the previous quarter the Company completed a further 17 hole, 5,534m Phase 2 RC program
predominantly focused on infilling the higher grade core area identified by the Company’s Exploration Target
modelling (ASX, 2024 Exploration Programs Commence at Mulga Tank, 29 January 2024; Completion of Phase
2 RC Drilling Commencement of EIS3, 8 April 2024). The RC holes were planned around Phase 1 holes
MTRC015 to MTRC018 in the centre of the main body of the Complex, in particular around MTRC016 that
returned 200m at 0.31% Ni (including 35m at 0.45% Ni) from 103m. The drill hole spacing in this central area
was reduced to approximately 200m x 200m (from the initial 500m x 300m spacing of the Phase 1 program)
covering an area of around 800m x 900m.
ASX:WMG
www.westernmines.com.au
4
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
During the current quarter the Company completed a Phase 3 RC drilling program within the main body of the
Complex (ASX, Exploration Activities Recommence at Mulga Tank, 4 July 2024; First 19 Phase 3 RC Holes
Complete at Mulga Tank, 2 September 2024) along with five additional regional holes (ASX, Regional EIS Drilling
Confirms Belt-Scale Mineral System, 3 October 2024). The program was focused on both further infill around
previous drilling in the core of the Complex (holes MTRC040 to MTRC043) and also on extending mineralisation
outside of previous tested zones and the JORC Exploration Target model shell (holes MTRC044 to MTRC058).
Final assay results have now been received for all 19 Phase 3 RC holes drilled within the main body of the
Complex, with extensive intervals of nickel sulphide mineralisation observed in all of the holes (ASX, Phase 3 RC
Results Yield Broad Sulphide Mineralisation Zones, 13 September 2024; MTRC046: Two High-Grade Zones inc.
5m at 1.92% Ni 0.21% Cu, 17 September; Phase 3 Assays Extend Known Mineralisation at Mulga Tank, 26
September 2024; Further High-Grade Intervals up to 2.46% Ni 0.43% Cu, 9 October 2024; Further Phase 3
Assay Results up to 1.25% Ni 0.60% Cu, 17 October 2024).
Zones of mineralisation were generally defined by a combination of the various geochemical indicators and cutoff grades (Ni >0.15% and S >0.1%; Cu >20ppm, Pt+Pd >20ppb and S:Ni >0.5), with only minimal inclusion of
unmineralised material below mineable width.
A summary of the Phase 3 RC assay results are listed below (Figure 2):
MTRC040
Cumulative 298m at 0.29% Ni, 131ppm Co, 65ppm Cu, 16ppb Pt+Pd with S:Ni 1.1*
MTRC041
Cumulative 254m at 0.27% Ni, 133ppm Co, 82ppm Cu, 20ppb Pt+Pd with S:Ni 1.3*
MTRC042
Cumulative 238m at 0.29% Ni, 133ppm Co, 96ppm Cu, 24ppb Pt+Pd with S:Ni 1.1*
MTRC043
249m at 0.28% Ni, 129ppm Co, 62ppm Cu, 14ppb Pt+Pd from 111m S:Ni 0.8*
MTRC044
Cumulative 187m at 0.28% Ni, 121ppm Co, 34ppm Cu, 10ppb Pt+Pd with S:Ni 0.8*
MTRC045
Cumulative 174m at 0.28% Ni, 125ppm Co, 49ppm Cu, 14ppb Pt+Pd with S:Ni 0.7*
MTRC046
193m at 0.33% Ni, 152ppm Co, 310ppm Cu, 25ppb Pt+Pd from 107m S:Ni 1.5*
MTRC047
188m at 0.28% Ni, 129ppm Co, 57ppm Cu, 23ppb Pt+Pd from 112m S:Ni 1.1*
MTRC048
