June 2024 Quarterly Activities & Cash Flow Reports
Released
Released
Announcement PDF
ASX RELEASE
30 JULY 2024
QUARTERLY ACTIVITIES REPORT JUNE 2024
HIGHLIGHTS
• Completion of 17 hole Phase 2 RC (5,534m) and deep diamond hole MTD029 (EIS3) (1,722m) at
Mulga Tank Ni-Co-Cu-PGE Project
• Phase 2 RC assay results received with all holes showing broad zones of nickel sulphide
mineralisation including multiple holes with ~200m intersections within the top ~300m:
MTRC024
199m at 0.31% Ni, 148ppm Co, 76ppm Cu, 23ppb Pt+Pd from 161m with S:Ni 1.1
MTRC034
240m at 0.30% Ni, 133ppm Co, 133ppm Cu, 36ppb Pt+Pd from 90m with S:Ni 1.0
MTRC038
199m at 0.31% Ni, 139ppm Co, 260ppm Cu, 27ppb Pt+Pd from 119m with S:Ni 1.3
• Multiple zones of higher grade matrix to semi-massive sulphide encountered in RC drilling:
MTRC018
1m at 1.84% Ni, 0.10% Co, 4.88% Cu, 26ppb Pt+Pd from 293m
MTRC024
3m at 2.19% Ni, 777ppm Co, 597ppm Cu, 9ppb Pt+Pd from 253m
inc. 1m at 4.51% Ni, 0.16% Co, 0.14% Cu, 16ppb Pt+Pd from 253m
MTRC032
6m at 1.01% Ni, 443ppm Co, 0.32% Cu, 0.12g/t Pt+Pd from 254m
MTRC038
2m at 1.51% Ni, 539ppm Co, 0.72% Cu, 94ppb Pt+Pd from 135m
1m at 3.16% Ni, 662ppm Co, 385ppm Cu, 0.18g/t Pt+Pd from 192m
• First assay results received for top 600m of diamond hole MTD029 (EIS3) showing continuous
mineralisation over ~500m:
MTD029
494m at 0.29% Ni, 135ppm Co, 74ppm Cu, 20ppb Pt+Pd from 108m with S:Ni 1.0
• WMG continues to de-risk a potentially globally significant, large-scale, open-pitable nickel
sulphide deposit at Mulga Tank
• WMG successfully won two further EIS awards totalling $318,000 to drill Mulga Tank
• Capital raise of $1,537,000 during the period to progress exploration at Mulga Tank - welcoming
international mining investor Dundee Corporation as a significant new shareholder
Western Mines Group Ltd (WMG or Company) (ASX:WMG) is pleased to provide shareholders with the following
Quarterly Activities Report, and accompanying Appendix 5B, for what has been another extremely productive
quarter for the Company.
WMG’s focus for the period was the flagship Mulga Tank Ni-Cu-PGE Project where results continue to validate
the discovery of a major nickel sulphide mineral system.
Western Mines Group Ltd
Level 3, 33 Ord Street
West Perth WA 6005
ASX:WMG
Telephone: +61 475 116 798
Email: contact@westernmines.com.au
www.westernmines.com.au
Shares on Issue: 80.81m
Share Price: $0.245
Market Cap: $19.80m
Cash: $2.13m (30/06/24)
1
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
At the beginning of the quarter the Company announced the completed the 17 hole, 5,534m Phase 2 reverse
circulation (RC) drilling program (ASX, Completion of Phase 2 RC Drilling Commencement of EIS3, 8 April 2024).
The Phase 2 RC drilling was focused on infilling the higher grade core of the Mulga Tank Exploration Target
(ASX, Mulga Tank JORC Exploration Target, 5 February 2024) and extending the shallow mineralisation to the
south of the Phase 1 area.
