FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
HIGHLIGHTS
• Exploration update on progress of Phase 3 RC program at the Mulga Tank Ni-Co-Cu-PGE Project
• Completion of first 19 holes for a total of 6,002m with average hole depth of 316m
• Drilling focused on infilling and extending mineralisation within the main body of the Mulga Tank
Complex - focused to the south of the high-grade results in MTRC032 and MTRC038
• Currently pre-collaring regional RC drilling of 5 holes testing interpreted komatiite channels within
tenement E39/2134 - being drilled with the aid of an EIS grant
• Successfully completed multi-hole DHEM survey of deep diamond holes MTD027 and MTD029
and several RC holes where shallow high-grade semi-massive sulphide was observed
• Initial metallurgical testwork on bulk sample material from MTD029 (EIS3) remains ongoing
• Further exploration modelling and targeting work as WMG looks to advance and de-risk a globally
significant, large-scale, open-pitable nickel sulphide deposit at Mulga Tank
Western Mines Group Ltd (WMG or Company) (ASX:WMG) is pleased to update shareholders on the progress
of exploration activities at the Mulga Tank Ni-Cu-Co-PGE Project, on the Minigwal Greenstone Belt, in Western
Australia’s Eastern Goldfields; including the current Phase 3 reverse circulation (RC) drilling program and recent
multi-hole Down Hole ElectroMagnetic (DHEM) survey.
To date, 19 holes of the Phase 3 RC program have been drilled, totalling 6,002m. These holes are all located
within the main body of the Mulga Tank Ultramafic Complex. The majority of the holes were designed to test to
the south of the previous core area of drilling and in particular to follow-up on holes MTRC032 and MTRC038
which returned high-grade results at the southern extent of previous drilling. Seven of the holes also looked to
infill around previous drilling in the core area of the Complex, with four holes around Phase 1 RC hole MTRC016
and three holes in the eastern area between holes MTRC006 and MTRC034 to holes MTD027 and MTRC019.
The drill rig has now changed back to mud rotary pre-collaring of the remaining holes of the program over the
next 1.5 to 2 weeks. This includes a 5 hole, ~2,000m regional RC program, the first to test the interpreted
komatiite channels in tenement E39/2134. These regional RC holes will be drilled with the aid of one of WMG’s
current Exploration Incentive Scheme (EIS) grants (ASX, WMG Wins Two More EIS Awards to Drill Mulga Tank,
29 April 2024).
A multi-hole DHEM survey was completed during August. Deep diamond holes MTD027 and MTD029 (EIS3),
and RC holes MTRC015, MTRC018, MTRC024, MTRC032 and MTRC038 were all successfully surveyed.
Western Mines Group Ltd
Level 3, 33 Ord Street
West Perth WA 6005
ASX:WMG
Telephone: +61 475 116 798
Email: contact@westernmines.com.au
www.westernmines.com.au
Shares on Issue: 80.90m
Share Price: $0.28
Market Cap: $22.65m
Cash: $2.13m (30/06/24)
1
ASX RELEASE | FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
Results from the DHEM survey identified anomalies associated with the visual sulphide mineralisation observed
in each of the holes. The results from holes MTRC015 and MTRC018 in particular are being further investigated,
these holes will possibly be re-entered and drilling extended to target off-end of hole anomalies and/or to better
define the anomalies identified.
Commenting on the progress of the Phase 3 RC, WMG Managing Director Dr Caedmon Marriott said:
“We’re making steady progress on our Phase 3 RC program with 19 of the holes now complete for
just over 6,000m. The rig has now changed back to mud rotary pre-collaring for the remaining
holes, which should take around 1.5 to 2 weeks and then we’ll commence the final RC drilling.
Samples from each of these holes have been submitted to the lab on the completion of each hole
and we expect to start to see a regular flow of results start coming through in the next few weeks.
After further weather related delays we were finally able to get a DHEM crew to site who completed
a DHEM survey in August. This was the most successful survey to date, in terms of holes able to
be surveyed, with all holes except deep diamond hole MTD028 (blocked) able to be surveyed to
near bottom of hole. Anomalies were seen, generally relating to visual sulphide mineralisation
observed, in each of the holes. Further investigation into the results of holes MTRC015 and
MTRC018 is being undertaken and these holes may look to be re-entered and extended to target
possible off-end of hole targets.”
MULGA TANK EXPLORATION PROGRAMS
Exploration results from the Company’s various drilling programs at the Mulga Tank Project over the last 12
months have demonstrated significant nickel sulphide mineralisation and an extensive nickel sulphide mineral
system within the Mulga Tank Ultramafic Complex.