Cumulative 173m at 0.29% Ni, 131ppm Co, 36ppm Cu, 19ppb Pt+Pd with S:Ni 0.7*
MTRC049
Cumulative 170m at 0.26% Ni, 125ppm Co, 50ppm Cu, 11ppb Pt+Pd with S:Ni 1.0*
MTRC050
Cumulative 164m at 0.28% Ni, 127ppm Co, 58ppm Cu, 13ppb Pt+Pd with S:Ni 1.0*
MTRC051
Cumulative 156m at 0.27% Ni, 133ppm Co, 212ppm Cu, 17ppb Pt+Pd with S:Ni 1.4*
MTRC052
192m at 0.28% Ni, 125ppm Co, 63ppm Cu, 11ppb Pt+Pd from 114m S:Ni 0.8*
MTRC053
205m at 0.28% Ni, 129ppm Co, 85ppm Cu, 16ppb Pt+Pd from 87m S:Ni 1.0*
MTRC054
200m at 0.28% Ni, 124ppm Co, 31ppm Cu, 10ppb Pt+Pd from 100m S:Ni 0.6*
MTRC055
216m at 0.30% Ni, 144ppm Co, 109ppm Cu, 20ppb Pt+Pd from 84m S:Ni 1.2*
MTRC056
201m at 0.31% Ni, 134ppm Co, 176ppm Cu, 15ppb Pt+Pd from 81m S:Ni 0.9
MTRC057
216m at 0.27% Ni, 139ppm Co, 159ppm Cu, 13ppb Pt+Pd from 84m S:Ni 1.1*
MTRC058
209m at 0.29% Ni, 132ppm Co, 50ppm Cu, 18ppb Pt+Pd from 91m S:Ni 0.8*
* Ending in mineralisation
ASX:WMG
www.westernmines.com.au
5
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
Figure 2: Phase 3 assay results for disseminated nickel sulphide mineralisation
Further intersections of shallow higher grade results were encountered in a number of the Phase 3 holes, with
results from hole MTRC046 showing the best high-grade intersection ever drilled at the project. Relatively
shallow high-grade results from the program within the central core area of the Mulga Tank Complex include:
MTRC046
10m at 0.81% Ni, 352ppm Co, 0.28% Cu, 77ppb Pt+Pd from 224m
inc. 4m at 1.14% Ni, 501ppm Co, 803ppm Cu, 0.14g/t Pt+Pd from 224m
and inc. 5m at 0.61% Ni, 258ppm Co, 0.49% Cu, 32ppb Pt+Pd from 229m
7m at 1.52% Ni, 578ppm Co, 0.16% Cu, 0.17g/t Pt+Pd from 282m
inc. 5m at 1.92% Ni, 711ppm Co, 0.21% Cu, 0.18g/t Pt+Pd from 283m
MTRC048
5m at 0.40% Ni, 115ppm Co, 33ppm Cu, 1ppb Pt+Pd from 266m
7m at 0.40% Ni, 141ppm Co, 33ppm Cu, 0ppb Pt+Pd from 279m
6m at 0.57% Ni, 195ppm Co, 92ppm Cu, 2ppb Pt+Pd from 289m
inc. 1m at 1.20% Ni, 356ppm Co, 174ppm Cu, 0ppb Pt+Pd from 290m
MTRC051
3m at 0.70% Ni, 400ppm Co, 0.38% Cu, 0.17g/t Pt+Pd from 147m
inc. 1m at 1.18% Ni, 650ppm Co, 0.67% Cu, 0.31g/t Pt+Pd from 148m
ASX:WMG
www.westernmines.com.au
6
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
MTRC055
11m at 0.63% Ni, 211ppm Co, 535ppm Cu, 4ppb Pt+Pd from 175m
inc. 4m at 1.16% Ni, 345ppm Co, 0.13% Cu, 6ppb Pt+Pd from 182m
that inc. 2m at 1.97% Ni, 542ppm Co, 0.26% Cu, 12ppb Pt+Pd from 183m
which inc. 1m at 2.46% Ni, 641ppm Co, 0.43% Cu, 18ppb Pt+Pd from 183m
7m at 0.48% Ni, 226ppm Co, 248ppm Cu, 42ppb Pt+Pd from 234m
inc. 1m at 1.26% Ni, 489ppm Co, 431ppm Cu, 49ppb Pt+Pd from 239m
MTRC056
27m at 0.45% Ni, 172ppm Co, 263ppm Cu, 51ppb Pt+Pd from 81m
inc. 1m at 1.25% Ni, 398ppm Co, 0.15% Cu, 0.33g/t Pt+Pd from 96m
3m at 0.50% Ni, 237ppm Co, 0.40% Cu, 18ppb Pt+Pd from 273m
MTRC057
1m at 0.88% Ni, 449ppm Co, 0.60% Cu, 71ppb Pt+Pd from 221m
A total of 23 intersections >1% Ni have now been observed within the 58 RC holes to date. These intervals have
generally only been logged as matrix to semi-massive sulphide in RC chips, highlighting the high tenor of the
sulphide system.