Final assay results for the Phase 2 program were received during the period, with extensive intervals of nickel
sulphide mineralisation observed in all of the holes. A number of the holes returned broad intersections of
mineralisation over greater than 200m length including:
MTRC024
199m at 0.31% Ni, 148ppm Co, 76ppm Cu, 23ppb Pt+Pd from 161m S:Ni 1.1*
MTRC026
226m at 0.28% Ni, 125ppm Co, 62ppm Cu, 15ppb Pt+Pd from 86m S:Ni 0.7
MTRC031
210m at 0.28% Ni, 137ppm Co, 104ppm Cu, 24ppb Pt+Pd from 87m S:Ni 1.2
MTRC032
198m at 0.28% Ni, 145ppm Co, 249ppm Cu, 28ppb Pt+Pd from 108m S:Ni 1.6*
MTRC034
240m at 0.30% Ni, 133ppm Co, 133ppm Cu, 36ppb Pt+Pd from 90m S:Ni 1.0*
MTRC038
199m at 0.31% Ni, 139ppm Co, 260ppm Cu, 27ppb Pt+Pd from 119m S:Ni 1.3*
* Ending in mineralisation
Broad intersections of visible disseminated nickel sulphide mineralisation, grading up to semi-massive in some
intersections, were observed and logged in the Phase 2 RC program (ASX, Semi-Massive Sulphide in Mulga
Tank Phase 2 RC Holes, 29 February 2024). These observations were confirmed by assay results with a number
of the holes returning higher grade assay results between 1% to 4.5% Ni. Relatively shallow higher grade results
within the central core area of the Mulga Tank Complex include:
MTRC015
1m at 1.11% Ni, 379ppm Co, 0.45% Cu, 62ppb Pt+Pd from 172m
3m at 1.32% Ni, 516ppm Co, 0.10% Cu, 34ppb Pt+Pd from 184m
2m at 1.71% Ni, 836ppm Co, 0.10% Cu, 0.4g/t Pt+Pd from 229m
MTRC018
1m at 1.84% Ni, 0.10% Co, 4.88% Cu, 26ppb Pt+Pd from 293m
MTRC024
1m at 1.28% Ni, 890ppm Co, 427ppm Cu, 37ppb Pt+Pd from 202m
3m at 2.19% Ni, 777ppm Co, 597ppm Cu, 9ppb Pt+Pd from 253m
inc. 1m at 4.51% Ni, 0.16% Co, 0.14% Cu, 16ppb Pt+Pd from 253m
MTRC032
1m at 1.08% Ni, 602ppm Co, 379ppm Cu, 83ppb Pt+Pd from 131m
6m at 1.01% Ni, 443ppm Co, 0.32% Cu, 0.12g/t Pt+Pd from 254m
MTRC038
2m at 1.51% Ni, 539ppm Co, 0.72% Cu, 94ppb Pt+Pd from 135m
1m at 3.16% Ni, 662ppm Co, 385ppm Cu, 0.18g/t Pt+Pd from 192m
Following the Phase 2 RC program the Company recommenced diamond drilling at the project with EIS cofunded deep diamond hole MTD029 (EIS3) (ASX, Completion of Phase 2 RC Drilling Commencement of EIS3, 8
April 2024; WMG Wins $220,000 EIS Award to Drill Mulga Tank, 19 October 2023).
MTD029 (EIS3) was completed during the period and drilled to a total depth of 1,722m. The hole showed 860m
of visible disseminated sulphide mineralisation along with numerous intersections of high-grade sulphide veinlets
and large sulphide segregations - strong evidence for the system to host a massive sulphide component.
ASX:WMG
www.westernmines.com.au
2
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
In April, the Company received notification of the award of two more WA Government Exploration Incentive
Scheme (EIS) grants, totalling $318,000, to co-fund further drilling at the Mulga Tank Project (ASX, WMG Wins
Two More EIS Awards to Drill Mulga Tank, 29 April 2024). In June, the Company successfully completed a
capital raise of $1,537,000 (before costs) through the issue of 4,803,125 new fully paid ordinary shares at an
issue price of $0.32 per share in order to support ongoing exploration at Mulga Tank (ASX, Capital Raise to
International Mining Fund, 24 June 2024).