WMG recently completed a 17 hole 5,534m Phase 2 RC drilling program and another EIS co-funded deep
diamond hole at the project (ASX, Completion of Phase 2 RC Drilling Commencement of EIS3, 8 April 2024;
High-Grade Sulphide Segregations at Depth in MTD029 (EIS3), 29 May 2024). This two pronged approach uses
RC to infill and prove up the extent of shallow disseminated nickel sulphide mineralisation, defined by the
Company’s JORC Exploration Target modelling (ASX, Mulga Tank JORC Exploration Target, 5 February 2024),
whilst the diamond drilling program continues to test deeper targets.
The Company has planned a combination of both further RC and diamond drilling. Additional drill holes will
continue to be added to these programs, with ongoing targeting work, as the Company systematically explores
the Mulga Tank Ultramafic Complex.
PHASE 3 RC DRILLING
A further 23 hole RC drilling program, totalling approximately 7,000m, is planned within the main body of the
Mulga Tank Ultramafic Complex (ASX, Exploration Activities Recommence at Mulga Tank, 4 July 2024). The
majority of the holes are designed to test to the south of the previous core area of drilling and in particular to
follow-up on holes MTRC032 and MTRC038 which returned high-grade results at the southern extent of
previous drilling - demonstrating this area to be open and highly prospective.
ASX:WMG
www.westernmines.com.au
2
ASX RELEASE | FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
Seven of the holes also look to infill around previous drilling in the core area of the Complex, with four holes
around Phase 1 RC hole MTRC016 and three holes in the eastern area between holes MTRC006 and
MTRC034 to holes MTD027 and MTRC019.
MTRC016 returned 200m at 0.30% Ni, 139ppm Co from 103m, including 35m at 0.45% Ni, 177ppm Co from
162m, which included 13m at 0.53% Ni, 208ppm Co from 183m.
Three holes planned between holes MTRC006 and MTRC034 across to holes MTD027 and MTRC019 are
design to infill and follow-up on higher grade results from MTRC006 1m at 1.19% Ni from 277m and 1m at
0.96% Ni from 289m, and MTRC034 240m at 0.30% Ni, 133ppm Co from 90m.
To date, 19 of the 23 holes within the main body of the Complex have now been drilled totalling 6,002m.
Figure 1: Phase 3 RC Drilling Planned and Complete
ASX:WMG
www.westernmines.com.au
3
ASX RELEASE | FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
HoleID
Easting (MGA51)
Northing (MGA51)
Total Depth (m)
Azimuth
Dip
MTRC040
520891
6689103
438
270
-70
MTRC041
520801
6689000
360
270
-70
MTRC042
521000
6688999
360
270
-70
MTRC043
520900
6688920
360
270
-70
MTRC044
520500
6688500
360
270
-70
MTRC045
520700
6688500
300
270
-70
MTRC046
520900
6688500
300
270
-70
MTRC047
520050
6688340
300
270
-70
MTRC048
520250
6688340
300
270
-70
MTRC049
520500
6688350
300
270
-70
MTRC050
520700
6688350
300
270
-70
MTRC051
520900
6688350
284
270
-70
MTRC052
521101
6688500
300
270
-70
MTRC053
521300
6688500
300
270
-70
MTRC054
521100
6688350
300
270
-70
MTRC055
521300
6688350
300
270
-70
MTRC056
521515
6688850
300
270
-70
MTRC057
521715
6688850
300
270
-70
MTRC058
521700
6688700
300
270
-70
Table 1: Collar details and hole depths for Phase 3 RC drilling program at Mulga Tank
REGIONAL RC DRILLING
A 5 hole, ~2,000m regional RC program has been designed to test the interpreted komatiite channels and
targets on the Minigwal Greenstone Belt. These regional RC holes will be drilled with the aid of one of WMG’s
current Exploration Incentive Scheme (EIS) grants. The Company was successful in Round 29 of the EIS
program, with an award of $98,000 of co-funding towards 50% of the direct drilling costs of four RC holes
within tenement E39/2134 (ASX, WMG Wins Two More EIS Awards to Drill Mulga Tank, 29 April 2024). In
addition to the four EIS holes a fifth hole is planned targeting a magnetic feature within E39/2132 near the main
body of the Complex.