Figure 3: Higher grade assay results within the core of the Mulga Tank Ultramafic Complex
ASX:WMG
www.westernmines.com.au
7
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
REGIONAL RC DRILLING
An additional five hole, 1,411m regional component of the Phase 3 RC program was designed to test the
interpreted komatiite channel system (based on aeromagnetic interpretation), extending from the main body of
the Mulga Tank Complex. These five RC holes were drilled to gain greater understanding of the geology of the
wider Minigwal Greenstone Belt that has seen limited effective drill testing beneath ~60m of sand cover.
Generally they targeted linear magnetic high features emanating from the main body of the Complex which were
interpreted to be part of an ultramafic komatiite channel system. The Panhandle feature and a chain of these
magnetic features extend approximately 15km in a north-northwest direction up the Minigwal Belt. Four of the
holes in tenement E39/2134 were drilled with the aid of one of WMG’s current EIS grants (ASX, WMG Wins Two
More EIS Awards to Drill Mulga Tank, 29 April 2024).
The five holes were successful in confirming the interpreted geology, with olivine cumulate (logged as dunite
whilst awaiting geochemical and petrological confirmation), komatiite and/or high MgO mafic lithologies
encountered in all of the holes. Of exceptionally significant note was that visible sulphide mineralisation was
observed in a number of the intervals of dunite and komatiite encountered, including ~150m of disseminated
sulphide mineralisation in hole MTRC063 (EIS7) and a number of intersections of semi-massive/remobilised
sulphide in hole MTRC062 (EIS6). This is a standout result, highlighting the belt-scale potential of the Mulga Tank
nickel sulphide mineral system.
Figure 4: Drilling in the Panhandle area of the Mulga Tank Complex
ASX:WMG
www.westernmines.com.au
8
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
DOWNHOLE ELECTROMAGNETIC SURVEY
A multiple hole DownHole ElectroMagnetic (DHEM) survey was undertaken during the quarter. The survey was
designed to test a number of recent deep diamond and RC holes within the central core area of the Mulga Tank
Complex. All planned holes were able to be surveyed to essentially bottom of hole, with the exception of deep
diamond hole MTD028 which was found to be repeatedly blocked despite attempts at flushing it out.
Results from the DHEM survey identified anomalies associated with the visual sulphide mineralisation observed
in each of the holes. The results from holes MTRC015 and MTRC018 in particular are being further investigated,
these holes will possibly be re-entered and extended to target off-end of hole anomalies and/or to better define
the anomalies identified.
Figure 5: DHEM Survey Plan
ASX:WMG
www.westernmines.com.au
9
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
HoleID
Hole Depth
Surveyed
Comments
MTD027
1662.3m
110-1450m
Minor inhole/offhole anomalism apparent 440-460m, 880-920m, 1260-1290m DH. Broad/
stratigraphic inhole/offend type anomaly centred >1450m DH.
MTD029
1722m
130-1690m
Minor inhole/offhole anomalism apparent 480-500m, 680-700m, 1010-1030m DH. Broad/
stratigraphic inhole/offend type anomaly centred >1600m DH.
MTRC015
300m
10-290m
Minor inhole/offhole anomalism apparent 170-190m, 210-240m DH. Stringer-type sulphides
appear to relate to visual NiCuS at 172m, 185m and 229m. Broader inhole/offend type
anomaly defined at 270-290m DH. Worth extending hole and completing extended DHEM.
MTRC018
312m
20-292m
Minor inhole/offhole anomalism apparent 165-175m, 280-290m DH. Stringer-type
sulphides. Broader offend type anomaly defined at >292m DH. Possibly worth extending
hole and completing extended DHEM.
MTRC024
360m
14-350m
Minor inhole/offhole anomalism apparent 190-220m, 240-260m DH. Stringer-type sulphides
appear to relate to visual NiS/NiCuS at 202m and 253m. Broad building anomalous
response apparent towards end of hole in Z/Y components.
MTRC032
306m
16-300m
Minor inhole/offhole anomalism apparent 115-125m, 130-145m, 210m and 245-280m DH.
Stringer-type sulphides appear to relate to visual NiS/NiCuS at 131m and 254-260m.