PROJECT OVERVIEW
Figure 1: Map of WMG project locations
ASX:WMG
www.westernmines.com.au
3
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
MULGA TANK
The Mulga Tank Project comprises exploration licences E39/2132, E39/2134 and E39/2223 and exploration
licence application E39/2299, covering the Minigwal Greenstone Belt, 190km east-northeast of Kalgoorlie. The
Minigwal Greenstone Belt is a NNW trending linear sequence of predominantly mafic and ultramafic lithologies; it
is very under explored due to the presence of shallow sand cover and presents a “frontier” exploration
opportunity for major Ni-Cu-PGE and orogenic gold deposits.
Exploration results from the Company’s various drilling programs at the Mulga Tank Project over the last 12
months have demonstrated significant nickel sulphide mineralisation and an extensive nickel sulphide mineral
system within the Mulga Tank Ultramafic Complex.
WMG completed the 17 hole 5,534m Phase 2 RC drilling program and EIS deep diamond hole MTD029 (EIS3)
during the quarter (ASX, Completion of Phase 2 RC Drilling Commencement of EIS3, 8 April 2024; High-Grade
Sulphide Segregations at Depth in MTD029 (EIS3), 29 May 2024). This two pronged approach uses RC to infill
and prove up the extent of shallow disseminated nickel sulphide mineralisation, defined by the Company’s
JORC Exploration Target modelling (ASX, Mulga Tank JORC Exploration Target, 5 February 2024), whilst the
diamond drilling program continues to test deeper targets. Further drill holes will continue to be added to these
programs, with ongoing targeting work, as the Company systematically explores the Mulga Tank Ultramafic
Complex (ASX, Exploration Activities Recommence at Mulga Tank, 4 July 2024).
RC DRILLING PROGRAMS
At the end of 2023 the Company completed a 22 hole reverse circulation (RC) drilling program. This was the first
drilling designed to systematically test the lateral continuity of the shallow, uppermost zone of disseminated
nickel sulphide mineralisation within the main body of the Mulga Tank Ultramafic Complex (ASX, RC Drilling
Program Commences at Mulga Tank, 20 September 2023; RC Drilling Expansion and Drilling for Equity, 17
October 2023; Completion of 7000m RC Drilling Program at Mulga Tank, 7 November 2023).
Modelling of the Phase 1 RC results identified a significant shallow mineralised zone, which has been reported
as an Exploration Target, in according with JORC 2012 (ASX, Mulga Tank JORC Exploration Target, 5 February
2024). The Company’s internal modelling work was reviewed by independent consultants CSA Global. The
Exploration Target with an estimated range of potential mineralisation is:
350 to 2,200 million tonnes grading 0.24% to 0.35% Ni, 120 to 150ppm Co with S:Ni 1.1 to 1.3
During the quarter the Company announced the completion of a further 17 hole, 5,534m Phase 2 RC program
predominantly focused on infilling the higher grade core area identified by the Company’s Exploration Target
modelling (ASX, 2024 Exploration Programs Commence at Mulga Tank, 29 January 2024; Completion of Phase
2 RC Drilling Commencement of EIS3, 8 April 2024). The RC holes were planned around Phase 1 holes
MTRC015 to MTRC018 in the centre of the main body of the Complex, in particular around MTRC016 that
returned 200m at 0.31% Ni (including 35m at 0.45% Ni) from 103m.
The drill hole spacing in this central area was reduced to approximately 200m x 200m (from the initial 500m x
300m spacing of the Phase 1 program) covering an area of around 800m x 900m. Each hole was designed to a
target depth of 300-350m, which was achieved in all holes, for a total of 5,534m - of which the top ~60m of
each hole, or 1,064m in total, was mud-rotary drilling through the sand cover.
ASX:WMG
www.westernmines.com.au
4
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
Visible sulphide mineralisation was observed in the Phase 2 RC holes (ASX, Semi-Massive Sulphide in Mulga
Tank Phase 2 RC Holes, 29 February 2024). All holes were sampled at 1m intervals from the start of RC drilling
(i.e. base of mud rotary) with a total of 4,470 samples delivered to the ALS laboratory in Perth for geochemical
assay. Final assay results for the Phase 2 RC holes were received during the quarter (ASX, MTRC024 Assays Matrix-Massive Sulphide over 4.5% Ni; Further RC Results with 200m Zones of Mineralisation, 28 March 2024;
MTRC032 Assays Matrix Sulphide 6m at 1.01% Ni 0.32% Cu, 10 April 2024; MTRC038 Assay Results up to
3.16% Ni and 1.20% Cu, 16 April 2024; All Phase 2 RC Holes Show Broad Sulphide Mineralisation, 14 May
2024).