These RC holes will form part of the first belt-wide drilling program to begin testing the interpreted komatiite
channel system emanating from the main part of the Complex in a northwest direct up the Minigwal Belt. The
holes will look to both confirm the interpreted geology and also the prospectivity of the channels to host highgrade Kambalda-style massive sulphide mineralisation.
The rig is currently mud rotary drilling the pre-collars for these remaining holes of the Phase 3 program with RC
drilling expected to recommence in mid-September.
ASX:WMG
www.westernmines.com.au
4
ASX RELEASE | FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
Figure 2: Regional RC Drilling Planned
DHEM SURVEY
A multiple hole DHEM survey was successfully undertaken in August, that was designed to test the central core
area of the Mulga Tank Complex. All planned holes were able to be surveyed to essentially bottom of hole, with
the exception of deep diamond hole MTD028 which was found to be repeatedly blocked despite attempts at
flushing it out.
Results from the DHEM survey identified anomalies associated with the visual sulphide mineralisation observed
in each of the holes. The results from holes MTRC015 and MTRC018 in particular are being further investigated,
these holes will possibly be re-entered and extended to target off-end of hole anomalies and/or to better define
the anomalies identified.
ASX:WMG
www.westernmines.com.au
5
ASX RELEASE | FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
Figure 3: DHEM Survey Plan
HoleID
Hole Depth
Surveyed
Comments
MTD027
1662.3m
110-1450m
Minor inhole/offhole anomalism apparent 440-460m, 880-920m, 1260-1290m DH. Broad/
stratigraphic inhole/offend type anomaly centred >1450m DH.
MTD029
1722m
130-1690m
Minor inhole/offhole anomalism apparent 480-500m, 680-700m, 1010-1030m DH. Broad/
stratigraphic inhole/offend type anomaly centred >1600m DH.
MTRC015
300m
10-290m
Minor inhole/offhole anomalism apparent 170-190m, 210-240m DH. Stringer-type sulphides
appear to relate to visual NiCuS at 172m, 185m and 229m. Broader inhole/offend type
anomaly defined at 270-290m DH. Worth extending hole and completing extended DHEM.
MTRC018
312m
20-292m
Minor inhole/offhole anomalism apparent 165-175m, 280-290m DH. Stringer-type
sulphides. Broader offend type anomaly defined at >292m DH. Possibly worth extending
hole and completing extended DHEM.
MTRC024
360m
14-350m
Minor inhole/offhole anomalism apparent 190-220m, 240-260m DH. Stringer-type sulphides
appear to relate to visual NiS/NiCuS at 202m and 253m. Broad building anomalous
response apparent towards end of hole in Z/Y components.
MTRC032
306m
16-300m
Minor inhole/offhole anomalism apparent 115-125m, 130-145m, 210m and 245-280m DH.
Stringer-type sulphides appear to relate to visual NiS/NiCuS at 131m and 254-260m.
MTRC034
318m
26-310m
Minor inhole/offhole anomalism apparent 120-140m, 160-180m, 190-210m DH. Stringertype sulphides appear to relate to visual NiS/NiCuS at 122m, 135m, 169m and 192m.
Table 2: DHEM Survey Results
ASX:WMG
www.westernmines.com.au
6
ASX RELEASE | FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
MTD029 (EIS3) INITAL METALLURGICAL TESTWORK
A 112kg bulk sample of HQ quarter core was collected from recent diamond deep diamond hole MTD029
(EIS3) over four intervals totalling 62m (between 159m to 275m depth) for initial metallurgical test work on the
shallow disseminated nickel sulphide mineralisation (ASX, Continuous Mineralisation in Upper Part of MTD029, 1
July 2024).
Initial preparation, grind size establishment and a number of stages of initial rougher flotation test work have
been undertaken on the material demonstrating recoverability of the sulphide mineralisation. Further floatation
test work is ongoing and full results will be reported to shareholders when received.
The Company looks forward to updating shareholders on the ongoing exploration activities and the continuing
progress at Mulga Tank as further results are received.
For further information please contact:
Dr Caedmon Marriott
Managing Director
Tel: +61 475 116 798
Email: contact@westernmines.com.au
This announcement has been authorised for release to the ASX by Dr Caedmon Marriott, Managing Director
ASX:WMG
www.westernmines.com.au
7
ASX RELEASE | FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
ABOUT WMG
Western Mines Group Ltd
Western Mines Group Ltd (ASX:WMG) is a mineral exploration company driven by the goal
ACN 640 738 834
Level 3, 33 Ord Street
West Perth
WA 6005
to create significant investment returns for our shareholders through exploration and
discovery of high-value gold and nickel sulphide deposits across a portfolio of highlyprospective projects located on major mineral belts of Western Australia.