MTRC038
318m
26-310m
Minor inhole/offhole anomalism apparent 120-140m, 160-180m, 190-210m DH. Stringertype sulphides appear to relate to visual NiS/NiCuS at 122m, 135m, 169m and 192m.
Table 1: DHEM Survey Results
UPDATE ON METALLURGICAL TEST WORK
The upper portion of diamond hole MTD29 (EIS3) (drilled during the previous quarter) was drilled with larger
diameter HQ core to provide material for initial metallurgical test work of the shallow disseminated mineralisation.
Six intervals of mineralisation, totalling 62m downhole length and approximately 113kg weight, were selected
from the top 150m to 300m depth of the hole.
Each of the 6 intervals of core were crushed and sampled on a length weighted basis to form a 50kg bulk
sample, representative of the hole. The remaining crushed material was kept as individual intervals and placed in
cold storage. To date a series of 9 different rougher floatation tests have been conducted on the bulk sample
material, each testing different factors including grind size (75um to 150um) and various reagents, with and
without desliming of fines. Nickel sulphides have been successfully recovered in all of the tests, with the test
work suggesting only around ~0.1% Ni is present as non-sulphide silicate nickel.
The Company has further iterations of the test work planned, with the testing focused on maximising nickel
recovery with the simplest possible processing. The Company will report results to shareholders at a suitable
time once the test work is concluded and results approximating an eventual flowsheet have been achieved.
DISCUSSION
Another great quarter for the Company and the Mulga Tank Project, with the Phase 3 RC being our most
successful campaign to date. Drilling at the project highlights an extensive magmatic nickel sulphide mineral
system within the Mulga Tank Ultramafic Complex, with visible nickel sulphide encountered nearly everywhere
we drill. Significant Type 2 Mt Keith-style disseminated nickel sulphide mineralisation has been demonstrated
across the majority of the main body of the Complex, some ~4km.
ASX:WMG
www.westernmines.com.au
10
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
This zone of shallow Mt Keith-style mineralisation could be amenable to large scale open pit mining, which the
Company reported as an Exploration Target in early February. This was a major milestone for both the project
and the Company; a culmination of two years of steadily improving results at the project. The Exploration Target
highlights Mulga Tank could be a potentially globally significant nickel sulphide deposit.
In follow-up to the Exploration Target modelling the Company focused the Phase 2 RC program on the higher
grade core area, looking to infill, progressively de-risk and aid resource evaluation of this zone. The Phase 2
holes were successful in extending and improving confidence in this central core with a number of robust
mineralised intersections around ~200m or greater now identified across the first two Phases.
The recent Phase 3 RC program looked to both infill within the higher grade core area of the Exploration Target
modelling and also step outside the modelled mineralisation towards the south and southeast; with the 19
Phase 3 holes in the main body of the Complex split 7 for infill and 12 extending mineralisation. Remarkably all
19 holes showed nickel sulphide mineralisation; a similar feat was achieved in the Phase 2 RC program with
all 17 of 17 holes showing mineralisation (ASX, All Phase 2 RC Holes Show Broad Sulphide Mineralisation, 14
May 2024) and in the Phase 1 RC program 19 of 22 holes intersected mineralisation - a running total of 55 out
of 58 RC holes being mineralised.
A number of the 12 holes drilled outside the Exploration Target shell returned some very robust assay results of
mineralisation, including MTRC046 that was one of the best holes drilled to date across the various phases of
RC drilling. MTRC046 contained both strong disseminated mineralisation 193m at 0.33% Ni, 152ppm Co,
310ppm Cu, 25ppb Pt+Pd from 107m with S:Ni of 1.5, along with two zones of higher grade material:
MTRC046 Zone 1
10m at 0.81% Ni, 352ppm Co, 0.28% Cu, 77ppb Pt+Pd from 224m
inc. 4m at 1.14% Ni, 501ppm Co, 803ppm Cu, 0.14g/t Pt+Pd from 224m
and inc. 5m at 0.61% Ni, 258ppm Co, 0.49% Cu, 32ppb Pt+Pd from 229m
MTRC046 Zone 2
7m at 1.52% Ni, 578ppm Co, 0.16% Cu, 0.17g/t Pt+Pd from 282m
inc. 5m at 1.92% Ni, 711ppm Co, 0.21% Cu, 0.18g/t Pt+Pd from 283m
These are standout results, with hole MTRC046 drilled ~100m to the south of hole MTRC032, which itself
showed two higher grade intersections:
MTRC032
1m at 1.08% Ni, 602ppm Co, 379ppm Cu, 83ppb Pt+Pd from 131m
6m at 1.01% Ni, 443ppm Co, 0.32% Cu, 0.12g/t Pt+Pd from 254m
A total of 23 higher grade intersections greater than 1% Ni have now been encountered in the RC drilling
over an approximately 2.5km2 area in the core of the main body of the Complex. These results are generally
all within the top 300 vertical metres from surface, within what could be a large open pit scenario. Given the drill
spacing across this area is generally still around 200m x 200m, these results highlight the prospectivity and
potential to find pods or zones of higher grade material within the extensive lower grade disseminated system.