Zones of mineralisation were generally defined by a combination of the various geochemical indicators and cutoff grades (Ni >0.16%, Cu >20ppm, Pt+Pd >20ppb, S >0.1% and S:Ni >0.5), with only minimal inclusion of
unmineralised material below mineable width.
A summary of the Phase 2 RC assay results are listed below:
MTRC023
Cumulative 115m at 0.28% Ni, 133ppm Co, 51ppm Cu, 27ppb Pt+Pd with S:Ni 0.9
MTRC024
MTRC025
199m at 0.31% Ni, 148ppm Co, 76ppm Cu, 23ppb Pt+Pd from 161m S:Ni 1.1*
Cumulative 239m at 0.28% Ni, 139ppm Co, 72ppm Cu, 19ppb Pt+Pd with S:Ni 1.2*
MTRC026
226m at 0.28% Ni, 125ppm Co, 62ppm Cu, 15ppb Pt+Pd from 86m S:Ni 0.7
MTRC027
Cumulative 193m at 0.26% Ni, 124ppm Co, 78ppm Cu, 22ppb Pt+Pd with S:Ni 1.0*
MTRC028
Cumulative 152m at 0.30% Ni, 134ppm Co, 109ppm Cu, 20ppb Pt+Pd with S:Ni 0.9
MTRC029
Cumulative 138m at 0.25% Ni, 113ppm Co, 32ppm Cu, 6ppb Pt+Pd with S:Ni 0.6*
MTRC030
Cumulative 179m at 0.28% Ni, 126ppm Co, 41ppm Cu, 10ppb Pt+Pd with S:Ni 0.7*
MTRC031
210m at 0.28% Ni, 137ppm Co, 104ppm Cu, 24ppb Pt+Pd from 87m S:Ni 1.2
MTRC032
198m at 0.28% Ni, 145ppm Co, 249ppm Cu, 28ppb Pt+Pd from 108m S:Ni 1.6*
MTRC033
Cumulative 184m at 0.27% Ni, 126ppm Co, 82ppm Cu, 18ppb Pt+Pd with S:Ni 0.9*
MTRC034
240m at 0.30% Ni, 133ppm Co, 133ppm Cu, 36ppb Pt+Pd from 90m S:Ni 1.0*
MTRC035
220m at 0.28% Ni, 124ppm Co, 63ppm Cu, 25ppb Pt+Pd from 82m S:Ni 0.7
MTRC036
182m at 0.27% Ni, 134ppm Co, 63ppm Cu, 27ppb Pt+Pd from 102m S:Ni 1.0
MTRC037
224m at 0.29% Ni, 139ppm Co, 208ppm Cu, 25ppb Pt+Pd from 91m S:Ni 1.0
MTRC038
199m at 0.31% Ni, 139ppm Co, 260ppm Cu, 27ppb Pt+Pd from 119m S:Ni 1.3*
MTRC039
Cumulative 165m at 0.28% Ni, 125ppm Co, 73ppm Cu, 15ppb Pt+Pd with S:Ni 0.7
* Ending in mineralisation
Broad intersections of visible disseminated nickel sulphide mineralisation, grading up to semi-massive in some
intersections, were observed and logged in the Phase 2 RC program (ASX, Semi-Massive Sulphide in Mulga
Tank Phase 2 RC Holes, 29 February 2024). These observations were confirmed by assay results with a number
of the holes returning higher grade assay results between 1% to 4.5% Ni. Relatively shallow higher grade results
within the central core area of the Mulga Tank Complex include:
MTRC015
1m at 1.11% Ni, 379ppm Co, 0.45% Cu, 62ppb Pt+Pd from 172m
3m at 1.32% Ni, 516ppm Co, 0.10% Cu, 34ppb Pt+Pd from 184m
2m at 1.71% Ni, 836ppm Co, 0.10% Cu, 0.4g/t Pt+Pd from 229m
MTRC018
ASX:WMG
1m at 1.84% Ni, 0.10% Co, 4.88% Cu, 26ppb Pt+Pd from 293m
www.westernmines.com.au
5
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
MTRC024