Our flagship project and current primary focus is the Mulga Tank Ni-Co-Cu-PGE Project, a
Board
Rex Turkington
Non-Executive Chairman
Dr Caedmon Marriott
Managing Director
major ultramafic complex found on the under-explored Minigwal Greenstone Belt. WMG’s
exploration work has discovered significant nickel sulphide mineral system and is
considered highly prospective for globally significant Ni-Co-Cu-PGE deposits.
The Company’s primary gold project is Jasper Hill, where WMG has strategically
Francesco Cannavo
Non-Executive Director
consolidated a 3km mineralised gold trend with walk-up drill targets. WMG has a diversified
Dr Benjamin Grguric
Technical Director
Leonora in the heart of the WA Goldfields; Youanmi (Au), Pavarotti (Ni-Cu-PGE), Rock of
Capital Structure
Shares: 80.90m
Options: 19.20m
Share Price: $0.28
Market Cap: $22.65m
Cash (30/06/24): $2.13m
Follow us
portfolio of other projects including Melita (Au, Cu-Pb-Zn), midway between Kookynie and
Ages (Au), Broken Hill Bore (Au) and Pinyalling (Au, Cu, Li).
COMPETENT PERSONS STATEMENT
The information in this announcement that relates to Exploration Results and other technical
information complies with the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and has been
compiled and assessed under the supervision of Dr Caedmon Marriott, Managing Director
of Western Mines Group Ltd. Caedmon is a Member of the Australian Institute of
@westernmines
Geoscientists, a Member of the Society of Economic Geologists and a Member of the
westernmines
Australasian Institute of Mining and Metallurgy. He has sufficient experience that is relevant
Western Mines Group
to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
JORC Code. Caedmon consents to the inclusion in this announcement of the matters
based on his information in the form and context in which it appears.
DISCLAIMER
Some of the statements appearing in this announcement may be in the nature of forward looking statements. You should be
aware that such statements are only predictions and are subject to inherent risks and uncertainties. Those risks and
uncertainties include factors and risks specific to the industries in which WMG operates and proposes to operate as well as
general economic conditions, prevailing exchange rates and interest rates and conditions in the financial markets, among
other things. Actual events or results may differ materially from the events or results expressed or implied in any forward
looking statement. No forward looking statement is a guarantee or representation as to future performance or any other
future matters, which will be influenced by a number of factors and subject to various uncertainties and contingencies, many
of which will be outside WMG’s control.
WMG does not undertake any obligation to update publicly or release any revisions to these forward looking statements to
reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events. No representation or
warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions
or conclusions contained in this announcement. To the maximum extent permitted by law, none of WMG, its Directors,
employees, advisors or agents, nor any other person, accepts any liability for any loss arising from the use of the information
contained in this announcement. You are cautioned not to place undue reliance on any forward looking statement. The
forward looking statements in this announcement reflect views held only as at the date of this announcement.
ASX:WMG
www.westernmines.com.au
8
ASX RELEASE | FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
MULGA TANK PROJECT
JORC CODE, 2012 EDITION - TABLE 1
SECTION 1: SAMPLING TECHNIQUES AND DATA
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
ASX:WMG
JORC Code explanation
Commentary
• Nature and quality of sampling (eg cut channels, • Reverse circulation (RC) drilling was completed
random chips, or specific specialised industry
using standard industry best practice
standard measurement tools appropriate to the • Individual 1m samples were collected directly
minerals under investigation, such as down hole
from the rig sampling system. Samples will be
gamma sondes, or handheld XRF instruments, etc).
crushed and pulverised to produce a subThese examples should not be taken as limiting the
sample for analysis by either multi-element
broad meaning of sampling.
ICP-AES (ME-ICP61 and ME-ICP41), precious
metals fire assay (Au-AA25 or PGM-ICP23)
• Include reference to measures taken to ensure
sample representivity and the appropriate calibration
and loss on ignition at 1,000°C (ME-GRA05)
of any measurement tools or systems used.