These higher grade results are distributed across the central area of the Complex, some of which can start to be
correlated between drill holes over several hundreds of metres and possibly cluster in nine areas. The Company
will look to target these areas with follow-up work, with more also likely to be found as further parts of the
Complex are tested. A modest improvement in the width of these high grade intersections could really change
the value proposition of the project and highlight zones that could be amenable to starter pit operations in a
future mine plan or model.
ASX:WMG
www.westernmines.com.au
11
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
JASPER HILL
The Jasper Hill Project comprises exploration licences E39/2073, E39/2079 and prospecting licence P39/6267.
The project is located approximately 80km southeast of Laverton and covers part of the poorly exposed Merolia
Greenstone Belt, a NNW trending belt, up to 20km wide, that can be traced over 110km in a SSE direction from
the Burtville Mining Centre. The project area is lightly explored, but is contiguous to the historical producing
mines of Lord Byron (160,000oz at 1.0g/t Au) and Fish (87,000oz at 4.1g/t Au) owned by Brightstar Resources
(ASX:BTR).
Jasper Hill is the Company’s primary gold project containing a mineralised gold trend over 3km strike. The
Company has previously completed field reconnaissance work involving geological mapping, high-resolution
ground magnetic survey and locating historical drill collars and registered aboriginal heritage sites.
Following the grant of P39/6267, and a desktop review of the project in the previous quarter, the Company
recently completed various fieldwork campaigns involving ground magnetics (extending current coverage),
ground gravity and soil and rock chip sampling.
Figure 6: WMG ground magnetic survey and significant historical drill intersections (E39/2073 and P39/6267)
ASX:WMG
www.westernmines.com.au
12
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
Figure 7: WMG ground gravity survey points
Figure 8: WMG soil sampling points
ASX:WMG
www.westernmines.com.au
13
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
YOUANMI
The Youanmi Project comprises exploration licence E57/1119. The project is located 70km southwest of
Sandstone and lies on the eastern side of the Youanmi Greenstone Belt, along the major Youanmi Shear.
The tenement is located 7km from the historic Youanmi Gold Mining Centre, which has produced over
600,000oz of gold since its discovery in the late 1800’s, currently owned by Rox Resources (ASX:RXL) and
Venus Metals (ASX:VMC). The area has seen a resurgence in exploration activity with the recent discovery of the
high-grade Penny North (ASX:RMS) and Grace (ASX:RXL) deposits along the Youanmi Shear.
A site visit for field reconnaissance and part of a high-resolution ground magnetic survey were completed during
2023. Following a review of the project and identification of the historical Deep Well prospect the Company
undertook further fieldwork during the previous quarter involving ground gravity surveying. Results from the initial
gravity survey are being processed and further fieldwork will be planned at the project over the second half of
2024.
Figure 9: Historical Deep Well RAB drilling and WMG ground gravity survey points
ASX:WMG
www.westernmines.com.au
14
ASX RELEASE | QUARTERLY ACTIVITIES REPORT SEPTEMBER 2024
MELITA
The Melita Project comprises exploration licence E40/379, covering an area of approximately 105km2. The
project is located 20km south-southeast of Leonora and to the north of the Kookynie, Niagara and Orient WellButterfly gold mining centres, in the heart of the WA Goldfields. The Kookynie area has seen recent upswing in
exploration, with WMG’s Melita Project surrounded by the likes of Genesis Minerals (ASX:GMD), Saturn Metals
(ASX:STN), Azure Minerals and KIN Mining (ASX:KIN).
The Company notes the increase in M&A activity around the Leonora-Kookynie area and undertook a review of
the project, including soil geochemical and ground magnetic data collected during a series of WMG field
campaigns (ASX, Major Field Program Commences at Melita,