1m at 1.28% Ni, 890ppm Co, 427ppm Cu, 37ppb Pt+Pd from 202m
3m at 2.19% Ni, 777ppm Co, 597ppm Cu, 9ppb Pt+Pd from 253m
inc. 1m at 4.51% Ni, 0.16% Co, 0.14% Cu, 16ppb Pt+Pd from 253m
MTRC032
1m at 1.08% Ni, 602ppm Co, 379ppm Cu, 83ppb Pt+Pd from 131m
6m at 1.01% Ni, 443ppm Co, 0.32% Cu, 0.12g/t Pt+Pd from 254m
MTRC038
2m at 1.51% Ni, 539ppm Co, 0.72% Cu, 94ppb Pt+Pd from 135m
1m at 3.16% Ni, 662ppm Co, 385ppm Cu, 0.18g/t Pt+Pd from 192m
Figure 2: Phase 2 assay results for shallow disseminated nickel sulphide mineralisation
around the core area
ASX:WMG
www.westernmines.com.au
6
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
Figure 3: Mineralised RC Intersections of ~200m within the core of the Mulga Tank Ultramafic Complex
DIAMOND DRILLING
Hole MTD029 (EIS3) was drilled during the period and is located in the centre of the Mulga Tank Complex
between RC holes MTRC015 and MTRC016 and previous diamond holes MTD023 (EIS1), MTD026 (EIS2) and
MTD027. The hole was positioned for multiple purposes, infilling the RC drilling program at this location and
looking to test a conductive MobileMT anomaly around -700m RL, near the basal contact and for a sulphide
enriched keel in the deepest part of the Complex.
The hole was drilled to a total depth of 1,722m, the deepest hole drilled at the project, and intersected ~1,600m
of variably serpentinised and talc-carbonate altered high MgO meso-adcumulate dunite ultramafic
(66-1,658.2m), beneath 66m of sand cover (0-66m), before encountering a footwall of basalt and silicified shales
at 1,658.2m depth (1,658.2-1,722m).
ASX:WMG
www.westernmines.com.au
7
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
Disseminated magmatic sulphides (trace to 2%) were observed at numerous intervals down the hole,
cumulatively over more than 860m. In a number of places the disseminated sulphides coalesce into interstitial
blebs (3 to 5% sulphide) between former olivine crystals. Corresponding pXRF readings of Ni, with elevated Cu
and S, along with mineralogical thin section analysis, support the likelihood of this being disseminated magmatic
nickel sulphide mineralisation.
Multiple intersections of high-tenor remobilised nickel sulphide veinlets as well as large immiscible sulphide
segregations were observed down the hole, confirmed by spot pXRF readings up to 57.3% Ni. These sulphide
veinlets and segregations clearly demonstrate all the conditions and processes are present to form basal
massive sulphide accumulations within the Mulga Tank Complex, with the most frequent and ‘active’ zones
encountered to date seen within hole MTD029 (EIS3).