• Down-Hole Electromagnetic (DHEM) survey
conducted by SGC Niche Acquisition, an
• Aspects of the determination of mineralisation that
are Material to the Public Report.
independent geophysical contractor
• In cases where ‘industry standard’ work has been • DHEM configuration/parameters:
done this would be relatively simple (eg ‘reverse Configuration: Down-hole EM (DHEM)
circulation drilling was used to obtain 1 m samples Receiver:
SMARTem24
from which 3 kg was pulverised to produce a 30 g Sensor:
DigiAtlantis
charge for fire assay’). In other cases more Transmitter:
TTX2
explanation may be required, such as where there is Loop Size:
1100m x 1100m (single turn)
coarse gold that has inherent sampling problems. Current:
80-100A
Unusual commodities or mineralisation types (eg Station Spacing: 2m, 5m, 10m and 20m
submarine nodules) may warrant disclosure of Base Frequency: 0.5Hz
detailed information.
Duty Cycle:
50%
Stacks:
64
Readings:
2-3 readings per station
• DHEM surveys are an industry standard
practise in testing the presence of bedrock
conductors potentially representing
mineralised sulphide bodies
• Drill type (eg core, reverse circulation, open-hole • Reverse circulation percussion drilling rig with
hammer, rotary air blast, auger, Bangka, sonic, etc)
a 5.25inch face sampling bit
and details (eg core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what
method, etc).
• Method of recording and assessing core and chip • Standard drilling techniques using “best
sample recoveries and results assessed.
practice” to maximise sample recovery
• Measures taken to maximise sample recovery and • Information not available to assess relationship
ensure representative nature of the samples.
between sample recovery and grade
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of fine/
coarse material.
www.westernmines.com.au
9
ASX RELEASE | FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
Criteria
Logging
Sub-sampling
techniques
and sample
preparation
JORC Code explanation
Commentary
• Whether core and chip samples have been • Drill holes geologically logged on a metre basis
geologically and geotechnically logged to a level of • Logging is to a level of detail sufficient to
detail to support appropriate Mineral Resource
support a Mineral Resource estimation,
estimation, mining studies and metallurgical studies.
though further information would be required
• Whether logging is qualitative or quantitative in • Logging is qualitative in nature and recorded
nature. Core (or costean, channel, etc) photography.
l i t h o l o g y, m i n e r a l o g y, m i n e r a l i s a t i o n ,
weathering, colour, and other features of the
• The total length and percentage of the relevant
samples. Chip trays were photographed in
intersections logged.
both dry and wet form
• Drillhole was logged in full, apart from rock
rolled pre-collar intervals
• If core, whether cut or sawn and whether quarter, half • Individual 1m samples were collected directly
or all core taken.
from the rig sampling system. Samples will be
crushed and pulverised to produce a subIf
non-core,
whether
riffled,
tube
sampled,
rotary
split,
•
sample for analysis by either multi-element
etc and whether sampled wet or dry.
ICP-AES (ME-ICP61 and ME-ICP41), precious
For
all
sample
types,
the
nature,
quality
and
•
metals fire assay (Au-AA25 or PGM-ICP23)
appropriateness of the sample preparation technique.
and loss on ignition at 1,000°C (ME-GRA05)
• Quality control procedures adopted for all subMajority of samples were dry however some
•
sampling stages to maximise representivity of
ground water was encountered and some
samples.
samples were taken wet
• Measures taken to ensure that the sampling is
Industry
standard sample preparation
•
representative of the in-situ material collected,
techniques
will be undertaken and considered
including for instance results for field duplicate/
appropriate for the sample type and material
second-half sampling.
sampled
• Whether sample sizes are appropriate to the grain
The
sample size is considered appropriate to
•
size of the material being sampled.
the grain size of the material being sampled
• The nature, quality and appropriateness of the • Samples analysed by four-acid digest multiassaying and laboratory procedures used and
element ICP-AES (ME-ICP61) or precious
whether the technique is considered partial or total.
metals fire assay (Au-AA25 or PGM-ICP23) are
considered total or near total techniques
For
geophysical
tools,
spectrometers,
handheld
XRF
•
instruments, etc, the parameters used in determining • Samples analysed by aqua regia digest multithe analysis including instrument make and model,
element ICP-AES (ME-ICP41) is considered a
reading times, calibrations factors applied and their
partial technique of soluble sulphide
Quality of
derivation, etc.
• Standards, blanks and duplicate samples were
assay data
introduced through-out the sample collection
• Nature of quality control procedures adopted (eg
and laboratory
standards, blanks, duplicates, external laboratory
on a 1:20 ratio to ensure quality control
tests
checks) and whether acceptable levels of accuracy • ALS also undertake duplicate analysis and run
(i.e. lack of bias) and precision have been established.
internal standards as part of their assay regime
• DHEM survey undertaken by SGC Niche
Acquistion using equipment described above
• Production reports reviewed and QA/QC of
the data is completed by the Company’s
consultant geophysicist
ASX:WMG
www.westernmines.com.au
10
ASX RELEASE | FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
Criteria
Verification of
sampling and
assaying
Location of
data points
Data spacing
and
distribution
JORC Code explanation
Commentary
• The verification of significant intersections by either • Primary logging data was collected using
independent or alternative company personnel.