MTD029
NQ2 Core
2” Diameter
Depth: 1599.9m
Spot pXRF: 57.3% Ni, 1.68% Co, 1.75% Cu
Figure 4: Photo showing examples of large sulphide segregations in hole MTD029 (EIS3)
Note: core is NQ2 being 2 inches or 50mm diameter
Initial assay results for the top ~600m of the hole were received during the quarter with near continuous
mineralisation observed down the hole. This were generally defined by a combination of the various geochemical
indicators and cut-off grades (Ni >0.16%, Cu >20ppm, Pt+Pd >20ppb, S:Ni >0.5), with only minimal inclusion of
unmineralised material below mineable width. The broad mineralised intersection was defined as:
MTD029
494m at 0.29% Ni, 135ppm Co, 74ppm Cu, 20ppb Pt+Pd from 108m with S:Ni 1.0
With a number of higher grade intervals including:
58m at 0.34% Ni, 138ppm Co, 108ppm Cu, 30ppb Pt+Pd from 204m
inc. 8m at 0.48% Ni, 147ppm Co, 168ppm Cu, 35ppb Pt+Pd from 210m
and inc. 10m at 0.40% Ni, 172ppm Co, 351ppm Cu, 61ppb Pt+Pd from 232m
ASX:WMG
www.westernmines.com.au
8
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
19m at 0.44% Ni, 209ppm Co, 246ppm Cu, 64ppb Pt+Pd from 378m
inc. 8m at 0.54% Ni, 250ppm Co, 371ppm Cu, 81ppb Pt+Pd from 389m
that inc. 1m at 1.56% Ni, 548ppm Co, 0.12% Cu, 0.2g/t Pt+Pd from 395m
10m at 0.38% Ni, 167ppm Co, 91ppm Cu, 50ppb Pt+Pd from 568m
DISCUSSION
Another great quarter for the Company and the Mulga Tank Project. Drilling to date at the project highlights an
extensive magmatic nickel sulphide mineral system within the Mulga Tank Ultramafic Complex, with visible nickel
sulphide encountered nearly everywhere we drill. Significant Type 2 Mt Keith-style disseminated nickel sulphide
mineralisation has been demonstrated across the majority of the main body of the Complex, some ~4km.
This zone of shallow Mt Keith-style mineralisation could be amenable to large scale open pit mining, which the
Company reported as an Exploration Target in early February. This was a major milestone for both the project
and the Company; a culmination of two years of steadily improving results at the project. The Exploration Target
highlights Mulga Tank could be a potentially globally significant nickel sulphide deposit.
In follow-up to the Exploration Target modelling the Company focused the Phase 2 RC program on the higher
grade core area, looking to infill, improve confidence, progressively de-risk and aid resource evaluation of this
zone. The Phase 2 holes were successful in extending and improving confidence in this central core area with a
number of robust mineralised intersections around ~200m or greater now identified across the two Phases.
Whilst the Company continues to de-risk the extensive shallow disseminated mineralisation, there is increasing
evidence of a Type 1/2 hybrid nickel sulphide mineral system more akin to Perseverance-style mineralisation
(basal massive sulphide component). This includes numerous examples of remobilised massive sulphide veinlets
and visible larger in-situ immiscible sulphide globules seen in diamond drilling throughout the Complex.
The deeper portion of diamond hole MTD029 (EIS3) showed the strongest evidence to date for the system to
host a massive sulphide component, with frequent sulphide veining and numerous zones of large sulphide
segregations, in a very “active” and sulphide saturated magma assemblage. These observations continue to
validate the Company’s assumptions and exploration thesis. Heavily disseminated, possible “cloud
sulphide”, was encountered in hole MTD029 (EIS3) at a similar relative position to the zone seen in MTD027 which returned 96m at 0.40% NI from 1,208m, including 38m at 0.56% Ni from 1,262m and 8m at 1.11% Ni
from 1,270m
Visible sulphides grading up to semi-massive in some intersections, were observed and logged in the Phase 2
RC program. These were confirmed by assay results with a number of the holes returning higher grade results
between 1% to 4.5% Ni, in relatively shallow intersections. These results are distributed across the central area
of the Complex, some of which can start to be correlated between drill holes over several hundreds of metres.
The Company will look to target thicker intervals of this material with follow-up work - a modest improvement in
the width of these high grade intersections could really change the value proposition of the project.
A Phase 3 RC program was announced and commenced for the current quarter (ASX, Exploration Activities
Recommence at Mulga Tank, 4 July 2024). This program will look to follow-up on higher grade holes MTRC032
and MTRC038 extending mineralisation further to the south, as well as look to prove up further mineralisation
>0.40% Ni around hole MTRC016 in the core of the Complex, as a “starter pit” resource.
ASX:WMG
www.westernmines.com.au
9
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
JASPER HILL
The Jasper Hill Project comprises exploration licences E39/2073, E39/2079 and prospecting licence P39/6267
(P39/6267 was granted during the quarter). The project is located approximately 80km southeast of Laverton
and covers part of the poorly exposed Merolia Greenstone Belt, a NNW trending belt, up to 20km wide, that can
be traced over 110km in a SSE direction from the Burtville Mining Centre. The project area is lightly explored,
due to being partly under shallow cover, but is contiguous to the historical producing mines of Lord Byron
(160,000oz at 1.0g/t Au) and Fish (87,000oz at 4.1g/t Au).
Jasper Hill is the Company’s primary gold project containing a mineralised gold trend over 3km strike. The
Company as completed field reconnaissance work involving geological mapping, high-resolution ground
magnetic survey and locating historical drill collars and registered aboriginal heritage sites.
Following the grant of P39/6267 the Company has completed a desktop review of the project and made plans
for extensive fieldwork campaigns involving ground magnetic (extending current coverage), ground gravity and
soil and rock chip sampling surveys for the current period.
Figure 5: WMG ground magnetic survey and significant historical drill intersections (E39/2073 and P39/6267)
ASX:WMG
www.westernmines.com.au
10
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
YOUANMI
The Youanmi Project comprises exploration licence E57/1119. The project is located 70km southwest of
Sandstone and lies on the eastern side of the Youanmi Greenstone Belt, along the major Youanmi Shear.
The tenement is located 7km from the historic Youanmi Gold Mining Centre, which has produced over
600,000oz of gold since its discovery in the late 1800’s, currently owned by Rox Resources (ASX:RXL) and
Venus Metals (ASX:VMC). The area has seen a resurgence in exploration activity with the recent discovery of the
high-grade Penny North (ASX:RMS) and Grace (ASX:RXL) deposits along the Youanmi Shear.
A site visit for field reconnaissance and part of a high-resolution ground magnetic survey were completed during
2023. Following a review of the project and identification of the historical Deep Well prospect the Company
undertook further fieldwork during the previous quarter involving ground gravity surveying. Results from the initial
gravity survey are being processed and further fieldwork will be planned at the project over the second half of
2024.
Figure 6: Historical Deep Well RAB drilling and WMG ground gravity survey points
ASX:WMG
www.westernmines.com.au
11
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
MELITA
The Melita Project comprises exploration licence E40/379, covering an area of approximately 105km2. The
project is located 20km south-southeast of Leonora and to the north of the Kookynie, Niagara and Orient WellButterfly gold mining centres, in the heart of the WA Goldfields. The Kookynie area has seen recent upswing in
exploration, with WMG’s Melita Project surrounded by the likes of Genesis Minerals (ASX:GMD), Saturn Metals
(ASX:STN), Azure Minerals (ASX:AZS), KIN Mining (ASX:KIN) and .
The Company notes the increase in M&A activity around the Leonora-Kookynie area and undertook a review of
the project, including soil geochemical and ground magnetic data collected during a series of WMG field
campaigns (ASX, Major Field Program Commences at Melita, 11 August 2021; Completion of Initial Field
Program at Melita, 16 September 2021).
During the previous quarter the Company completed a field visit to the Melita Project. A high resolution ground
gravity survey was completed over the Airstrip Gossan area, along with geological mapping and sampling. A
number of additional outcrops of Cu-Pb-Zn gossans were identified and sampled. At the Princess Melita area
additional geological mapping of historical workings, sampling and metal detecting was undertaken. The results
of this fieldwork are being interpreted and will be used to plan further work.
Figure 7: Technical Director Dr Ben Grguric examining historical gold workings at the Melita Project
ASX:WMG
www.westernmines.com.au
12
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
PINYALLING
The Pinyalling Project comprises exploration licence E59/2486 covering 55km2. The project is located
approximately 25km NW of Paynes Finds and lies at the south-eastern end of the Yalgoo-Singleton Greenstone
Belt, within an area known as the Warriedar Fold Belt that comprises a folded sequence of gabbro and dolerite
intercalated with basalt, ultramafics, sediments and BIF. The Warriedar Fold Belt hosts a number of historic gold
workings at the Pinyalling Mining Centre, 3km north of the tenement area, as well as the Baron Rothschild
prospect drilled by Thundelarra Exploration during the 1990s.