Ocris logging system on a laptop computer,
• The use of twinned holes.
• Significant reported assay results were verified
by multiple alternative company personnel
• Documentation of primary data, data entry
procedures, data verification, data storage (physical • All logging and assay data was compiled into
and electronic) protocols.
a SQL database server
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill • Drill holes located using a handheld GPS with
holes (collar and down-hole surveys), trenches, mine
accuracy of +/-3m
workings and other locations used in Mineral • Downhole surveys were performed at collar
Resource estimation.
and end of hole
• Specification of the grid system used.
• Coordinates are in UTM Zone 51
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• The drilling completed was reconnaissance in
nature designed to test specific geological
• Whether the data spacing and distribution is sufficient
targets for first pass exploration purposes only
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and
O re R e s e r v e e s t i m a t i o n p ro c e d u re ( s ) a n d
classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves • The drilling was planned to be approximately
unbiased sampling of possible structures and the
perpendicular to the interpreted stratigraphy
extent to which this is known, considering the deposit
and mineralisation
Orientation of
type.
data in relation
to geological
• If the relationship between the drilling orientation and
structure
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
• The measures taken to ensure sample security.
Sample
security
• Samples delivered to the laboratory by
company personnel
• All data acquired by SGC Niche Acquisition
was reported to the Company’s consultant
geophysicist
Audits or
reviews
• The results of any audits or reviews of sampling • No audits or reviews of drilling sampling
techniques and data.
techniques or data by external parties at this
stage of exploration
• An internal review of sampling techniques and
data will be completed
• DHEM data was independently verified by the
Company’s consultant geophysicist Russell
Mortimer of Southern Geoscience Consultants
ASX:WMG
www.westernmines.com.au
11
ASX RELEASE | FIRST 19 PHASE 3 RC HOLES COMPLETE AT MULGA TANK
SECTION 2: REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and • Te n e m e n t s E 3 9 / 2 1 3 2 , E 3 9 / 2 1 3 4 a n d
ownership including agreements or material issues
E39/2223, tenement application E39/2299
with third parties such as joint ventures, partnerships, • Held 100% by Western Mines Group Ltd
overriding royalties, native title interests, historical
• 1% NSR to original tenement holder
sites, wilderness or national park and environmental
• Native Title held by Upurli Upurli Nguratja and
settings.
Nyalpa Pirniku
• The security of the tenure held at the time of reporting
No known registered sites of historical interest
•
along with any known impediments to obtaining a
within the tenement area
licence to operate in the area.
• Goldfields Priority Ecological Community
PEC54 borders eastern edge of project area
• Tenement is in good standing
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by • Previous exploration over the Mulga Tank
other parties.
project area by various companies dates back
to the 1980s
• Of these, more detailed exploration was
completed by BHP Minerals Pty Ltd (1982–
1984), MPI Gold Pty Ltd (1995–1999), North
Limited (1999–2000), King Eagle Resources
Pty Ltd (2004–2012), and Impact (2013–2018)
Geology
• Deposit type, geological setting and style of • The geology of the project area is dominated
mineralisation.
b y t h e i r re g u l a r s h a p e d M u l g a Ta n k
serpentinised metadunite intrusive body
measuring ~5km x 5km, hosted within
metasediments, mafic to felsic schists and
foliated metagranite of the northwest trending
Archean Minigwal Greenstone Belt
• Previous drilling intersected disseminated and
narrow zones of massive nickel-copper
sulphide mineralisation within the dunite
intrusion
• The intrusion is concealed under variable
thicknesses of cover (up to 70 m in places)
with the interpretation of the bedrock geology
based largely on aeromagnetic data and
limited drilling
Drill hole
information
ASX:WMG
• A summary of all information material to the • A listing of the drill hole information material to
understanding of the exploration results including a
the understanding of the exploration results
tabulation of the following information for all Material
provided in the body of this announcement
drill holes:
• The use of any data is recommended for
indicative purposes only in terms of potential
• easting and northing of the drill hole collar
Ni-Cu-PGE mineralisation and for developing
• elevation or RL (Reduced Level – elevation above
exploration targets
sea level in metres) of the drill hole collar
• d
Share your feedback
Discover