The Company engaged remote sensing specialists Earthscan Pty Ltd to complete satellite based remote
sensing work over the project area, using ASTER multispectral imagery. This work was principally focused on
mapping pegmatite sequences that could potentially host lithium mineralisation.
During a previous quarter, the Company completed an initial field reconnaissance visit to the project area to
ground-truth targets identified by the remote sensing work. A number of sub-cropping and outcropping
pegmatites were encountered and sampled. In general the tenement area contained a lot more remnant
greenstone belt lithologies than the simple granitic terrane shown on the GSWA geological mapping of the area.
These possible extensions of the nearby Warriedar Fold Belt increase the gold potential of the project area than
first thought. A soil sampling survey to test the gold potential of the project area is being planned.
Figure 8: Example of sub-cropping pegmatite at the Pinyalling Project
ASX:WMG
www.westernmines.com.au
13
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
PAVAROTTI
The Pavarotti Project comprises exploration licence E77/2478 and exploration licence application E77/2746.
The project is located approximately 50km north-northeast of Southern Cross and lies on the western side of
the Koolyanobbing Greenstone Belt, a northwest trending sequence of mafic and ultramafic volcanic and
intrusive rocks with lesser sediments intercalated with BIF horizons forming prominent ridges. The BIF horizons
have been exploited since the 1960s, with several open pit iron ore mines that are currently owned by Mineral
Resources (ASX:MIN).
Historical rock chip samples from Jock’s Fury show anomalous results of up to 0.74% Ni, 0.11% Cu and
0.22g/t Pt+Pd over 140m strike. BHP drilled several shallow holes at Jocks Fury in the late 1960’s including
H202 intersecting 4.6m at 1.28% Ni, 597ppm Cu, 293ppm Co from 42.7m to the end of hole (EOH) and H273
intersecting 16.8m at 0.78% Ni, 360ppm Cu, 285ppm Co from 12.2m, including 3.1m at 1.60% Ni, 865ppm
Cu, 700ppm Co from 24.4m.
No exploration work was done on the project during the quarter. The Company continues to wait on the grant of
tenement application E77/2746, containing Jock’s Fury, in order to commence exploration.
ROCK OF AGES
The Rock of Ages Project comprises prospecting licence P38/4203 and is located approximately 32km
southeast of Laverton. The project lies on the Laverton Greenstone Belt, around 4.5km south of the historical
Burtville Mining Centre. The tenement contains the historical Rock of Ages workings, a series of shallow mine
workings over approximately 600m strike, associated with quartz veining and ferruginous cherts, within felsic
volcanic schists. Historical records indicate 2,074oz Au was mined from the workings between 1902 and 1911
at an average grade of 50g/t Au.
No exploration work was done on the project during the quarter.
BROKEN HILL BORE
The Broken Hill Bore Project comprises exploration licence E31/1222 and is located approximately 160km
northeast of Kalgoorlie, near Edjudina. The Edjudina region hosts a number of significant gold deposits such as
Northern Star’s (ASX:NST) Carosue Dam Project, the Edjudina Gold Camp, 9km south of the project and the
Patricia workings along strike. The Yarri and Porphyry Gold Camps are located in the Murrin Domain 18km to
the west and the Deep South Deposits in the Linden Domain to the north east.
A review of the project was completed during the quarter and plans made for a field visit during the current
quarter.
For further information please contact:
Dr Caedmon Marriott
Managing Director
Tel: +61 475 116 798
Email: contact@westernmines.com.au
This announcement has been authorised for release to the ASX by the Board of Western Mines Group Ltd
ASX:WMG
www.westernmines.com.au
14
ASX RELEASE | QUARTERLY ACTIVITIES REPORT JUNE 2024
QUARTERLY ACTIVITY REPORTS BY MINING EXPLORATION ENTITIES
ASX LISTING RULE 5.3
ASX LISTING RULE 5.3.1 - EXPLORATION ACTIVITIES
Exploration and Evaluation during the quarter was $1,365,358, a similar level the previous quarter as the Phase
2 RC program at Mulga Tank was completed, diamond drilling was undertaken and geochemical assays results
were received. Major items of expenditure were the Mulga Tank RC and diamond drilling and geochemical assay
costs.